MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 17 of 132  Not logged in MUGAST
Status ExpNbrdown Date Author Type Category Target-Source Subject
Fixede786s Wed Jun 26 04:54:07 2019 FreddyAGATAGeneralN/AAGATA validation problem (solved)
Since about 4h20, we realized that AGATA validated events and timestamps have suddenly dropped on the AGATA display (yellow bars instead of green).
We checked the counting rate on MUGAST, VAMOS and FAG and there is no obvious problem on this side. Same for the MUGAST/VAMOS data on disk.

We call Emmanuel...

Problem solved by restarting entirely GTS Tree (that was broken).

Restarted at 5h37 with run 59. (it took about 30 min).
Fixede786s Wed Jun 26 05:33:50 2019 OttoRunRUNGeneralCryo-3HeRun59
*************************
Run : 59
*************************

Start at 2019-06-26 05:32:53.325868

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

5 to 5h30 - Restarted GTS Tree by Emmanuel
6h00 - Validation broken again

Stop at 2019-06-26 09:44:56.521500
Stop comment: Stopping to Realign GTS Tree
Fixede786s Wed Jun 26 05:58:23 2019 FreddyOFFLINEGeneralN/AOffline analysis run 56 and 58
Attachment 1: run56-58_analysis.png
run56-58_analysis.png
Attachment 2: run56-59_analysis_gammarays.png
run56-59_analysis_gammarays.png
Attachment 3: run56_analysis.png
run56_analysis.png
Attachment 4: run58_analysis.png
run58_analysis.png
Fixede786s Wed Jun 26 07:01:00 2019 FreddyAGATAGeneralN/AAGATA validation problem - again - during run 59
30 min after Emmanuel left (around 6h00), the AGATA problem of validation reappeared...

TO BE SOLVED....
Fixede786s Wed Jun 26 07:04:06 2019 FreddyCATSGeneralN/AUpdate of CATS calibrations
New calibrations in :
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt
/home/mugast/analysis/nptool/Projects/calibration/cats/CATS2_X.vamos2019_e786s.npt

Calibration.txt was modified accordingly.
Attached are the CATS positions for run 56 and 58 (after the central strip problem)
Attachment 1: run56_cats_newcal.png
run56_cats_newcal.png
Attachment 2: run_58_cats_newcal.png
run_58_cats_newcal.png
Fixede786s Wed Jun 26 09:56:17 2019 Valerian and AdrienRUNGeneralCryo-3HeIdentification E-TOF MUGAST
Light particle ID in MUGAST (no S1 because shitty time).

The red cut is on what we believe is deuterium.

The containt of the cut stop at 8MeV when gating on vamos.
Attachment 1: ETOF_d.pdf
ETOF_d.pdf
Attachment 2: ETOF_d_vamos.pdf
ETOF_d_vamos.pdf
Fixede786s Wed Jun 26 10:29:30 2019 OttoRunRUNGeneralCryo-3HeRun60
========================================
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel

Stop at 2019-06-26 17:59:14.820418
Stop comment: change of Brho
Fixede786s Wed Jun 26 13:48:35 2019 mugastOFFLINEGeneralCryo-3Heanalysis
Attachment 1: Ekine_Ex_run56_58.png
Ekine_Ex_run56_58.png
Fixede786s Wed Jun 26 14:40:58 2019 OttoRunRUNGeneralCryo-3HeRun60

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel
Attachment 1: run60.png
run60.png
Attachment 2: run60_1.png
run60_1.png
Attachment 3: run60_2.png
run60_2.png
Attachment 4: run60_3.png
run60_3.png
Attachment 5: run60_4.png
run60_4.png
Attachment 6: run60_5.png
run60_5.png
Fixede786s Wed Jun 26 15:48:50 2019 OttoRunRUNGeneralCryo-3HeRun60

OttoRun wrote:

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel


No beeam from 15.00. According to PCP, there will be no beam for a while
Attachment 1: run60_6.png
run60_6.png
Fixede786s Wed Jun 26 15:50:36 2019 OttoRunRUNGeneralCryo-3HeRun60

