Fixed, e748, Wed Jun 7 11:29:55 2017, Adrien, MECH, Hardware, N/A, Surveyor mesurement 
The surveyor are carrying out the measurement of the detectors in D6.
The measurement should take the day, starting with the main plate, and then in the afternoon the detectors.
Fixed, e748, Wed Jun 7 18:03:02 2017, Franck, OTHER, Hardware, , LPC electronics 
Caen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
Fixed, e748, Thu Jun 8 18:57:14 2017, Valérie Lapoux, MUST2, Hardware, , Currents and Voltages on MUST2  
Thursday 8th June. 
Vacuum in the chamber 9e-05 mbar; MUST2 temperature at -5°C.
Low voltages and HV ON 
Fixed, e748, Fri Jun 9 12:30:49 2017, Adrien, VACUUM, Hardware, , Vacuum Leaks 
We reach a stable 1e-5 mbar. We performed a leak check and identify that the Ionisation chamber gate valve is not totally tight, I don't think there is
much to be done.
One of the M2C flange also have a micro leak, that we will solve next tuesday when reopening the chamber.
Fixed, e748, Fri Jun 9 12:33:25 2017, Adrien, MECH, General, , MUST2 position 
After a the surveyor came we figured out the MUST2 telescope are 1cm too high with respect to the beam line.
Vincent is preparing new feet to replace the one supporting the main plate. We will support the plate with adjustable one while replacing the other so
there is no need to dismount any detector.
Fixed, e748, Fri Jun 9 12:34:18 2017, Adrien, DAQ, Hardware, , Hub 
We are currentlky waiting for the hub to be configured so we can start the MUST2 DAQ. Should be done in the afternoon.
Fixed, e748, Fri Jun 9 12:35:46 2017, Adrien, MUST2, Hardware, , CsI trip on T6 
The detector were left on during the night. T6 CsI trip and cannot be switch on again. Once we established that all the MUFFEE works correctly we will start
investigating the issue, perhaps coming from the distribution box.
Fixed, e748, Fri Jun 9 14:41:54 2017, e748, CATS, General, , Runs 1 - 4 
Tests alpha source, dummy data
Fixed, e748, Mon Jun 12 11:34:07 2017, e748, MUST2, Hardware, , MUVI cars setup 
We had problem with MUVI1 (pre serie 1) not working properly when a telescope was pluggeg (but fine otherwise).
Charles Houarner changed the card to MUVI serie 5, and the card is now working.
Fixed, e748, Mon Jun 12 11:36:34 2017, e748, MUST2, Hardware, , I2C error on Telescope 
At the Moment we got I2C error on the following detectors:

[LIST]
Fixed, e748, Mon Jun 12 11:50:34 2017, e748, CATS, Software, , Settings QDC 
Gates QDC CATS1X, CATS1Y, CATS2X, CATS2Y: 0.996
Pedestal QDC CATS1X, CATS1Y, CATS2X: 0.5
Pedestal QDC CATS2Y: 0.699
Fixed, e748, Mon Jun 12 11:52:16 2017, e748, CATS, General, , Run 6 and 7: Calibration Runs CATS Capture.png
Run 6: Calib CATS1 X&Y
--> Full, x2, x5, pedestal
Fixed, e748, Mon Jun 12 11:55:27 2017, e748, CATS, General, , Run 5 - JUNK pulser run on CATS1 
Dummy run with pulser.
JUNK
Fixed, e748, Mon Jun 12 14:09:24 2017, e748, CATS, Software, , calibration coefficients Runs 6-7 CATS_Pulser_Calib_Run6-7.pngCATS1_X.e748CATS1_Y.e748CATS2_X.e748CATS2_Y.e748
columns are for 1st order calib (y= ax + b):
pedestal - b - a
Fixed, e748, Mon Jun 12 16:56:36 2017, e748, OTHER, General, , e748 Proposal Matta_PAC_GANIL_June_2016_v3.pdf
Experiment proposal
Fixed, e748, Mon Jun 12 22:48:45 2017, Valérie Lapoux, MUST2, General, , Tests of the DAQ with the Alpha Source 8x
12Th June. 3-peak Alpha source rotated towards the telescopes MM1 to MM4 (square wall of 4 telescopes).
MUVI configurations are fixed on the DAS. See pictures below. Thresholds : 402 keV.
We have DAS error messages for telescopes T2 and T7 with problems of data transmission, "I2C errors" = logic signals problems, maybe due to 
Fixed, e748, Wed Jun 14 12:13:00 2017, e748, MUST2, Hardware, , MUST2 I2C Err debugging 
It appears several SL cables are faulty.
To avoid manipulation of all the cable we now have T1-4 working. These required to scavenge SL T5 and give it to T2.
Fixed, e748, Thu Jun 15 17:51:15 2017, e748, RUN, General, 3-alpha, Run 5-7 MUST2_EXT2.png
[SIZE=3]run5[/SIZE]

alpha source 
Fixed, e748, Fri Jun 16 09:57:54 2017, e748, RUN, General, 3-alpha, Run 11 
RUN 11 : alpha calibration with suppression of zeros ( & alignment of pedestals) for all night
Fixed, e748, Fri Jun 16 09:59:00 2017, e748, RUN, General, 60Co, Run 12 exl_co_source.pngexl_co_source_i.png
RUN 12 : EXL trigger in GMT