MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 7 of 48  Not logged in MUST2
Statusdown ExpNbr Date Author Type Category Target-Source Subject Text Attachments
Ongoinge738 Wed Jun 27 17:42:14 2018 daisukeOTHERGeneralN/AToward E738   2018-06-13_e738_setup.pdf2018-06-27_e738_chio_energy_loss.pdf2018-06-27_e738_light_tof.pdfpt_sim_phase_plot_7c_t.pdfpt_sim_phase_plot_8c_d.pdf 
Ongoinge755 Sat Jun 30 20:12:33 2018 takeshiTARGETHardwareCryo-LH2target temperatureLatest update at 12:15 pm on July 1
Here are the temperature logs up to 7:00pm
30/6.
 cell3006.pngheatshield3006.pngscreenshot_2018-07-01_12.17.48.pngscreenshot_2018-07-01_12.22.29.png 
Ongoinge738 Mon Jul 2 01:29:58 2018 daisukeOTHERGeneralN/AQ values 
 Reaction : 9C(1H,3H)7C  Q -29.5098 MeV 
Ex 0 MeV
 ensdf_10c_via_pt.pdfPhysRevC.3.543.pdf 
Ongoinge755 Mon Jul 2 16:16:40 2018 takeshiTARGETHardwareCryo-LH2temperature log of the target   heatshield0207.pngcell0207.png 
Ongoinge738 Sun Jul 8 08:53:44 2018 takeshiTARGETHardwareCryo-LH2temperature log of the target   cell0807.pngheatshield0807.pngtempepature0807.png 
Ongoinge738 Mon Jul 9 23:21:55 2018 takeshiTARGETHardwareCryo-LH2temperature log of the targetHere are the temperature logs of the liquid
H2 target up to now.
I would share the log during the regeneration.
 heatshield0907-2.pngcell0907-2.pngregenerate0907.png 
Ongoinge738 Wed Jul 11 03:57:50 2018 e748OFFLINEGeneralCryo-LH2Conversion problemConversion of runs 335 gives the following
error (attached)
Size of raw file =3.5 Go 
 conversion_problem.png 
Ongoinge738 Wed Jul 11 08:32:42 2018 takeshiTARGETHardwareCryo-LH2temperature log of the target   heatshield1107.pngcell1107.png 
Ongoinge738 Wed Jul 11 15:41:33 2018 Franck, Jacques, DaisukeRUNGeneralCryo-LH2Run 347Run 347 Start 15:28 stop 17h17
e748 Exxx 3,6G 11 juil. 17:17 /data/e748X/e755/acquisition/run/run_0347.dat.11-07-18_15h28m32s
CATS thresholds lowered from 40 to 24 mV
 run347_HT_CATS.pngscaler_2018-07-11_15h36m47s.pngvisu_2018-07-11_15h37m23s.pngvisu_2018-07-11_15h37m37s.png 
Ongoinge738 Wed Jul 11 17:25:11 2018 Louis, Daisuke, Nori, ValérieRUNGeneralCryo-LH2Run 348Run 348 Start 17h17

Beam: 9C at 2.3*10⁵pps in CATS1, 2uA
 run348_scalersAt17h26.pngvisu_2018-07-11_17h39m20s.pngvisu_2018-07-11_17h39m25s.pngscaler_STOP_2018-07-11_18h09m53s.png 
Ongoinge738 Thu Jul 12 13:49:38 2018 takeshiTARGETHardwareCryo-LH2temperature log of the target   heatshield1207.pngcell1207.png 
Fixede748 Wed May 24 09:07:59 2017 Adrien MattaOTHERGeneral e748 PlanningFeel free to edit this spread sheet.

  
Fixede748 Wed May 24 09:32:41 2017 Adrien MattaMUST2Hardware Mounting of the telescope in G3The telescope has been mounted in there stand
in G3. 
  
Fixede748 Wed May 24 09:35:00 2017 Adrien MattaCATSHardware BTD chambers mounting in D6Sebastient started mounting the BTD chamber
in D6. 
The frame is in place, BTD chambers one and
  
Fixede748 Wed May 24 15:48:24 2017 Adrien MattaMUST2Hardware PCB number for each telescope[LIST]
[*] T1 PCB 5
[*] T2 PCB 9
  
Fixede748 Thu Jun 1 09:29:50 2017 Adrien MattaMUST2Hardware Telescope cabling debbug in G3Test performed without vaccum, in the dark,
cooling at 20.
  
Fixede748 Thu Jun 1 09:32:38 2017 Adrien MattaMUST2Hardware MUST2 cabling schemeThe MUST2 cabling scheme has been change so
Telescope 1 to 4 and 5 to 8 are on two independent
set of distribution box and HV Card.
  
Fixede748 Fri Jun 2 12:03:32 2017 Adrien, Laurent, ShumpeiMUST2Hardware M2C vacuum testWe mounted 2 dry pump on the chamber and started
pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
  
Fixede748 Tue Jun 6 09:07:34 2017 Adrien MattaBEAMGeneral Moving to D6M2C Chamber now in D6 after a smooth ride,
ready to be aligned.
  
Fixede748 Tue Jun 6 18:17:03 2017 Valérian et FrançoisEXLHardware Hardware coupling of EXL with MUST2EXL seems to fit with Adrien's setup. 
We still have to test if it fits inside the
chamber.
 EXL_MUST2_top.jpgEXL_MUST2_side.jpg 

ELOG Home Page