OttoRun wrote:

OttoRun wrote:
*************************
Run : 60
*************************

Start at 2019-06-26 10:21:51.572979

target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Restarted GTS Tree by Emmanuel


No Beam since 15:00. According to PCP there will be no beam for a while.
Attachment 1: run60_6.png
run60_6.png
Fixede786s Wed Jun 26 16:59:07 2019 LouisBEAMGeneralCryo-3HeBeam interuption
Beam stopped from 15h to 17h due to source instabilities
Fixede786s Wed Jun 26 18:12:18 2019 OttoRunRUNGeneralCryo-3HeRun62
*************************
Run : 62
*************************

Start at 2019-06-26 18:09:42.882502

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 02:19:17.492600
Stop comment: Problems with AGATA, run stopped
Fixede786s Wed Jun 26 20:46:20 2019 Sylvain, LouisRUNGeneralCryo-3Herun 62 screenshots
Attachment 1: Vamos10.png
Vamos10.png
Attachment 2: Vamos9.png
Vamos9.png
Attachment 3: Vamos8.png
Vamos8.png
Attachment 4: Vamos7.png
Vamos7.png
Attachment 5: Vamos6.png
Vamos6.png
Attachment 6: Vamos5.png
Vamos5.png
Attachment 7: Vamos4.png
Vamos4.png
Attachment 8: Vamos3.png
Vamos3.png
Attachment 9: Vamos2.png
Vamos2.png
Attachment 10: Vamos1.png
Vamos1.png
Attachment 11: Vamos.png
Vamos.png
Attachment 12: MGToD3.png
MGToD3.png
Attachment 13: MGToD2.png
MGToD2.png
Attachment 14: MGToD1.png
MGToD1.png
Attachment 15: MMToD.png
MMToD.png
Attachment 16: MGImpact.png
MGImpact.png
Attachment 17: MMImpact.png
MMImpact.png
Attachment 18: scaler.png
scaler.png
Fixede786s Thu Jun 27 00:26:37 2019 mugastOFFLINEGeneral statistics until now
Maybe some stat still to recover from better gate and mass and Z reconstruction.

Andrea
Attachment 1: cqnvqs_.png
cqnvqs_.png
Fixede786s Thu Jun 27 03:33:26 2019 OttoRunRUNGeneralCryo-3HeRun63
*************************
Run : 63
*************************

Start at 2019-06-27 03:33:09.910218

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%%
Current ~ 30 kHz.
The cryo target pressure and temperature have slightly increased during the stop for the recover of AGATA, even before the refilling of the LHe tank.
It is probably due to a problem in the refilling of liquid nitrogen.

Stop at 2019-06-27 11:46:17.108352
Stop comment: stop
Fixede786s Thu Jun 27 12:28:58 2019 OttoRunRUNGeneralCryo-3HeRun67
*************************
Run : 67
*************************

Start at 2019-06-27 12:28:26.879061

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 12:46:41.949098
Stop comment:
Fixede786s Thu Jun 27 16:35:45 2019 OttoRunRUNGeneralCryo-3HeRun68
*************************
Run : 68
*************************

Start at 2019-06-27 16:35:24.351472

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Fixede786s Thu Jun 27 16:41:55 2019 OttoRunRUNGeneralCryo-3HeRun65
*************************
Run : 65
*************************

Start at 2019-06-27 11:35:21.078920

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000

Crate in System faillure.
Moving FIFO FPMW to other crate. Had to change the cable (3ns to 5ns).
To be accounted for in the TOF

Stop at 2019-06-27 17:39:22.529443
Stop comment:
Fixede786s Thu Jun 27 17:43:15 2019 OttoRunRUNGeneralCryo-3HeRun69
*************************
Run : 69
*************************

Start at 2019-06-27 17:42:38.280555

target 700mb
Brho0=0.90 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted

AGATA position +51-25 mm

TRIGGER :
- CMG


Test with only MUGAST back trigger

Stop at 2019-06-27 17:54:02.829540
Stop comment:

ELOG Home Page