Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Ongoing | e738 |
Wed Jun 27 17:42:14 2018 |
daisuke | OTHER | General | N/A | Toward E738 | |
    |
Ongoing | e755 |
Sat Jun 30 20:12:33 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | target temperature | Latest update at 12:15 pm on July 1
Here are the temperature logs up to 7:00pm
30/6. |
   |
Ongoing | e738 |
Mon Jul 2 01:29:58 2018 |
daisuke | OTHER | General | N/A | Q values |
Reaction : 9C(1H,3H)7C Q -29.5098 MeV
Ex 0 MeV
|
 |
Ongoing | e755 |
Mon Jul 2 16:16:40 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Ongoing | e738 |
Sun Jul 8 08:53:44 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
  |
Ongoing | e738 |
Mon Jul 9 23:21:55 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here are the temperature logs of the liquid
H2 target up to now.
I would share the log during the regeneration. |
  |
Ongoing | e738 |
Wed Jul 11 03:57:50 2018 |
e748 | OFFLINE | General | Cryo-LH2 | Conversion problem | Conversion of runs 335 gives the following
error (attached)
Size of raw file =3.5 Go
|
|
Ongoing | e738 |
Wed Jul 11 08:32:42 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Ongoing | e738 |
Wed Jul 11 15:41:33 2018 |
Franck, Jacques, Daisuke | RUN | General | Cryo-LH2 | Run 347 | Run 347 Start 15:28 stop 17h17
e748 Exxx 3,6G 11 juil. 17:17 /data/e748X/e755/acquisition/run/run_0347.dat.11-07-18_15h28m32s
CATS thresholds lowered from 40 to 24 mV
|
   |
Ongoing | e738 |
Wed Jul 11 17:25:11 2018 |
Louis, Daisuke, Nori, Valérie | RUN | General | Cryo-LH2 | Run 348 | Run 348 Start 17h17
Beam: 9C at 2.3*10⁵pps in CATS1, 2uA |
   |
Ongoing | e738 |
Thu Jul 12 13:49:38 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | |
 |
Fixed | e748 |
Wed May 24 09:07:59 2017 |
Adrien Matta | OTHER | General | | e748 Planning | Feel free to edit this spread sheet.
|
|
Fixed | e748 |
Wed May 24 09:32:41 2017 |
Adrien Matta | MUST2 | Hardware | | Mounting of the telescope in G3 | The telescope has been mounted in there stand
in G3.
|
|
Fixed | e748 |
Wed May 24 09:35:00 2017 |
Adrien Matta | CATS | Hardware | | BTD chambers mounting in D6 | Sebastient started mounting the BTD chamber
in D6.
The frame is in place, BTD chambers one and |
|
Fixed | e748 |
Wed May 24 15:48:24 2017 |
Adrien Matta | MUST2 | Hardware | | PCB number for each telescope | [LIST]
[*] T1 PCB 5
[*] T2 PCB 9
|
|
Fixed | e748 |
Thu Jun 1 09:29:50 2017 |
Adrien Matta | MUST2 | Hardware | | Telescope cabling debbug in G3 | Test performed without vaccum, in the dark,
cooling at 20.
|
|
Fixed | e748 |
Thu Jun 1 09:32:38 2017 |
Adrien Matta | MUST2 | Hardware | | MUST2 cabling scheme | The MUST2 cabling scheme has been change so
Telescope 1 to 4 and 5 to 8 are on two independent
set of distribution box and HV Card.
|
|
Fixed | e748 |
Fri Jun 2 12:03:32 2017 |
Adrien, Laurent, Shumpei | MUST2 | Hardware | | M2C vacuum test | We mounted 2 dry pump on the chamber and started
pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
|
|
Fixed | e748 |
Tue Jun 6 09:07:34 2017 |
Adrien Matta | BEAM | General | | Moving to D6 | M2C Chamber now in D6 after a smooth ride,
ready to be aligned. |
|
Fixed | e748 |
Tue Jun 6 18:17:03 2017 |
Valérian et François | EXL | Hardware | | Hardware coupling of EXL with MUST2 | EXL seems to fit with Adrien's setup.
We still have to test if it fits inside the
chamber. |
 |