Fixed, TEST, Fri Feb 22 14:36:35 2019, iulian, MUST2, Hardware, 3-alpha, test new cable for Must2 detectors. Cables OK! 
Cables put on Muvi3.
Testing procedure. Use the numbered cables to conect the annular detector (MG11) and check if ok: GECO writting on MUVI3 , ORD Present, DECS present, STOP present.
Couldn't check the spectra as they do not exist.

MUVI3

Entry 1Entry 2Entry 3Entry 4
Cable 1Cable 2Cable 3Cable 4
GECO writting OKOKOKOK
ORD Present OKOKOKOK
DECS Present NONONONO
STOP Present OKOKOKOK
Fixed, TEST, Fri Feb 22 15:54:30 2019, iulian , GRIT, Hardware, 3-alpha, run 40 3-alpha night run  run40_3alpha_mg1345.pngrun40_3alpha_mg79.png
Run 40

Alpha source run for trapezoid detectors during the night with pedestals aligned (with HV off) and zero suppression. Cooling at 15°C.
Thresholds at 500 keV.


On MUVI1
ChannelSpectra LabelDetectorVoltage
1 MG1 MG1 140V
2 MG3 MG3 160V
3 MG4 MG4 95V
4 MG5 MG5 150V



On MUVI2:
ChannelSpectra LabelDetectorVoltage
1 MG7 MG7 120V
2 MG9 MG1160V
3 MG10 -- --
4 MG11 -- --


TRIGGERS are:
GMT ch1 --> OR MUVI1
GMT ch2 --> OR MUVI2
GMT ch3 --> OR MUVI3 (nothing on it)

[S]Problem MG5?!
[/S]---> No real problem, just spectra definition on plot was incorrect
Pinned, TEST, Tue Feb 26 09:30:21 2019, Freddy, OTHER, Hardware, N/A, Cabling - MUVI / HT-BT / SA-SL Cabling_2019_03_01.pdf
Cabling scheme - to update until final
Fixed, TEST, Tue Feb 26 13:21:32 2019, iulian freddy , GRIT, Software, N/A, run 42 Calimero run MUVI 1 on X sectors 
run #42
Calimero MUVI1 X


run #41
Calimero MUVI secttor 1X
Fixed, TEST, Tue Feb 26 13:50:36 2019, iulian freddy , GRIT, Software, N/A, run 43 Calimero run MUVI 1 on Y sectors 
run #43
Calimero MUVI1 Y
Fixed, TEST, Tue Feb 26 14:52:49 2019, iulian freddy , GRIT, Software, N/A, run 44 Calimero run MUVI 2 on X sectors (bad run) run44_error_calimero.png
run #44 bad run
Calimero MUVI2 X

During the run we noticed that time calibrator is on MUVI1 only .
Fixed, TEST, Fri Mar 1 12:07:44 2019, Freddy, GRIT, General, 3-alpha, Efficiency reconstruction comparison.pdfcomparison.Calpha_eff.root
blue: reconstructed efficiency using alpha run 40 (arbitratily normalized)
red: simulated efficiency

There is a difference in angle for trapezoids -> to be investigated

Remark: Simulation curve seems wrong (maybe a target in detector file not removed)
Fixed, TEST, Mon Mar 4 12:28:26 2019, Valerian and Iulian, MUST2, General, 3-alpha, No DECS and acq error run 47-48-49. Das Saved after problem fixed run49_error_acq.png
Fixed. Solution:
1) CENTRUM not configured on GENTRUM Master
2) GMT matrix on GMT3 (2nd slave) was all 0

DAS saved after solution found
Fixed, TEST, Mon Mar 4 13:54:24 2019, iulian & Valerian, GRIT, Hardware, 3-alpha, run 50 3-alpha short run run50_3a_Must.pngrun50_3a_Must2.png
RUN 50
First 3a test with all Must2 detectors. HV on all set to 50 V for this test only to avoid any risks
Fixed, TEST, Mon Mar 4 14:34:31 2019, Valerian, Marlène, Iulian, MUST2, General, N/A, MUST2 positions (based on e755) Screenshot_2019-03-04_at_14.39.02.png
Based on experiment e755, the MUST2 config is the following :


T1, PCB10:

X128Y1.......X1
. .
. .
Y128.......


