Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e786s |
Fri May 31 09:53:14 2019 |
Marlène | GRIT | General | | Alpha source --> status of detectors | MG3T has been fixed by changing the X kapton.
I have removed aluminium foil on square detectors, |
|
Fixed | e786s |
Mon Jun 3 18:00:10 2019 |
Marlène | GRIT | General | | MUGAST detectors status --> MG4T | The problem of MG4T ha sbeen solved by changing
the feedthrough.
The pulser on Y was not working and we were |
|
Fixed | e786s |
Wed Jun 12 17:59:01 2019 |
mugast | OTHER | Software | | Online Energy Calibration | Updated Online Energy calibration for MUGAST,
based on run_0231 data |
 |
Fixed | e786s |
Wed Jun 12 18:11:04 2019 |
mugast | OTHER | Software | | Online Energy Calibration | |
|
Fixed | e786s |
Sun Jun 23 14:37:43 2019 |
Freddy, Franco and Louis | OTHER | Hardware | | Temperature error on +2.5v/t3 | There is a temperature error on the +2.5 V
for MUST2 Telescope. It created error message
due to hv_monitor but it does not shutdown |
|
Fixed | |
Mon Jun 24 14:14:17 2019 |
Valerian, Adrien - Dudouet | OFFLINE | General | | p,p' analysis of run49 | |
  |
Fixed | e786s |
Tue Jun 25 15:33:40 2019 |
A Lemasson | VAMOS | General | | VAMOS Analysis - Brho | VAMOS Analysis :
VAMOS PID with attached SetAlias.C
|
8x |
Fixed | e786s |
Thu Jun 27 00:26:37 2019 |
mugast | OFFLINE | General | | statistics until now | Maybe some stat still to recover from better
gate and mass and Z reconstruction.
|
|
Fixed | |
Thu Jul 11 11:40:18 2019 |
Marlène & Franco | OTHER | Hardware | | Some changes in the electronic scheme | - We checked the TACs with a time calibrator,
all of them are working. Maybe to check the
ADCs if some timings are not there during |
|
Fixed | e768s |
Fri Jul 12 17:51:06 2019 |
mugast (Sylvain, Chloe, François, Marlène, Nicolas) | OTHER | General | | Monitoring of beam profile with BAF2 | In order to provide a efficient way for PCP
to monitor beam profile a new TAC measurement
has set up.
|
|
Fixed | e768s |
Mon Jul 15 14:29:47 2019 |
Marlène | MUST2 | General | | Masks for MUST2 & Kapton changed for MG5 | Masks are now correctly mounted
All 4 kaptons from MG5 have been changed |
 |
Fixed | e768s |
Tue Jul 16 15:13:01 2019 |
Jenn, DIego | VAMOS | General | | Brho | |
|
Fixed | e768s |
Tue Jul 16 15:32:05 2019 |
Jenn | OTHER | General | | Shift table google schedule link | Please, see below the spreadsheet with the
shift schedule.
|
|
Fixed | e768s |
Tue Jul 16 19:21:19 2019 |
mugast | OTHER | General | | Qpole values | Brho = 0.640 Tm
RMN = 3247,742 Gaus (215.630 A)
|
|
Fixed | e768s |
Tue Jul 16 22:25:51 2019 |
mugast | OTHER | General | | Oxygen 15 decay scheme | beta+ decay to the ground state of 15N
gammas @ 511 keV |
|
Fixed | e768s |
Wed Jul 17 01:51:10 2019 |
mugast | BEAM | General | | Faisceau perdu | Un Q-pole dans L3 est tombé. L'opérateur a
du mal à le redémarrer. Bertrand et un technicien
ont essayé de réparer mais sans succès.
|
|
Fixed | e768s |
Wed Jul 17 09:07:19 2019 |
mugast | BEAM | General | | beam settings | values as it is now |
|
Fixed | |
Wed Jul 17 10:25:26 2019 |
Kseniia | MUST2 | Hardware | | The burnt crate | Here’s what the 48V power supply of the damaged
crate looks like inside
[IMG]elog:5072/1[/IMG] |
|
Fixed | e768s |
Wed Jul 17 10:55:23 2019 |
Francois | OFFLINE | General | | previous measurement of 15N(7Li,t) | |
|
Fixed | e768s |
Wed Jul 17 11:36:53 2019 |
Jenn | VAMOS | General | | M/Q values | Values of M/Q for possible recoils on the
focal plane
|
|