MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST  Not logged in MUGAST
Message ID: 52     Entry time: Thu Mar 21 10:37:47 2019
Author: Adrien and Valerian 
ExpNbr: TEST 
Type: MUST2 
Category: General 
Status: Fixed 
Target-Source: N/A 
Subject: Test TOF must2 
To make sure the mate work correctly we took an alpha run with a delayed fag on the MUVI stop:
- all mate register a time in the the middle of the range as expected (fag delayed by 350ns, range is 600ns)

Test with time calibrator, all channel are enable, pulser on channel 3 of each mate T1X:
- energy spectrum: pulser where we expect it.
- we expect to see a time calibrator spectrum on channel 3 of each mate. instead we see times spectrum on Channel 3 of mate 1 and 2, channel 12 of mate 1, channel 14 of mate2. nothing else

Conclusion

The problem was that the synctst had to be checked and ord unchecked
Attachment 1: Time_behavior_withDAS.png  26 kB  | Hide | Hide all
Time_behavior_withDAS.png

ELOG Home Page