Status ExpNbr Date Author Type Category Target-Sourcedown Subject
Fixede768s Fri Jul 26 19:00:15 2019 mugastONLINEGeneral Run number 152_2
Attachment 1: DC_X_run152_2.png
DC_X_run152_2.png
Attachment 2: DC_Y_run152_2.png
DC_Y_run152_2.png
Attachment 3: DC_E_run152_2.png
DC_E_run152_2.png
Attachment 4: MW_run152_2.png
MW_run152_2.png
Attachment 5: IC_run152_2.png
IC_run152_2.png
Attachment 6: TACS_run152_2.png
TACS_run152_2.png
Attachment 7: REC_run152_2.png
REC_run152_2.png
Attachment 8: IC_IC_run152_2.png
IC_IC_run152_2.png
Attachment 9: Tab_8_run152_2.png
Tab_8_run152_2.png
Attachment 10: MM_INPACT_MATRIX_run152_2.png
MM_INPACT_MATRIX_run152_2.png
Attachment 11: MG_IMPACT_MATRIX_run152_2.png
MG_IMPACT_MATRIX_run152_2.png
Attachment 12: MM_ToF_run152_2.png
MM_ToF_run152_2.png
Attachment 13: MM_DeE_run152_2.png
MM_DeE_run152_2.png
Attachment 14: MG_ToF_run152_2.png
MG_ToF_run152_2.png
Attachment 15: TAC_run152_2.png
TAC_run152_2.png
Attachment 16: Tab_8bis_run152_2.png
Tab_8bis_run152_2.png
Attachment 17: Tab_9_run152_2.png
Tab_9_run152_2.png
Attachment 18: Tab_10_run152_2.png
Tab_10_run152_2.png
Attachment 19: GECCO_152_2.png
GECCO_152_2.png
Fixede768s Fri Jul 26 19:36:03 2019 KseniiaAGATAGeneral 19Ne gammas, current full stat
19Ne, VAMOS-identified
All runs from before + runs 151, 152part
Attachment 1: 19Ne_112to152part.png
19Ne_112to152part.png
Fixede768s Sat Jul 27 11:02:13 2019 mugastONLINEGeneral figures run 152
Attachment 1: Tab_8bis_run152_6.png
Tab_8bis_run152_6.png
Attachment 2: IC_IC_run152_6.png
IC_IC_run152_6.png
Attachment 3: REC_run152_6.png
REC_run152_6.png
Attachment 4: TACS_run152_6.png
TACS_run152_6.png
Attachment 5: IC_run152_6.png
IC_run152_6.png
Attachment 6: MW_run152_6.png
MW_run152_6.png
Attachment 7: DC_E_run152_6.png
DC_E_run152_6.png
Attachment 8: DC_Y_run152_6.png
DC_Y_run152_6.png
Attachment 9: DC_X_run152_6.png
DC_X_run152_6.png
Attachment 10: Tab_10_run152_6.png
Tab_10_run152_6.png
Attachment 11: Tab_9_run152_6.png
Tab_9_run152_6.png
Attachment 12: Tab_8_run152_6.png
Tab_8_run152_6.png
Attachment 13: TAC_run152_6.png
TAC_run152_6.png
Attachment 14: MG_ToF_run152_6.png
MG_ToF_run152_6.png
Attachment 15: MM_DeE_run152_6.png
MM_DeE_run152_6.png
Attachment 16: MM_ToF_run152_6.png
MM_ToF_run152_6.png
Attachment 17: MM_INPACT_MATRIX_run152_6.png
MM_INPACT_MATRIX_run152_6.png
Attachment 18: MG_IMPACT_MATRIX_run152_6.png
MG_IMPACT_MATRIX_run152_6.png
Fixede768s Sat Jul 27 21:12:47 2019 teodora & beyhanOTHERHardware cout rate with no beam & water level check
Around 9 pm, we observed an average count rate of 30kHz on the "or agata" scaler rates panel of GECO. The other count rates were ok.
In the agata acquisition monitoring the rate was given about 8k. one of the detector was showing a rate in red.

We decided to stop : (1) to check the rates with no beam, (2) to check the water level in collection boxes and (3) the beam intensity.

Conclusions :

- The agata rate with no beam is about 4.5kHz. The rest seems ok.

