Fixed | e768s |
Fri Jul 26 19:00:15 2019 |
mugast | ONLINE | General | | Run number 152_2 | |
19x |
Fixed | e768s |
Fri Jul 26 19:36:03 2019 |
Kseniia | AGATA | General | | 19Ne gammas, current full stat | 19Ne, VAMOS-identified
All runs from before + runs 151, 152part
|
|
Fixed | e768s |
Sat Jul 27 11:02:13 2019 |
mugast | ONLINE | General | | figures run 152 | |
18x |
Fixed | e768s |
Sat Jul 27 21:12:47 2019 |
teodora & beyhan | OTHER | Hardware | | cout rate with no beam & water level check | Around 9 pm, we observed an average count
rate of 30kHz on the "or agata" scaler rates
panel of GECO. The other count rates were |
6x |
Fixed | e768s |
Sat Jul 27 22:22:21 2019 |
teodora & beyhan | VAMOS | Hardware | | FP_DC_Wi1 tripped -->Fixed | FP_DC_Wi1 tripped. We set back power supply
on the wire
=> fixed |
|
Fixed | e768s |
Sun Jul 28 08:20:38 2019 |
Sylvain & Franco | RUN | General | | Update on possible restart | The problem that caused the interruption was
due to a failure in the cooling system.
The last update we've had is that we might |
|
Fixed | e768s |
Sun Jul 28 16:23:48 2019 |
Nicolas | RUN | General | | Update on possible restart | Same situation as before lunch, the beam is
still in C0 and not yet in CSS1. We may have
beam in late evening.... |
|
Ongoing | e768s |
Sun Jul 28 19:58:57 2019 |
Nicolas | RUN | General | | Update on possible restart | Beam is now at the exit of CSS2 though We
may have beam around midnight....[/quote] |
|
Fixed | e768s |
Sun Jul 28 21:59:43 2019 |
Nicolas | RUN | General | | Update on possible restart | Beam is in G1 with 3e6 pps. PCP will optimize
for about 1-1,5h before we take the beam. |
|
Fixed | e768s |
Tue Jul 30 15:47:46 2019 |
Nicolas | BEAM | General | | Beam stopped since 11h30 | vacuum problem in CSS1 |
|
Fixed | e768s |
Wed Jul 31 03:22:42 2019 |
Freddy, Chloé | BEAM | General | | Beam profile (run160) @2h24 | |
|
Fixed | e768s |
Wed Jul 31 23:06:04 2019 |
Nicolas & Fairouz | OTHER | General | | screenshot fsc | |
|
Fixed | TEST |
Tue Dec 3 18:14:45 2019 |
Marlène & Franco | GRIT | Hardware | | Pulser test of new board | The new board that will be installed for MG2
has been tested and validated with a pulser
outside of the chamber. |
|
Fixed | TEST |
Wed Dec 4 19:19:38 2019 |
Marlène | GRIT | Hardware | | Modifications of set-up | We have installed the new MUFEE board in the
reaction chamber for MG2. This board is a
new version with ATHED.
|
|
Pending | TEST |
Tue Jan 21 17:55:12 2020 |
Marlène | MUST2 | Hardware | | Ovv error on the -5V of CAEN boards | The Ovv error shows on the -5V (first one)
of the 3 board (5,3.3,10V for MUST2§squares)
It means that the voltage is over the asked |
   |
Fixed | TEST |
Wed Jan 22 15:53:25 2020 |
Marlène | GRIT | Hardware | | Changes for MUGAST2020 | Changes were made for MUGAST 2020 :
1- the board for MG10 before (2nd square)
is now for MG6 new trap
|
|
Fixed | |
Wed Jan 22 18:39:54 2020 |
Marlène & Franco | GRIT | Hardware | | Tests of the new box | The new box has been tested together with
the new CAEN SY4527 power supply. We connected
a laptop with Linux to the power supply by |
|
Fixed | TEST |
Mon Feb 10 18:42:23 2020 |
Franco&Marlène | GRIT | Hardware | | New MUGAST detectors MG2 MG6 | MG2 and MG6 have been mounted in the chamber.
MG2 reference number is 3227_10 thickness=468um
|
|
Fixed | TEST |
Wed Feb 12 16:24:52 2020 |
Marlène, Freddy & Franco | MUST2 | Hardware | | Modifications on the electronic scheme | We cleaned the electronic scheme.
Now the HF CLEAN VAMOS is taken directly
from VAMOS and not re-cleaned by us.
|
|
Fixed | |
Fri Feb 14 10:26:46 2020 |
Franco&Marlène | GRIT | Hardware | | HT BT screenshots before e775s | Detectors are cooled down to 0 deg. |
    |