T2, PCB5:

Y128.......X128Y1
. .
. .
.......X1



T3, PCB4:

.......Y128
. .
. .
X1.......X128Y1



T4, PCB7:

X1.......
. .
. .
X128Y1.......Y128
Fixed, TEST, Mon Mar 4 15:30:31 2019, iulian Marlene & Valerian, MUST2, Hardware, 3-alpha, run 51 3-alpha run with Pedestals Aligned @ 13 deg Measured on cooling system  run51_HVs.pngrun51_3a_Must3_pedestalAligned.png
RUN 51
3a run with Pedestals Aligned but not suppressed
Fixed, TEST, Mon Mar 4 16:24:51 2019, valerian marlène, GRIT, General, , RUN52 3 alpha source 4MUST2 no pedestal HV_MUST2_during_run52.pngHV_MUST2_afternightrun52.png3alpha_source_4MUST2_nightrun52.png
RUN52
3 alpha source run with only 4MUST2 (in MUVI3) with pedestal suppression at 13 deg.
Fixed, , Mon Mar 4 17:22:29 2019, Marlene, GRIT, General, , Temperature on MUFEE MUST2 13deg 8x
Temperature given by DAS on MUVI3 (MUST2)
screenshots before run
after run : same values
Fixed, TEST, Tue Mar 5 10:16:03 2019, iulian, MUST2, Software, N/A, run 57 Gamme 300 ns Time Calibration run (Calimero) on MUVI 3 (MUST) X sectors more stats (10000) run57_calimero_config.pngrun57_calimero_mm1.png
RUNS 53,54,55,56 are bad runs

Run 57


Calimero on Muvi3 MM1(X)

Gamme 300 ns

Procedure:

0) HT on the detectors Off
1) Apply Das config
2) Put Das offline
3) Start Geco
4) Activate on each of the sector to calibrate the X side (see bellow image)
5) execute Calimero.exe in calimero directory
6) modify the calimero config on Geco (see bellow near config button)
7) Start the run in RCC
8) Start calimero (start button in Geco)
Fixed, TEST, Tue Mar 5 12:13:41 2019, iulian Marlene, MUST2, Software, N/A, run 60 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM1 X  run60_calimero_mm1X.pngrun60_calimero_mm1X_spectra.png
RUNS 58,59,60 are bad runs

Run 61


Calimero on Muvi3 MM1(X)

Gamme 600 ns

Procedure:

0) HT on the detectors Off
1) Apply Das config
2) Put Das offline
3) Start Geco
4) Activate on each of the sector to calibrate the X side (see bellow image)
5) execute Calimero.exe in calimero directory
6) modify the calimero config on Geco (see bellow near config button)
7) Start the run in RCC
8) Start calimero (start button in Geco)
Fixed, TEST, Tue Mar 5 15:53:04 2019, iulian Marlene, MUST2, Software, N/A, Calimero problems 
problems with Calimero solved by killing some processes on lpcgrit related with Narval.
to find the processes on lpcgrit:
ps aux | grep Cali*
ps aux | grep Narval

kill -9 all the ids

Other possible solution:

start_acq on lpcgrit
tk followed by kall
exit
Fixed, TEST, Tue Mar 5 16:20:11 2019, iulian Marlene, MUST2, Software, N/A, run 77 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM1 X . good run run77_calimero_mm1X_spectra.png
Run 76


Calimero on Muvi3 MM1(X)

Gamme 600 ns

Procedure:

0) HT on the detectors Off
1) Apply Das config
2) Put Das offline
3) Start Geco
4) Activate on each of the sector to calibrate the X side (see bellow image)
5) execute Calimero.exe in calimero directory
6) modify the calimero config on Geco (see bellow near config button)
7) Start the run in RCC
8) Start calimero (start button in Geco)
Fixed, TEST, Tue Mar 5 16:42:56 2019, iulian Marlene, MUST2, Software, N/A, run 79 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM2 X . good run run79_calimero_mm2X_spectra.png
Run 79

Run 78 bad
Calimero on Muvi3 MM2(X)

Gamme 600 ns

Procedure:

0) HT on the detectors Off
1) Apply Das config
2) Put Das offline
3) Start Geco
4) Activate on each of the sector to calibrate the X side (see bellow image)
5) execute Calimero.exe in calimero directory
6) modify the calimero config on Geco (see bellow near config button)
7) Start the run in RCC
8) Start calimero (start button in Geco)
Fixed, TEST, Tue Mar 5 17:11:29 2019, iulian Marlene, MUST2, Software, N/A, run 81 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM3 X . good run run81_calimero_mm3X_spectra.png
Run 81

Run 80 bad
Calimero on Muvi3 MM3(X)

Gamme 600 ns

Procedure:

0) HT on the detectors Off
1) Apply Das config
2) Put Das offline
3) Start Geco
4) Activate on each of the sector to calibrate the X side (see bellow image)
5) execute Calimero.exe in calimero directory
6) modify the calimero config on Geco (see bellow near config button)
7) Start the run in RCC
8) Start calimero (start button in Geco)
Fixed, TEST, Tue Mar 5 17:48:38 2019, iulian Marlene, MUST2, Software, N/A, run 82 Gamme 600 ns Time Calibration run (Calimero) on MUVI 3 MM4 X . good run run82_calimero_mm4X_spectra.png
Run 82

Calimero on Muvi3 MM4(X)

Gamme 600 ns

ELOG Home Page