- The level of water in the collection boxes did not change since 3 pm. So it should be ok for the night (see pictures)

- The beam profile and intensity are similar to what we got before

- The rate after we got the beam looks normal now.

So everything is going well Smile

PS : there is also a piscture about the water collection tank to empty the boxes if needed

Attachment 1: scalers-run154-nobeam.png
scalers-run154-nobeam.png
Attachment 2: IMG_3511.jpg
IMG_3511.jpg
Attachment 3: IMG_3512.jpg
IMG_3512.jpg
Attachment 4: IMG_3513.jpg
IMG_3513.jpg
Attachment 5: IMG_3514.jpg
IMG_3514.jpg
Attachment 6: scalers-run154-with_beam.png
scalers-run154-with_beam.png
Fixede768s Sat Jul 27 22:22:21 2019 teodora & beyhanVAMOSHardware FP_DC_Wi1 tripped -->Fixed
FP_DC_Wi1 tripped. We set back power supply on the wire
=> fixed
Fixede768s Sun Jul 28 08:20:38 2019 Sylvain & FrancoRUNGeneral Update on possible restart
The problem that caused the interruption was due to a failure in the cooling system.
The last update we've had is that we might have the beam back not before late afternoon.
We will keep you updated.
Fixede768s Sun Jul 28 16:23:48 2019 NicolasRUNGeneral Update on possible restart
Same situation as before lunch, the beam is still in C0 and not yet in CSS1. We may have beam in late evening....
Ongoinge768s Sun Jul 28 19:58:57 2019 NicolasRUNGeneral Update on possible restart
Beam is now at the exit of CSS2 though We may have beam around midnight....
Fixede768s Sun Jul 28 21:59:43 2019 NicolasRUNGeneral Update on possible restart
Beam is in G1 with 3e6 pps. PCP will optimize for about 1-1,5h before we take the beam.
Fixede768s Tue Jul 30 15:47:46 2019 NicolasBEAMGeneral Beam stopped since 11h30
vacuum problem in CSS1
Fixede768s Wed Jul 31 03:22:42 2019 Freddy, ChloéBEAMGeneral Beam profile (run160) @2h24
Attachment 1: 20190731_022419.jpg
20190731_022419.jpg
Fixede768s Wed Jul 31 23:06:04 2019 Nicolas & FairouzOTHERGeneral screenshot fsc
Attachment 1: fsc_OneChannelPerMate.png
fsc_OneChannelPerMate.png
FixedTEST Tue Dec 3 18:14:45 2019 Marlène & FrancoGRITHardware Pulser test of new board
The new board that will be installed for MG2 has been tested and validated with a pulser outside of the chamber.
FixedTEST Wed Dec 4 19:19:38 2019 MarlèneGRITHardware Modifications of set-up
We have installed the new MUFEE board in the reaction chamber for MG2. This board is a new version with ATHED.

We have moved the MG9 board to become the board to read the future MUST2 detector at 90 deg. This board is now perpendicular to the other ones. We have tested the kaptons connection to the detector and the placement of the detector.
The design will be refined on monday with Patrice.

The board that was reading MG10 is now used for MG6.

Every board has been tested again with pulser under vacuum. Everything seems OK.
PendingTEST Tue Jan 21 17:55:12 2020 MarlèneMUST2Hardware Ovv error on the -5V of CAEN boards
The Ovv error shows on the -5V (first one) of the 3 board (5,3.3,10V for MUST2§squares)
It means that the voltage is over the asked value.
If we ask 5V, we get 5.5V in reality

We changed for 4.5V and we get 5V. The current is different from the one on the MUGAST BT box but we don't know how many detectors are connected.
We exchanged cables and found the same current in the other board, so we guess that it is still working properly.
A check of stability should be done.
Attachment 1: BT_referenve_5V_cables_inv_a_comp_referenve_5V_partMUST2
Attachment 2: BT_referenve_5V_partMUST2_cables_inv_a_comp_referenve_5V
Attachment 3: BT_referenve_5V_partMUST2
Attachment 4: BT_referenve_5V
FixedTEST Wed Jan 22 15:53:25 2020 MarlèneGRITHardware Changes for MUGAST2020
Changes were made for MUGAST 2020 :
1- the board for MG10 before (2nd square) is now for MG6 new trap
2- the board for MG9 is put vertical and used for the MUST2 at 90 deg
3- a new board has been installed for MG2

