MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 121 of 127  Not logged in MUGAST
New entries since:Thu Jan 1 01:00:00 1970
Fixed, e793s, Fri Mar 12 13:40:59 2021, OttoRun, RUN, General, CD2, Run59 
*************************
  [SIZE=3][B]Run  : 59[/B][/SIZE]
*************************
Fixed, e793s, Fri Mar 12 15:19:35 2021, OttoRun, RUN, General, CD2, Run60 
*************************
  [SIZE=3][B]Run  : 60[/B][/SIZE]
*************************
Pinned, e793s, Fri Mar 12 15:48:35 2021, Adrien, RUN, General, N/A, Vamos D and Q value and MW HV  
 
Pinned, e793s, Fri Mar 12 15:50:12 2021, Adrien, RUN, General, N/A, Vamos D and Q value and MW HV  1613EC0C-1F4A-4933-B90A-D98A37421BFF.jpeg4ACA3448-35FF-472C-977C-E642B4ADE6A6.jpeg
Attached are the value for D and Q pole of vamos in case they trip.
Also attached is the computer driving the HV of the focal plan.
Fixed, e793s, Fri Mar 12 15:52:15 2021, Adrien, RUN, General, N/A, to do during run 
[B]Every 1-2h:[/B]

[B]Online: take screen shot of[/B]
Fixed, e793s, Fri Mar 12 16:58:43 2021, OttoRun, RUN, General, CD2, Run61 
*************************
  [SIZE=3][B]Run  : 61[/B][/SIZE]
*************************
Fixed, e793s, Fri Mar 12 18:42:51 2021, Sarah, Louis, BEAM, General, CD2, Beam Back 
The beam is back at 18h40
The beam stopped due to source problems, going up steadily, currently at ~2e5 pps
Fixed, e793s, Fri Mar 12 19:15:19 2021, Charlie, Nigel (watched by Wilton), RUN, General, CD2, Beam alignment tuning 
During part of run #61, Nigel tuned the beam alignment (using the MUST2 hit pattern as the diagnostic). The beam had shifted after the restarting of the
ISOL TIS.  The beam came back at around 18:30 and tuning finished at 19:15. 
Fixed, e793s, Fri Mar 12 20:43:38 2021, Cyril, Louis, OFFLINE, General, CD2, DWBA DWBA.pngDWBA2.png
DBWA analysis have been performed with TWOFNR, here the comparison with data for the 0, 2 and 4 MeV peaks. 
1p1/2 (black line) and 0f7/2 (red line)
Fixed, e793s, Fri Mar 12 20:54:30 2021, mugast, RUN, General, CD2, summary of run 61 scalers.pngvamos.pngScreenshot_from_2021-03-12_20-57-53.pngScreenshot_from_2021-03-12_20-58-15.pngScreenshot_from_2021-03-12_20-58-45.png
 
Fixed, e793s, Fri Mar 12 22:03:31 2021, Nishu, GiB, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 21:00 Screenshot_from_2021-03-12_22-07-22.png
Back to normal around 22:00 after restarting HV 5 to 11 (except 10 which was still on)
Fixed, e793s, Fri Mar 12 22:26:55 2021, julien, nishu, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 22:24 
back again to normal, 
Fixed, e793s, Fri Mar 12 22:31:46 2021, julien, nishu, VAMOS, Hardware, CD2, VAMOS tripped @ ~ 22:24 ans again ~ 22:45 vamos_nc.pngScreenshot_from_2021-03-12_22-33-47.pngScreenshot_from_2021-03-12_22-47-38.png
back again to normal after restarting the HV
(22:39)
Fixed, e793s, Fri Mar 12 23:16:16 2021, julien, nishu, RUN, Hardware, CD2, vamos count rate goes down to 0 once again IMG20210312231358.jpgIMG20210312230429.jpg
We reduced the high voltage limit to 520v from 525v.
please see the screen shots of the focal planes attached below:.
Fixed, e793s, Fri Mar 12 23:27:58 2021, julien, nishu, RUN, General, CD2, summary of run 61 Screenshot_from_2021-03-12_23-31-23.pngScreenshot_from_2021-03-12_23-31-07.pngScreenshot_from_2021-03-12_23-30-43.pngScreenshot_from_2021-03-12_23-30-22.pngScreenshot_from_2021-03-12_23-29-52.png
below attached the screenshots of scalers and spectra
Fixed, e793s, Fri Mar 12 23:54:52 2021, julien, nishu, Faïrouz, VAMOS, Hardware, CD2, Vamos tripped @ 23h35 & fixed 
 
Fixed, e793s, Sat Mar 13 01:41:21 2021, Juan Lois & faïrouz, RUN, General, CD2, run61 screenshots at 1h40 8x
 
Fixed, e793s, Sat Mar 13 02:31:33 2021, Faïrouz, Juan Lois, VAMOS, Hardware, CD2, Vamos tripped @ 2h32 & fixed 
 
Fixed, e793s, Sat Mar 13 03:50:54 2021, Faïrouz, Juan Lois, RUN, General, CD2, run61 screenshots at 3h44 8x
 
Pending, e793s, Sat Mar 13 05:11:08 2021, Faïrouz, Juan Lois, AGATA, Software, CD2, Problem with AGATA acquisition started at 4h40 run61-scalers_5h19.png

There is a problem with AGATA Acquisition. All the bars in the global status & control are yellow!!! 
This problem started at 4h40. 

ELOG Home Page