MUST2
SAMURAI_2018
S3-LEB-LPC
SUPERNEMO
MUGAST
EXPAND
SCALP
GALATRON
HiCARI
VELO
MUGAST, Page 121 of 132
Not logged in
Find
|
Login
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
2636 Entries
Goto page
Previous
1
,
2
,
3
...
120
, 121,
122
...
130
,
131
,
132
Next
Status
ExpNbr
Date
Author
Type
Category
Target-Source
Subject
Text
Fixed
e768s
Sun Jul 28 14:57:26 2019
Franco & Sylvain
BEAM
General
N/A
Beam problems and DC trip
The HV and the vacuum in VAMOS are now recovered
and back to the normal values. The water
tray is 20% filled and under control. Mugast
Fixed
TEST
Thu Oct 17 12:01:09 2019
Franco & Marlène
GRIT
Hardware
3-alpha
Test of configuration with 4 MUVI and 3 GAMERS
The electronics set-up for MUGAST2020 has
been tested with 4 MUVI on 4 VXI crates,
1GMT for MASTER and 3 GAMERS for slaves.
Fixed
e793s
Tue Mar 10 18:46:13 2020
Franco & Marlène
GRIT
Hardware
Changes in MUGAST
- MG6 (FZ) is disconnected.
- MG7 (500um) is dismounted and MG8 (375um)
is replacing it.
Fixed
e786s
Tue Jun 25 22:20:36 2019
Franco
RUN
General
Cryo-3He
Run58
[quote="OttoRun"][quote="OttoRun"]*************************
[SIZE=3][B]Run : 58[/B][/SIZE]
*************************
Fixed
e786s
Tue Jun 25 23:55:34 2019
Franco
RUN
General
Cryo-3He
Run58
[quote="Franco"][quote="OttoRun"][quote="OttoRun"]*************************
[SIZE=3][B]Run : 58[/B][/SIZE]
*************************
Fixed
e768s
Mon Jul 15 14:38:27 2019
Franco
RUN
General
3-alpha
Run302
Attached the calibrated spectra for MUST2
and Mugast for run 302 (no pedestals).
Fixed
e768s
Mon Jul 15 18:28:19 2019
Franco
RUN
General
3-alpha
Run301
Attached the calibrated spectra for MUST2
and Mugast for run 301.
Fixed
e768s
Tue Jul 16 09:44:53 2019
Franco
RUN
General
3-alpha
Run306
Attached the calibrated spectra for Mugast
and MUST2 for run 0306 and the raw spectra
of Mugast.
Fixed
e768s
Tue Jul 16 09:51:56 2019
Franco
RUN
General
3-alpha
Run301
Attached the dat file with the position of
the pedestals for each strip of MG3_X
that can be used to correct the pedestal
Fixed
e768s
Thu Jul 18 22:11:57 2019
Franco
OFFLINE
General
Identification in Mugast
Attached the spectra obtained in Mugast for
run_0072_0_agata.root.
The colored ones are obtained simply asking
Fixed
e768s
Fri Jul 19 23:10:18 2019
Franco
RUN
General
3-alpha
Run302
Added energy calibration for square detector
(MG 10).
Fixed
e768s
Fri Jul 19 23:12:36 2019
Franco
RUN
General
3-alpha
Run302
Added energy calibration for square detector
(MG 10).
Fixed
e768s
Sat Jul 20 05:58:18 2019
Franco
OFFLINE
General
Time calibration for MG10_X
Attached a tentative time calibration for
the square MG10_X from run 89 (to be checked!).
Even applying the calibration the spectrum
Fixed
e768s
Mon Jul 22 21:30:36 2019
Franco
OFFLINE
General
LiF
Identification in Mugast for Ne in VAMOS
Difference in identification in Mugast when
gating on 19Ne and when gating on the two
nearby isotopes (runs from 112 to 121).
Fixed
TEST
Tue Feb 18 17:53:36 2020
Franco
GRIT
General
3-alpha
Alpha calibration for exp e775s (run 0501)
In attachment raw and calibrated spectra for
run 0501 (alpha source) for MUST2 and Mugast.
Fixed
Thu Feb 20 17:58:51 2020
Franco
GRIT
General
Time calibration for e775s exp
Attached the raw and calibrated time spectra
for the pulser runs.
Fixed
TEST
Tue Mar 10 11:05:40 2020
Franco
GRIT
Hardware
3-alpha
Trip in the cooling system after e775s experiment
In the weekend after the experiment e775s
(7-8 March 2020) a problem with the cooling
system of Mugast occurred. In particular,
Fixed
TEST
Tue Feb 2 16:41:17 2021
Franco
VACUUM
Hardware
N/A
MUGAST undervacuum and powered up
I put back the supply of MM1 to the channel
1 of the MUST2 box (as in the normal configuration)
and polarized the detectors to make a rapid
Fixed
TEST
Wed Feb 3 16:42:41 2021
Franco
GRIT
General
3-alpha
Status of the set-up (February 3rd 2021)
We re-mounted the annular, put the source
and cooled down to 0 deg. Voltages and spectra
are attached.
Fixed
TEST
Thu Feb 4 18:16:47 2021
Franco
GRIT
Hardware
3-alpha
Problems with the annular persist
We opened the chamber to verify the connections
of the kaptons but they were all well connected.
We checked with the tester the conductivity
8x
Goto page
Previous
1
,
2
,
3
...
120
, 121,
122
...
130
,
131
,
132
Next
ELOG Home Page