Status ExpNbr Date Author Type Category Target-Sourcedown Subject Text Attachments
Fixede768s Fri Jul 26 19:00:15 2019 mugastONLINEGeneral Run number 152_2   19x 
Fixede768s Fri Jul 26 19:36:03 2019 KseniiaAGATAGeneral 19Ne gammas, current full stat19Ne, VAMOS-identified
All runs from before + runs 151, 152part
 19Ne_112to152part.png 
Fixede768s Sat Jul 27 11:02:13 2019 mugastONLINEGeneral figures run 152   18x 
Fixede768s Sat Jul 27 21:12:47 2019 teodora & beyhanOTHERHardware cout rate with no beam & water level checkAround 9 pm, we observed an average count
rate of 30kHz on the "or agata" scaler rates
panel of GECO. The other count rates were
 6x 
Fixede768s Sat Jul 27 22:22:21 2019 teodora & beyhanVAMOSHardware FP_DC_Wi1 tripped -->FixedFP_DC_Wi1 tripped. We set back power supply
on the wire
=> fixed
  
Fixede768s Sun Jul 28 08:20:38 2019 Sylvain & FrancoRUNGeneral Update on possible restartThe problem that caused the interruption was
due to a failure in the cooling system.
The last update we've had is that we might
  
Fixede768s Sun Jul 28 16:23:48 2019 NicolasRUNGeneral Update on possible restartSame situation as before lunch, the beam is
still in C0 and not yet in CSS1. We may have
beam in late evening....
  
Ongoinge768s Sun Jul 28 19:58:57 2019 NicolasRUNGeneral Update on possible restartBeam is now at the exit of CSS2 though We
may have beam around midnight....[/quote]
  
Fixede768s Sun Jul 28 21:59:43 2019 NicolasRUNGeneral Update on possible restartBeam is in G1 with 3e6 pps. PCP will optimize
for about 1-1,5h before we take the beam.
  
Fixede768s Tue Jul 30 15:47:46 2019 NicolasBEAMGeneral Beam stopped since 11h30vacuum problem in CSS1   
Fixede768s Wed Jul 31 03:22:42 2019 Freddy, ChloéBEAMGeneral Beam profile (run160) @2h24   20190731_022419.jpg 
Fixede768s Wed Jul 31 23:06:04 2019 Nicolas & FairouzOTHERGeneral screenshot fsc   fsc_OneChannelPerMate.png 
FixedTEST Tue Dec 3 18:14:45 2019 Marlène & FrancoGRITHardware Pulser test of new boardThe new board that will be installed for MG2
has been tested and validated with a pulser
outside of the chamber.
  
FixedTEST Wed Dec 4 19:19:38 2019 MarlèneGRITHardware Modifications of set-upWe have installed the new MUFEE board in the
reaction chamber for MG2. This board is a
new version with ATHED.
  
PendingTEST Tue Jan 21 17:55:12 2020 MarlèneMUST2Hardware Ovv error on the -5V of CAEN boardsThe Ovv error shows on the -5V (first one)
of the 3 board (5,3.3,10V for MUST2§squares)
It means that the voltage is over the asked
 BT_referenve_5V_cables_inv_a_comp_referenve_5V_partMUST2BT_referenve_5V_partMUST2_cables_inv_a_comp_referenve_5VBT_referenve_5V_partMUST2BT_referenve_5V 
FixedTEST Wed Jan 22 15:53:25 2020 MarlèneGRITHardware Changes for MUGAST2020Changes were made for MUGAST 2020 : 
1- the board for MG10 before (2nd square)
is now for MG6 new trap
  
Fixed  Wed Jan 22 18:39:54 2020 Marlène & FrancoGRITHardware Tests of the new boxThe new box has been tested together with
the new CAEN SY4527 power supply. We connected
a laptop with Linux to the power supply by
 box_pin_map.pdf 
FixedTEST Mon Feb 10 18:42:23 2020 Franco&MarlèneGRITHardware New MUGAST detectors MG2 MG6MG2 and MG6 have been mounted in the chamber.

MG2 reference number is 3227_10 thickness=468um
  
FixedTEST Wed Feb 12 16:24:52 2020 Marlène, Freddy & FrancoMUST2Hardware Modifications on the electronic schemeWe cleaned the electronic scheme.
Now the HF CLEAN VAMOS is taken directly
from VAMOS and not re-cleaned by us.
  
Fixed  Fri Feb 14 10:26:46 2020 Franco&MarlèneGRITHardware HT BT screenshots before e775sDetectors are cooled down to 0 deg.  BT_CAEN2_MGnew.pngBT_CAEN1_part1_MM.pngBT_CAEN1_part2_MG.pngHV_part1_MM_MG.pngHV_part2_MG.png 