OttoRun wrote: |
OttoRun wrote: | *************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run. |
In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.
After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30). |
Attachment 1: BRho_run58.png
|
|
Fixed | e786s |
Tue Jun 25 23:55:34 2019 |
Franco | RUN | General | Cryo-3He | Run58 |
Franco wrote: |
OttoRun wrote: |
OttoRun wrote: | *************************
Run : 58
*************************
Start at 2019-06-25 16:56:44.425517
target 700mb
Brho0=0.95 Tm
DC pressure 6 mbar
IC pressure 120 mbar
CATS2 inserted
AGATA position +51-25 mm
TRIGGER :
- VAMOS %1000
- CMG
- MM
- CATS2 %1000
Beam is back
scaler_run_58.png taken at the beginning of the run. |
scaler_run_58.png is taken after 7h. |
In the CATS position spectra the central part is missing (maybe for the high intensity of the beam?).
We can anyway recover the time information.
After the decrease of the high voltage of VAMOS drift chamber to avoid saturation of the signals
the BRho resolution has worsened of about 25% (see attachment). We will now increase it again (h. 22.30). |
|
Attachment 1: scaler_run_58_2.png
|
|
Fixed | e768s |
Mon Jul 15 14:38:27 2019 |
Franco | RUN | General | 3-alpha | Run302 |
Attached the calibrated spectra for MUST2 and Mugast for run 302 (no pedestals).
OttoRun wrote: | *************************
Run : 302
*************************
Start at 2019-07-11 16:54:22.512184
3 alpha calibration run
+ without MM2 masks
+ suppressed pedestals
Square detectors:
+ MG10: all X strips masked; mate 14 & 16 masked
+ MG9: all X & Y strips masked
Stop at 2019-07-12 05:44:35.805449
Stop comment: |
|
Attachment 1: run0302_must2_cal.png
|
|
Attachment 2: run0302_mugast_cal.png
|
|
Fixed | e768s |
Mon Jul 15 18:28:19 2019 |
Franco | RUN | General | 3-alpha | Run301 |
Attached the calibrated spectra for MUST2 and Mugast for run 301.
OttoRun wrote: | *************************
Run : 301
*************************
Start at 2019-07-11 15:07:27.670320
3 alpha calibration run
+ without MM2 masks
+ non suppressed pedestals
Square detectors:
+ MG10: all X strips masked; mate 14 & 16 masked
+ MG9: all X & Y strips masked
Stop at 2019-07-11 16:52:55.206383
Stop comment: stopping run to put pedestal suppression |
|
Attachment 1: run0301_must2_cal.png
|
|
Attachment 2: run0301_mugast_cal.png
|
|
Fixed | e768s |
Tue Jul 16 09:44:53 2019 |
Franco | RUN | General | 3-alpha | Run306 |
Attached the calibrated spectra for Mugast and MUST2 for run 0306 and the raw spectra of Mugast.
OttoRun wrote: | *************************
Run : 306
*************************
Start at 2019-07-12 17:17:19.657074
3 alpha calibration run
+ MM2 masks
+ suppressed pedestals (new pedestal for all trap detectors)
Square detectors:
+ MG10: not biased
+ MG9 removed
Stop at 2019-07-14 21:18:42.648096
Stop comment: stopping for heating cooling system after unbiasing MUGAST
Stop at 2019-07-15 15:36:28.594934
Stop comment: type your message here
Stop at 2019-07-15 16:25:22.582232
Stop comment: type your message here
Stop at 2019-07-15 18:02:50.677903
Stop comment: changing ADC channel for T_AGATA_HF |
|
Attachment 1: run0306_mugast_cal.png
|
|
Attachment 2: run0306_must2_cal.png
|
|
Attachment 3: run0306_mugast_raw.png
|
|
Fixed | e768s |
Tue Jul 16 09:51:56 2019 |
Franco | RUN | General | 3-alpha | Run301 |
Attached the dat file with the position of the pedestals for each strip of MG3_X
that can be used to correct the pedestal problem of MG3_X in later runs (from run O306).
Franco wrote: | Attached the calibrated spectra for MUST2 and Mugast for run 301.
OttoRun wrote: | *************************
Run : 301
*************************
Start at 2019-07-11 15:07:27.670320
3 alpha calibration run
+ without MM2 masks
+ non suppressed pedestals
Square detectors:
+ MG10: all X strips masked; mate 14 & 16 masked
+ MG9: all X & Y strips masked
Stop at 2019-07-11 16:52:55.206383
Stop comment: stopping run to put pedestal suppression |
|
|
Attachment 1: pedestals_MG3_STRX_E_RAW.dat
|
#Strip Pedestal pos.
