Fixed, e786s, Wed Jun 26 04:54:07 2019, Freddy, AGATA, General, N/A, AGATA validation problem (solved)
|
Since about 4h20, we realized that AGATA validated events and timestamps have suddenly dropped on the AGATA display (yellow bars instead of green).
We checked the counting rate on MUGAST, VAMOS and FAG and there is no obvious problem on this side. Same for the MUGAST/VAMOS data on disk.
We call Emmanuel...
Problem solved by restarting entirely GTS Tree (that was broken).
Restarted at 5h37 with run 59. (it took about 30 min). |
Fixed, e786s, Wed Jun 26 05:33:50 2019, OttoRun, RUN, General, Cryo-3He, Run59
|
*************************
Run : 59
*************************
Start at 2019-06-26 05:32:53.325868
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
5 to 5h30 - Restarted GTS Tree by Emmanuel
6h00 - Validation broken again
Stop at 2019-06-26 09:44:56.521500
Stop comment: Stopping to Realign GTS Tree |
Fixed, e786s, Wed Jun 26 05:58:23 2019, Freddy, OFFLINE, General, N/A, Offline analysis run 56 and 58   
|
|
Fixed, e786s, Wed Jun 26 07:01:00 2019, Freddy, AGATA, General, N/A, AGATA validation problem - again - during run 59
|
30 min after Emmanuel left (around 6h00), the AGATA problem of validation reappeared...
TO BE SOLVED.... |
Fixed, e786s, Wed Jun 26 07:04:06 2019, Freddy, CATS, General, N/A, Update of CATS calibrations 
|
New calibrations in :
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
Calibration.txt was modified accordingly.
Attached are the CATS positions for run 56 and 58 (after the central strip problem) |
Fixed, e786s, Wed Jun 26 09:56:17 2019, Valerian and Adrien, RUN, General, Cryo-3He, Identification E-TOF MUGAST 
|
Light particle ID in MUGAST (no S1 because shitty time).
The red cut is on what we believe is deuterium.
The containt of the cut stop at 8MeV when gating on vamos. |
Fixed, e786s, Wed Jun 26 10:29:30 2019, OttoRun, RUN, General, Cryo-3He, Run60
|
========================================
*************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel
Stop at 2019-06-26 17:59:14.820418
Stop comment: change of Brho |
Fixed, e786s, Wed Jun 26 13:48:35 2019, mugast, OFFLINE, General, Cryo-3He, analysis
|
|
Fixed, e786s, Wed Jun 26 14:40:58 2019, OttoRun, RUN, General, Cryo-3He, Run60 6x
|
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
Fixed, e786s, Wed Jun 26 15:48:50 2019, OttoRun, RUN, General, Cryo-3He, Run60
|
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
No beeam from 15.00. According to PCP, there will be no beam for a while |
Fixed, e786s, Wed Jun 26 15:50:36 2019, OttoRun, RUN, General, Cryo-3He, Run60
|
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 60
*************************
Start at 2019-06-26 10:21:51.572979
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Restarted GTS Tree by Emmanuel |
|
No Beam since 15:00. According to PCP there will be no beam for a while. |
Fixed, e786s, Wed Jun 26 16:59:07 2019, Louis, BEAM, General, Cryo-3He, Beam interuption
|
Beam stopped from 15h to 17h due to source instabilities |
Fixed, e786s, Wed Jun 26 18:12:18 2019, OttoRun, RUN, General, Cryo-3He, Run62
|
*************************
Run : 62
*************************
Start at 2019-06-26 18:09:42.882502
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF
Stop at 2019-06-27 02:19:17.492600
Stop comment: Problems with AGATA, run stopped |
Fixed, e786s, Wed Jun 26 20:46:20 2019, Sylvain, Louis, RUN, General, Cryo-3He, run 62 screenshots 18x
|
|
Fixed, e786s, Thu Jun 27 00:26:37 2019, mugast, OFFLINE, General, , statistics until now
|
Maybe some stat still to recover from better gate and mass and Z reconstruction.
Andrea |
Fixed, e786s, Thu Jun 27 03:33:26 2019, OttoRun, RUN, General, Cryo-3He, Run63
|
*************************
Run : 63
*************************
Start at 2019-06-27 03:33:09.910218
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF
%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Current ~ 30 kHz.
The cryo target pressure and temperature have slightly increased during the stop for the recover of AGATA, even before the refilling of the LHe tank.
It is probably due to a problem in the refilling of liquid nitrogen.
Stop at 2019-06-27 11:46:17.108352
Stop comment: stop |
Fixed, e786s, Thu Jun 27 12:28:58 2019, OttoRun, RUN, General, Cryo-3He, Run67
|
*************************
Run : 67
*************************
Start at 2019-06-27 12:28:26.879061
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF
Stop at 2019-06-27 12:46:41.949098
Stop comment: |
Fixed, e786s, Thu Jun 27 16:35:45 2019, OttoRun, RUN, General, Cryo-3He, Run68
|
*************************
Run : 68
*************************
Start at 2019-06-27 16:35:24.351472
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000 |
Fixed, e786s, Thu Jun 27 16:41:55 2019, OttoRun, RUN, General, Cryo-3He, Run65
|
*************************
Run : 65
*************************
Start at 2019-06-27 11:35:21.078920
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF
Stop at 2019-06-27 17:39:22.529443
Stop comment: |
Fixed, e786s, Thu Jun 27 17:43:15 2019, OttoRun, RUN, General, Cryo-3He, Run69
|
*************************
Run : 69
*************************
Start at 2019-06-27 17:42:38.280555
target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- CMG
Test with only MUGAST back trigger
Stop at 2019-06-27 17:54:02.829540
Stop comment: |
|