MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUGAST, Page 106 of 132  Not logged in MUGAST
Fixed, e768s, Tue Jul 23 19:21:50 2019, Nicolas, OTHER, Social, N/A, Waiting end of canicule (and beam!) IMG_20190723_173257.jpg
 
Fixed, e768s, Wed Jul 24 16:24:18 2019, Nicolas, OTHER, General, , 19Ne / 19F analog connections ne19_f19_AnalogStates.pdf
 
    Fixed, e768s, Sun Jul 28 16:23:48 2019, Nicolas, RUN, General, , Update on possible restart 
Same situation as before lunch, the beam is still in C0 and not yet in CSS1. We may have beam in late evening....
    Ongoing, e768s, Sun Jul 28 19:58:57 2019, Nicolas, RUN, General, , Update on possible restart 
Beam is now at the exit of CSS2 though We may have beam around midnight....[/quote]
    Fixed, e768s, Sun Jul 28 21:59:43 2019, Nicolas, RUN, General, , Update on possible restart 
Beam is in G1 with 3e6 pps. PCP will optimize for about 1-1,5h before we take the beam.
Fixed, e768s, Tue Jul 30 15:47:46 2019, Nicolas, BEAM, General, , Beam stopped since 11h30 
vacuum problem in CSS1
Pinned, e775s, Thu Feb 27 12:44:37 2020, Nicolas, OFFLINE, Software, , How to produce control spectra 
In /home/mugast/analysis/nptool/Projects/MUGAST/e775s directory there is the Control.C macro which draws: Ex, Ex vs Eg and Elab vs thetalab for each run
(run number must be given in argument) or for chained runs (argument must be 0)
    Pinned, e775s, Thu Feb 27 16:35:26 2020, Nicolas, OFFLINE, Software, , How to produce control spectra 
[quote="Nicolas"]In /home/mugast/analysis/nptool/Projects/MUGAST/e775s directory there is the Control.C macro which draws: Ex, Ex vs Eg and Elab vs thetalab
for each run (run number must be given in argument) or for chained runs (argument must be 0)[/quote]
Fixed, e793s, Sun Mar 14 18:13:28 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 18h14 10x
 
Fixed, e793s, Sun Mar 14 20:11:17 2021, Miguel, Wilton, Nishu, Dieter, Ablaihan, RUN, General, CD2, run62 screenshots at 20h00 10x
Beam progressively down from 5 to 4 10^5. Went to PCP, they were losing intensity in the primary beam, from 500 to 400 nA. Working on it (21:30)...
Fixed, e793s, Sun Mar 14 22:01:04 2021, Miguel, Wilton, Ablaihan,nishu, RUN, General, CD2, summary of run 62@22:00hrs 9x
 
Fixed, e793s, Sun Mar 14 17:16:01 2021, Miguel, Wilton, Ablaihan, BEAM, Hardware, CD2, Beam went down for a couple of minutes at 17:13. Now it is ok, screenshot attached. Screenshot_from_2021-03-14_17-21-50_Beam_is_ok.png
Beam went up to 2x10^6 pps in CATS.

Then it went down to 0 for a couple of minutes at 17:13.
    Fixed, e768s, Tue Jul 23 14:33:03 2019, Marlène, Yorick, Faïrouz & Nicolas, BEAM, General, , Cheking beam transmission from G1 profiler to VAMOS 714D4921-2A75-44B7-AD8D-87048BDA17A8.jpeg6A77930D-8992-4118-B59C-DBAA37289533.jpeg3CD66D1D-D6E6-44B4-A15A-C947F048D2A0.jpeg
Goal:
Estimate beam transmission from profiler to VAMOS (FP)
We question whether the factor of two found yesterday (VAMOS/Profiler ~ 0.5) could be due:
Fixed, e768s, Mon Jul 15 19:59:30 2019, Marlène, Nicolas, Serge, RUN, General, N/A, Run10 - fsc 
*************************
  [SIZE=3][B]Run  : 10[/B][/SIZE]
*************************
Fixed, e768s, Mon Jul 15 20:18:07 2019, Marlène, Nicolas, Serge, RUN, General, N/A, Run13 - fsc 
*************************
  [SIZE=3][B]Run  : 13[/B][/SIZE]
*************************
Fixed, TEST, Wed Feb 12 16:24:52 2020, Marlène, Freddy & Franco, MUST2, Hardware, , Modifications on the electronic scheme 
We cleaned the electronic scheme.
Now the HF CLEAN VAMOS is taken directly from VAMOS and not re-cleaned by us.
TACs are all ok. Inspection lines have been checked and labeled.
Fixed, e768s, Mon Jul 22 11:42:22 2019, Marlène, François D, Franck, BEAM, General, LiF, Beam profile and intensity IMG_20190722_113900.jpg
Intensity = 1.8e7 pps

Slight shifts in x and y compared to this morning 8:30
Fixed, e768s, Mon Jul 22 16:54:33 2019, Marlène, Franck, François & Nicolas, BEAM, General, , Cheking beam transmission from G1 profiler to VAMOS 
Goal:
Estimate beam transmission from profiler to VAMOS (FP)
Fixed, e768s, Mon Jul 22 17:07:39 2019, Marlène, Franck, François & Nicolas, BEAM, General, , Profiler conditions for measuring beam intensity 
We checked that the measured beam intensity (present case 1.5e7 pps) is independent on the voltage on the profiler. Values from 93 V up to 177 V gave similar
results.
Fixed, e768s, Fri Jul 26 02:27:48 2019, Marlène, Faïrouz, Franck, Bertrand, Sylvain, Diego, Nicolas, BEAM, General, , G1 profiler efficiency 
G1 profiler efficiency was checked against CATS1 for two beam intensities. Agreement between the two measurements is within 20%

Profiler -> CATS1

ELOG Home Page