Ongoing, e738, Wed Jun 27 17:42:14 2018, daisuke, OTHER, General, N/A, Toward E738 2018-06-13_e738_setup.pdf2018-06-27_e738_chio_energy_loss.pdf2018-06-27_e738_light_tof.pdfpt_sim_phase_plot_7c_t.pdfpt_sim_phase_plot_8c_d.pdf
 
Ongoing, e755, Sat Jun 30 20:12:33 2018, takeshi, TARGET, Hardware, Cryo-LH2, target temperature cell3006.pngheatshield3006.pngscreenshot_2018-07-01_12.17.48.pngscreenshot_2018-07-01_12.22.29.png
Latest update at 12:15 pm on July 1
Here are the temperature logs up to 7:00pm 30/6.
Ongoing, e738, Mon Jul 2 01:29:58 2018, daisuke, OTHER, General, N/A, Q values ensdf_10c_via_pt.pdfPhysRevC.3.543.pdf
 
 Reaction : 9C(1H,3H)7C  Q -29.5098 MeV  Ex 0 MeV
    9C  Z   6 A   9  Mass excess    28911.0 keV 
Ongoing, e755, Mon Jul 2 16:16:40 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield0207.pngcell0207.png
 
Ongoing, e738, Sun Jul 8 08:53:44 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target cell0807.pngheatshield0807.pngtempepature0807.png
 
Ongoing, e738, Mon Jul 9 23:21:55 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield0907-2.pngcell0907-2.pngregenerate0907.png
Here are the temperature logs of the liquid H2 target up to now.
I would share the log during the regeneration.
Ongoing, e738, Wed Jul 11 03:57:50 2018, e748, OFFLINE, General, Cryo-LH2, Conversion problem conversion_problem.png
Conversion of runs 335 gives the following error (attached)
Size of raw file =3.5 Go 
Size of root file = 1.5Go
Ongoing, e738, Wed Jul 11 08:32:42 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield1107.pngcell1107.png
 
Ongoing, e738, Wed Jul 11 15:41:33 2018, Franck, Jacques, Daisuke, RUN, General, Cryo-LH2, Run 347 run347_HT_CATS.pngscaler_2018-07-11_15h36m47s.pngvisu_2018-07-11_15h37m23s.pngvisu_2018-07-11_15h37m37s.png
Run 347 Start 15:28 stop 17h17
e748 Exxx 3,6G 11 juil. 17:17 /data/e748X/e755/acquisition/run/run_0347.dat.11-07-18_15h28m32s
CATS thresholds lowered from 40 to 24 mV
Ongoing, e738, Wed Jul 11 17:25:11 2018, Louis, Daisuke, Nori, Valérie, RUN, General, Cryo-LH2, Run 348 run348_scalersAt17h26.pngvisu_2018-07-11_17h39m20s.pngvisu_2018-07-11_17h39m25s.pngscaler_STOP_2018-07-11_18h09m53s.png
Run 348 Start 17h17

Beam: 9C at 2.3*10⁵pps in CATS1, 2uA of intensity of the primary beam
Ongoing, e738, Thu Jul 12 13:49:38 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target heatshield1207.pngcell1207.png
 
Fixed, e748, Wed May 24 09:07:59 2017, Adrien Matta, OTHER, General, , e748 Planning 
Feel free to edit this spread sheet.

Fixed, e748, Wed May 24 09:32:41 2017, Adrien Matta, MUST2, Hardware, , Mounting of the telescope in G3 
The telescope has been mounted in there stand in G3. 

[LIST]
Fixed, e748, Wed May 24 09:35:00 2017, Adrien Matta, CATS, Hardware, , BTD chambers mounting in D6 
Sebastient started mounting the BTD chamber in D6. 
The frame is in place, BTD chambers one and 2 are mounted. 
CATS1 is in BTD1, CATS 2 remain to be mounted. 
Fixed, e748, Wed May 24 15:48:24 2017, Adrien Matta, MUST2, Hardware, , PCB number for each telescope 
[LIST]
[*] T1 PCB 5
[*] T2 PCB 9
Fixed, e748, Thu Jun 1 09:29:50 2017, Adrien Matta, MUST2, Hardware, , Telescope cabling debbug in G3 
Test performed without vaccum, in the dark, cooling at 20.

[LIST]
Fixed, e748, Thu Jun 1 09:32:38 2017, Adrien Matta, MUST2, Hardware, , MUST2 cabling scheme 
The MUST2 cabling scheme has been change so Telescope 1 to 4 and 5 to 8 are on two independent set of distribution box and HV Card.

Telescope 1 to 4 are on the small distribution box and the first HV card. This correspond to the down stream flange.
Fixed, e748, Fri Jun 2 12:03:32 2017, Adrien, Laurent, Shumpei, MUST2, Hardware, , M2C vacuum test 
We mounted 2 dry pump on the chamber and started pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
Waiting to switch on the turbo at 1e-1 mbar.
Fixed, e748, Tue Jun 6 09:07:34 2017, Adrien Matta, BEAM, General, , Moving to D6 
M2C Chamber now in D6 after a smooth ride, ready to be aligned.
Fixed, e748, Tue Jun 6 18:17:03 2017, Valérian et François, EXL, Hardware, , Hardware coupling of EXL with MUST2 EXL_MUST2_top.jpgEXL_MUST2_side.jpg
EXL seems to fit with Adrien's setup. 
We still have to test if it fits inside the chamber.