Fixed | e748 |
Wed Jun 7 11:29:55 2017 |
Adrien | MECH | Hardware | N/A | Surveyor mesurement | The surveyor are carrying out the measurement
of the detectors in D6.
The measurement should take the day, starting |
|
Fixed | e748 |
Wed Jun 7 18:03:02 2017 |
Franck | OTHER | Hardware | | LPC electronics | Caen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
|
|
Fixed | e748 |
Thu Jun 8 18:57:14 2017 |
Valérie Lapoux | MUST2 | Hardware | | Currents and Voltages on MUST2 | Thursday 8th June.
Vacuum in the chamber 9e-05 mbar; MUST2 temperature
at -5°C.
|
|
Fixed | e748 |
Fri Jun 9 12:30:49 2017 |
Adrien | VACUUM | Hardware | | Vacuum Leaks | We reach a stable 1e-5 mbar. We performed
a leak check and identify that the Ionisation
chamber gate valve is not totally tight, |
|
Fixed | e748 |
Fri Jun 9 12:33:25 2017 |
Adrien | MECH | General | | MUST2 position | After a the surveyor came we figured out the
MUST2 telescope are 1cm too high with respect
to the beam line.
|
|
Fixed | e748 |
Fri Jun 9 12:34:18 2017 |
Adrien | DAQ | Hardware | | Hub | We are currentlky waiting for the hub to be
configured so we can start the MUST2 DAQ.
Should be done in the afternoon. |
|
Fixed | e748 |
Fri Jun 9 12:35:46 2017 |
Adrien | MUST2 | Hardware | | CsI trip on T6 | The detector were left on during the night.
T6 CsI trip and cannot be switch on again.
Once we established that all the MUFFEE works |
|
Fixed | e748 |
Fri Jun 9 14:41:54 2017 |
e748 | CATS | General | | Runs 1 - 4 | Tests alpha source, dummy data |
|
Fixed | e748 |
Mon Jun 12 11:34:07 2017 |
e748 | MUST2 | Hardware | | MUVI cars setup | We had problem with MUVI1 (pre serie 1) not
working properly when a telescope was pluggeg
(but fine otherwise).
|
|
Fixed | e748 |
Mon Jun 12 11:36:34 2017 |
e748 | MUST2 | Hardware | | I2C error on Telescope | At the Moment we got I2C error on the following
detectors:
|
|
Fixed | e748 |
Mon Jun 12 11:50:34 2017 |
e748 | CATS | Software | | Settings QDC | Gates QDC CATS1X, CATS1Y, CATS2X, CATS2Y:
0.996
Pedestal QDC CATS1X, CATS1Y, CATS2X: 0.5
|
|
Fixed | e748 |
Mon Jun 12 11:52:16 2017 |
e748 | CATS | General | | Run 6 and 7: Calibration Runs CATS | Run 6: Calib CATS1 X&Y
--> Full, x2, x5, pedestal
|
|
Fixed | e748 |
Mon Jun 12 11:55:27 2017 |
e748 | CATS | General | | Run 5 - JUNK pulser run on CATS1 | Dummy run with pulser.
JUNK |
|
Fixed | e748 |
Mon Jun 12 14:09:24 2017 |
e748 | CATS | Software | | calibration coefficients Runs 6-7 | columns are for 1st order calib (y= ax + b):
pedestal - b - a |
    |
Fixed | e748 |
Mon Jun 12 16:56:36 2017 |
e748 | OTHER | General | | e748 Proposal | Experiment proposal |
|
Fixed | e748 |
Mon Jun 12 22:48:45 2017 |
Valérie Lapoux | MUST2 | General | | Tests of the DAQ with the Alpha Source | 12Th June. 3-peak Alpha source rotated towards
the telescopes MM1 to MM4 (square wall of
4 telescopes).
|
8x |
Fixed | e748 |
Wed Jun 14 12:13:00 2017 |
e748 | MUST2 | Hardware | | MUST2 I2C Err debugging | It appears several SL cables are faulty.
To avoid manipulation of all the cable we
now have T1-4 working. These required to |
|
Fixed | e748 |
Thu Jun 15 17:51:15 2017 |
e748 | RUN | General | 3-alpha | Run 5-7 | [SIZE=3]run5[/SIZE]
alpha source
|
|
Fixed | e748 |
Fri Jun 16 09:57:54 2017 |
e748 | RUN | General | 3-alpha | Run 11 | RUN 11 : alpha calibration with suppression
of zeros ( & alignment of pedestals) for
all night |
|
Fixed | e748 |
Fri Jun 16 09:59:00 2017 |
e748 | RUN | General | 60Co | Run 12 | RUN 12 : EXL trigger in GMT
+ gamma source 60Co
|
 |