1 8192.3
2 8192.04
3 8192.01
4 8192.3
5 8192.07
6 8192.05
7 8192.53
8 8191.71
9 8191.33
10 8190.86
11 8190.64
12 8190.34
13 8189.44
14 8188.99
15 8437.76
16 8437.76
17 8192.91
18 8192.76
19 8192.5
20 8192.05
21 8192.05
22 8192.04
23 8191.66
24 8191.9
25 8191.88
26 8191.93
27 8191.77
28 8191.15
29 8191.19
30 8191.39
31 8191.63
32 8192.03
33 8192.28
34 8192.46
35 8191.93
36 8191.42
37 8192.15
38 8192.55
39 8192.74
40 8192.58
41 8192.57
42 8193.06
43 8192.91
44 8192.55
45 8192.46
46 8192.66
47 8192.61
48 8192.83
49 8192.98
50 8192.61
51 8192.45
52 8192.87
53 8192.83
54 8192.57
55 8192.57
56 8192.46
57 8192.59
58 8192.48
59 8192.53
60 8192.54
61 8192.65
62 8192.68
63 8192.57
64 8192.7
65 8191.82
66 8190.82
67 8191.16
68 8191.34
69 8191.22
70 8191.68
71 8191.89
72 8191.74
73 8191.69
74 8192.04
75 8191.72
76 8191.75
77 8191.83
78 8192
79 8191.93
80 8191.85
81 8192.37
82 8192.54
83 8192.52
84 8192.29
85 8192.19
86 8191.81
87 8192.06
88 8192.51
89 8192.55
90 8192.27
91 8192.24
92 8192.35
93 8192.07
94 8192.51
95 8191.28
96 8190.31
97 8191.3
98 8191.94
99 8192.28
100 8192.65
101 8192.4
102 8191.86
103 8191.55
104 8191.57
105 8191.67
106 8191.76
107 8191.97
108 8191.58
109 8191.6
110 8191.96
111 8191.77
112 8191.89
113 8192.44
114 8192.58
115 8192.51
116 8192.37
117 8192.06
118 8191.6
119 8191.88
120 8191.7
121 8191.5
122 8191.73
123 8191.6
124 8191.4
125 8191.67
126 8191.94
127 8191.52
128 8191.83
|
Fixed | e768s |
Thu Jul 18 22:11:57 2019 |
Franco | OFFLINE | General | | Identification in Mugast |
Attached the spectra obtained in Mugast for run_0072_0_agata.root.
The colored ones are obtained simply asking for multiplicity 1, the black points are obtained
asking also for Z=9 (F) and for A=20 in VAMOS with the condition abs(mM_Q2*8-20)<0.5. |
Attachment 1: id_mugast_20Fblackpoints.png
|
|
Fixed | e768s |
Fri Jul 19 23:10:18 2019 |
Franco | RUN | General | 3-alpha | Run302 |
Added energy calibration for square detector (MG 10).
OttoRun wrote: | *************************
Run : 302
*************************
Start at 2019-07-11 16:54:22.512184
3 alpha calibration run
+ without MM2 masks
+ suppressed pedestals
Square detectors:
+ MG10: all X strips masked; mate 14 & 16 masked
+ MG9: all X & Y strips masked
Stop at 2019-07-12 05:44:35.805449
Stop comment: |
|
Attachment 1: run302_MG_Ecal.png
|
|
Fixed | e768s |
Fri Jul 19 23:12:36 2019 |
Franco | RUN | General | 3-alpha | Run302 |
Added energy calibration for square detector (MG 10).
Franco wrote: | Attached the calibrated spectra for MUST2 and Mugast for run 302 (no pedestals).
OttoRun wrote: | *************************
Run : 302
*************************
Start at 2019-07-11 16:54:22.512184
3 alpha calibration run
+ without MM2 masks
+ suppressed pedestals
Square detectors:
+ MG10: all X strips masked; mate 14 & 16 masked
+ MG9: all X & Y strips masked
Stop at 2019-07-12 05:44:35.805449
Stop comment: |
|
|
Attachment 1: run302_MG_Ecal.png
|
|
Fixed | e768s |
Sat Jul 20 05:58:18 2019 |
Franco | OFFLINE | General | | Time calibration for MG10_X |
Attached a tentative time calibration for the square MG10_X from run 89 (to be checked!).
Even applying the calibration the spectrum E_TOF for MG10 (run 115) displays many structures. |
Attachment 1: run_0089_MG10_timecal.png
|
|
Attachment 2: ETOF_MG10_run115.png
|
|
Fixed | e768s |
Mon Jul 22 21:30:36 2019 |
Franco | OFFLINE | General | LiF | Identification in Mugast for Ne in VAMOS |
Difference in identification in Mugast when gating on 19Ne and when gating on the two nearby isotopes (runs from 112 to 121). |
Attachment 1: Mugast_19Ne.png
|
|
Attachment 2: Mugast_18Ne_and_20Ne.png
|
|
Fixed | TEST |
Tue Feb 18 17:53:36 2020 |
Franco | GRIT | General | 3-alpha | Alpha calibration for exp e775s (run 0501) |
In attachment raw and calibrated spectra for run 0501 (alpha source) for MUST2 and Mugast.
