MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 129 of 132  Not logged in MUGAST
Fixed, e768s, Fri Jul 26 19:00:15 2019, mugast, ONLINE, General, , Run number 152_2 19x
 
Fixed, e768s, Fri Jul 26 19:36:03 2019, Kseniia, AGATA, General, , 19Ne gammas, current full stat 19Ne_112to152part.png
19Ne, VAMOS-identified
All runs from before + runs 151, 152part 
Fixed, e768s, Sat Jul 27 11:02:13 2019, mugast, ONLINE, General, , figures run 152 18x
 
Fixed, e768s, Sat Jul 27 21:12:47 2019, teodora & beyhan, OTHER, Hardware, , cout rate with no beam & water level check 6x
Around 9 pm, we observed an average count rate of 30kHz on the "or agata" scaler rates panel of GECO. The other count rates were ok.
In the agata acquisition monitoring the rate was given about 8k. one of the detector was showing a rate in red.
Fixed, e768s, Sat Jul 27 22:22:21 2019, teodora & beyhan, VAMOS, Hardware, , FP_DC_Wi1 tripped -->Fixed 
FP_DC_Wi1 tripped. We set back power supply on the wire
=> fixed
Fixed, e768s, Sun Jul 28 08:20:38 2019, Sylvain & Franco, RUN, General, , Update on possible restart 
The problem that caused the interruption was due to a failure in the cooling system.
The last update we've had is that we might have the beam back not before late afternoon.
We will keep you updated.
    Fixed, e768s, Sun Jul 28 16:23:48 2019, Nicolas, RUN, General, , Update on possible restart 
Same situation as before lunch, the beam is still in C0 and not yet in CSS1. We may have beam in late evening....
    Ongoing, e768s, Sun Jul 28 19:58:57 2019, Nicolas, RUN, General, , Update on possible restart 
Beam is now at the exit of CSS2 though We may have beam around midnight....[/quote]
    Fixed, e768s, Sun Jul 28 21:59:43 2019, Nicolas, RUN, General, , Update on possible restart 
Beam is in G1 with 3e6 pps. PCP will optimize for about 1-1,5h before we take the beam.
Fixed, e768s, Tue Jul 30 15:47:46 2019, Nicolas, BEAM, General, , Beam stopped since 11h30 
vacuum problem in CSS1
Fixed, e768s, Wed Jul 31 03:22:42 2019, Freddy, Chloé, BEAM, General, , Beam profile (run160) @2h24 20190731_022419.jpg
 
Fixed, e768s, Wed Jul 31 23:06:04 2019, Nicolas & Fairouz, OTHER, General, , screenshot fsc fsc_OneChannelPerMate.png
 
Fixed, TEST, Tue Dec 3 18:14:45 2019, Marlène & Franco, GRIT, Hardware, , Pulser test of new board 
The new board that will be installed for MG2 has been tested and validated with a pulser outside of the chamber.
Fixed, TEST, Wed Dec 4 19:19:38 2019, Marlène, GRIT, Hardware, , Modifications of set-up 
We have installed the new MUFEE board in the reaction chamber for MG2. This board is a new version with ATHED.

We have moved the MG9 board to become the board to read the future MUST2 detector at 90 deg. This board is now perpendicular to the other ones. We have
Pending, TEST, Tue Jan 21 17:55:12 2020, Marlène, MUST2, Hardware, , Ovv error on the -5V of CAEN boards BT_referenve_5V_cables_inv_a_comp_referenve_5V_partMUST2BT_referenve_5V_partMUST2_cables_inv_a_comp_referenve_5VBT_referenve_5V_partMUST2BT_referenve_5V
The Ovv error shows on the -5V (first one) of the 3 board (5,3.3,10V for MUST2§squares)
It means that the voltage is over the asked value.
If we ask 5V, we get 5.5V in reality
Fixed, TEST, Wed Jan 22 15:53:25 2020, Marlène, GRIT, Hardware, , Changes for MUGAST2020 
Changes were made for MUGAST 2020 : 
1- the board for MG10 before (2nd square) is now for MG6 new trap
2- the board for MG9 is put vertical and used for the MUST2 at 90 deg
Fixed, , Wed Jan 22 18:39:54 2020, Marlène & Franco, GRIT, Hardware, , Tests of the new box box_pin_map.pdf
The new box has been tested together with the new CAEN SY4527 power supply. We connected a laptop with Linux to the power supply by means of an ethernet
cable and communicated with it by opening a browser (http://192.168.0.1, then username: admin and pwd: admin). To control the channels we open a terminal,
go to the folder where we saved the file ChannelsController.jar and run the command: java -jar ChannelsController.jar 192.168.0.1 admin admin
Fixed, TEST, Mon Feb 10 18:42:23 2020, Franco&Marlène, GRIT, Hardware, , New MUGAST detectors MG2 MG6 
MG2 and MG6 have been mounted in the chamber.

MG2 reference number is 3227_10 thickness=468um
Fixed, TEST, Wed Feb 12 16:24:52 2020, Marlène, Freddy & Franco, MUST2, Hardware, , Modifications on the electronic scheme 
We cleaned the electronic scheme.
Now the HF CLEAN VAMOS is taken directly from VAMOS and not re-cleaned by us.
TACs are all ok. Inspection lines have been checked and labeled.
Fixed, , Fri Feb 14 10:26:46 2020, Franco&Marlène, GRIT, Hardware, , HT BT screenshots before e775s BT_CAEN2_MGnew.pngBT_CAEN1_part1_MM.pngBT_CAEN1_part2_MG.pngHV_part1_MM_MG.pngHV_part2_MG.png
Detectors are cooled down to 0 deg.

ELOG Home Page