Now there will be 13 detectors in the chamber: 7 trap + 1 square + 4 MUST2 forward.
Fixed  Wed Jan 22 18:39:54 2020 Marlène & FrancoGRITHardware Tests of the new box
The new box has been tested together with the new CAEN SY4527 power supply. We connected a laptop with Linux to the power supply by means of an ethernet cable and communicated with it by opening a browser (http://192.168.0.1, then username: admin and pwd: admin). To control the channels we open a terminal, go to the folder where we saved the file ChannelsController.jar and run the command: java -jar ChannelsController.jar 192.168.0.1 admin admin
The output biases were checked with a test cable connected to the flange output and are reported in the attached file. For comparison we did the same thing on 3 Mugast detectors (MG1, MG3 and MG4) We saw that the polarity of all the 3.3V in the new box was inverted with respect to the Mugast box so we opened the box and, like sappers, we followed the colored cables until we found the ones giving the 3.3V and inverted them. It worked! So now the biases should be correct. A reminder for possible future modifications: the coupled colours for the wires are blue-grey, white-brown, yellow-green.
Some low voltages seem to be unused because they are present in some BT outputs but not in others, but anyway the detectors which are supplied by these cables have always been working properly, so the small differences between different BT outputs might be irrelevant.
It is then important to notice that BT2 and BT3 have a -2.5V instead of a +2.5V so it's recommended not to use them unless the relative cables are first switched inside the box.
Attachment 1: box_pin_map.pdf
box_pin_map.pdf box_pin_map.pdf box_pin_map.pdf box_pin_map.pdf box_pin_map.pdf box_pin_map.pdf box_pin_map.pdf box_pin_map.pdf
FixedTEST Mon Feb 10 18:42:23 2020 Franco&MarlèneGRITHardware New MUGAST detectors MG2 MG6
MG2 and MG6 have been mounted in the chamber.

MG2 reference number is 3227_10 thickness=468um
MG6 3227_7 thickness=473um

Nominal depletion =35V
FixedTEST Wed Feb 12 16:24:52 2020 Marlène, Freddy & FrancoMUST2Hardware Modifications on the electronic scheme
We cleaned the electronic scheme.
Now the HF CLEAN VAMOS is taken directly from VAMOS and not re-cleaned by us.
TACs are all ok. Inspection lines have been checked and labeled.
GMT and Scalers are like below.

GMT:
1 - MUVI 1 (MG1, MG3, MG4, MG5)
2 - MUVI 2 (MG7, MG2, MG6, MG11)
3 - MUVI 3 (MM1, MM2, MM3, MM4)
4 - MUVI 4 (MG9 90-deg MUST2)
5 - COINCIDENCE VAMOS-AGATA
6 - VAMOS DIV
7 - MUST2 DIV
8 - broken
9 - SQUARE DIV
10 - AGATA DIV
11 - VAMOS
12 - empty
13 - empty
14 - empty
15 - broken
16 - empty

SCALERS:
1 - FAG
2 - OR MUGAST
3 - AGATA
4 - VAMOS
5 - empty
6 - DEAD TIME MUGAST
7 - 100 Hz PULSER
8 - DEAD TIME
9 - MUVI 1 (MG1, MG3, MG4, MG5)
10 - MUVI 2 (MG7, MG2, MG6, MG11)
11 - MUVI 3 (MM1, MM2, MM3, MM4)
12 - MUVI 4 (MG9 90-deg MUST2)
13 - empty
14 - empty
15 - CATS2
16 - FINGER
Fixed  Fri Feb 14 10:26:46 2020 Franco&MarlèneGRITHardware HT BT screenshots before e775s
Detectors are cooled down to 0 deg.
Attachment 1: BT_CAEN2_MGnew.png
BT_CAEN2_MGnew.png
Attachment 2: BT_CAEN1_part1_MM.png
BT_CAEN1_part1_MM.png
Attachment 3: BT_CAEN1_part2_MG.png
BT_CAEN1_part2_MG.png
Attachment 4: HV_part1_MM_MG.png
HV_part1_MM_MG.png
Attachment 5: HV_part2_MG.png
HV_part2_MG.png
Goto page Previous  1, 2, 3 ... 128, 129, 130, 131, 132   Next  

ELOG Home Page