Overall resolution of 36 keV on MUST2 and 40 keV on MUGAST detector. |
Attachment 1: E_raw_MM.png
|
|
Attachment 2: E_raw_MG.png
|
|
Attachment 3: E_cal_MM.png
|
|
Attachment 4: E_cal_MG.png
|
|
Fixed | |
Thu Feb 20 17:58:51 2020 |
Franco | GRIT | General | | Time calibration for e775s exp |
Attached the raw and calibrated time spectra for the pulser runs. |
Attachment 1: T_raw_MM.png
|
|
Attachment 2: T_raw_MG.png
|
|
Attachment 3: T_cal_MM.png
|
|
Attachment 4: T_cal_MG.png
|
|
Fixed | TEST |
Tue Mar 10 11:05:40 2020 |
Franco | GRIT | Hardware | 3-alpha | Trip in the cooling system after e775s experiment |
In the weekend after the experiment e775s (7-8 March 2020) a problem with the cooling system of Mugast occurred. In particular, in the morning of Saturday 7th around 12h the cooling system tripped and some detectors remained switched on until Monday 9th in the morning. After a check, it looks like all Mugast detectors are ok except MG6, which cannot be biased anymore.
The alpha calibration run of the weekend (run_0193) is divided into 55 runs. Runs from .0 to .11 can be safely used for the post-experiment alpha calibration, those from .12 to .54 are probably useless to this aim.
In the first attachment is the evolution of the DSSD energy (of all telescopes together because it's the calibrated energy) for run .12, that started on Saturday 7th at 11.43 and ended at 12.55. At the end of the run it is evident that something wrong is going on with the detectors. In the following runs this behaviour is confirmed and going even worse.
In the second attachment is the evolution of the DSSD energy for MG6 and for MG1 in run .13, so right after the cooling system tripped, showing that MG6 immediately "suffered" much more the heating-up.
In the last 2 attachments are the raw energies for X and Y of MG11 in run 0524 done on Monday 9th afternoon after we re-biased the detectors compared with run 0193 (from .9 to .11) before the cooling system tripped. It looks like the part of MG11 X from strip 35 to 50, that before the heating was having the 4-peaks behaviour, now behaves normally, while the Y is still the same, with 3 missing strips. |
Attachment 1: run0193_12_heat.png
|
|
Attachment 2: run0193_13_heat_MG6vsMG1.png
|
|
Attachment 3: run_0524_MG11XYraw.png
|
|
Attachment 4: run_0193_9_19_11_MG11XYraw.png
|
|
Fixed | TEST |
Tue Feb 2 16:41:17 2021 |
Franco | VACUUM | Hardware | N/A | MUGAST undervacuum and powered up |
I put back the supply of MM1 to the channel 1 of the MUST2 box (as in the normal configuration) and polarized the detectors to make a rapid re-check. I didn't see any detector tripping. MM1, switched on only for a couple of minutes, had a stable current at 1.3 uA. The stability of the detectors over time should anyway be checked better tomorrow leaving them polarized for a longer time.
Adrien wrote: | MUGAST is undervacuum thanks to Arnaud and Laurent.
I switch on all BT and HT. everything fine so far. Keeping the HV to check there is no trip on the silicon |
|
Fixed | TEST |
Wed Feb 3 16:42:41 2021 |
Franco | GRIT | General | 3-alpha | Status of the set-up (February 3rd 2021) |
We re-mounted the annular, put the source and cooled down to 0 deg. Voltages and spectra are attached.
MG11 has a very high current (15 uA) but stable. MG9 started from 2 uA and its current is slightly increasing. The MUST2 detectors don't show anymore that oscillation in current that we observed one year ago. MM3 has a higher current (2.9 uA) with respect to the others.
Only 5 sectors are working for the annular, 8 less than last year. We need to check whether it is a problem of the kapton or of the detector itself. |
Attachment 1: Voltages_03022021.png
|
|
Attachment 2: MM_raw_03022021.png
|
|
Attachment 3: MG_X_raw_03022021.png
|
|
Attachment 4: MG_Y_raw_03022021.png
|
|
Fixed | TEST |
Thu Feb 4 18:16:47 2021 |
Franco | GRIT | Hardware | 3-alpha | Problems with the annular persist |
We opened the chamber to verify the connections of the kaptons but they were all well connected. We checked with the tester the conductivity of the kapton YA5 and it was fine so we excluded any problem related to the kapton. The boards are working properly (the pulser is well seen). We have to conclude that the problem comes from the detector. We made another alpha source run and indeed the result is the same as yesterday -> 5 sectors working on Y. We also tried to rise the HV of the annular up to 95V instead of the nominal 80V: the current went to 19 uA but no new sector appeared in the spectra.
Apart from the usual spectra, attached are also the pedestals of MG11, the alpha spectrum for ch48 of MG11_Y (one of the working sectors). The HV were the same as yesterday. |
Attachment 1: MM_raw_04022021.png
|
|
Attachment 2: MG_X_raw_04022021.png
|
|
Attachment 3: MG_Y_raw_04022021.png
|
|
Attachment 4: MG_impact_04022021.png
|
|
Attachment 5: MM_impact_04022021.png
|
|
Attachment 6: pedestals_MG11.png
|
|
Attachment 7: LV_04022021.png
|
|
Attachment 8: alpha_spectrum_ch48_MG11Y.png
|
|