MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 46 of 48  Not logged in MUST2
Fixed, e738, Thu Jul 12 22:45:50 2018, Frank, Louis, RUN, General, Cryo-LH2, RUN 366 15x
RUN 366

start: 22h44 stop: 00h42

12C primary I : 1.8 uA
CATS1: 200 kHz ; CATS2: 185 kHz
Plast : 177 kHz
FAG ~ 755/s

CATS1 670 V I ~ 0.14 ľA ; CATS2 650V I ~ 0.10V
Fixed, e738, Fri Jul 13 00:45:45 2018, Pierre, RUN, General, Cryo-LH2, Run 367 
start: 00h44
Fixed, e738, Fri Jul 13 00:47:23 2018, Pierre, RUN, General, Cryo-LH2, Run 367 scaler_2018-07-13_00h46m09s.pngvisu_2018-07-13_00h51m01s.pngvisu_2018-07-13_00h50m40s.png
RUN 367

start: 00h44
stop: 02h44

CATS1: 670 V & 0.10 uA
CATS2: 650 V & 0.08 uA
Fixed, e738, Fri Jul 13 02:45:44 2018, Pierre, RUN, General, Cryo-LH2, Run 368 7x
RUN 368

start: 02h44
stop: 04h46

CATS1: 670V & 0.14 uA
CATS2: 650V & 0.10 uA
Fixed, e738, Fri Jul 13 04:09:10 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature of the target cell1307.png
We found the target temperature suddenly increased at around 3:40 13th.
The online beam image is still indicating the target is filled up to now.
Fixed, e738, Fri Jul 13 04:48:19 2018, Pierre, RUN, General, Cryo-LH2, Run 369 7x
RUN 369

start: 04h47
stop:06h41

CATS1: 670V & 0.10 uA
CATS2: 650V & 0.08 uA

The run is stopped due to some issues from the cyclotron (some tripping).
Could take up to 2 hours to have the beam back.
Fixed, e738, Fri Jul 13 06:02:31 2018, takeshi, pierre, TARGET, General, Cryo-LH2, target is half filled target1307.pdfcell1307_2.png
We found the liquid hydrogen target is filled only half during the run 368, around 4:10.
We will continue the measurement for now.
Fixed, e738, Fri Jul 13 09:03:11 2018, takeshi, RUN, General, Cryo-LH2, run summary 9C + H2 
Here is the run summary of the setting 9C beam + liquid H2 target.
Up to now, we have obtained 78 hours data, including missing strips in CATS , MUST2*BEAM trigger test, and half-filled target.
We will go to 9C + empty setting from 9:10.

See spreadsheet for the detail.
https://docs.google.com/spreadsheets/d/1yErcQcrXPdJjEOfUd9D9KPWWkWQpw5kX4wFze6vwij4/edit#gid=805236919
Fixed, e738, Fri Jul 13 09:35:26 2018, Olivier, Serge, Jacques, J-C, thomas, shumpei, daisuke, RUN, General, Cryo-empty, RUN 370 visu_2018-07-13_09h36m18s.pngscaler_2018-07-13_09h36m16s.png
Empty target + 9C.
9h29 The beam is back. start 9h28 stop 11h21
e748 Exxx 2,1G 13 juil. 11:21 /data/e748X/e755/acquisition/run/run_0370.dat.13-07-18_09h28m21s
Fixed, e738, Fri Jul 13 13:41:48 2018, Daisuke, Jacques, Megumi, Olivier, Otsu, Takeshi, Valérie, RUN, General, Cryo-empty, RUNS 371-372 32x
Empty target + 9C.
Run 371 start 11h20 stop 13h20
e748 Exxx 2,1G 13 juil. 13:20 /data/e748X/e755/acquisition/run/run_0371.dat.13-07-18_11h20m03s
Run 371 start 13h20 stop

I primary beam ~ 1.8 ľA large fluctuations down to 0.6 ľA
CATS1 ~ 180kpps CATS2 ~ 164 kpps Plastic ~ 154 kpps
CATS1 HV 670V I~0.12 ľA ; CATS2 HV 650V 0.10 ľA
Fixed, e738, Fri Jul 13 16:41:49 2018, Antoine, Maurycy, OFFLINE, Social, Cryo-LH2, Multiparticles from (p,t) up to 5 Light Charged Particles in Must ! 15x
Fixed, e738, Fri Jul 13 18:07:04 2018, J-C, cristelle, nori, olivier, daisuke, RUN, General, Cryo-empty, RUN 373 scaler_2018-07-13_17h43m06s.pngvisu_2018-07-13_17h43m05s.png
12C 5+ beam. CATS2 trigger.
17h29 start
17h41 stop
Fixed, e738, Fri Jul 13 18:08:31 2018, J-C, cristelle, nori, olivier, daisuke, RUN, General, Cryo-empty, RUN 374 6x
12C5+ beam. Trigger T1-8 + CATS1%30000 + CATS2%30000 + Plastic%10000.
Target empty (under cooling).
beam intensity 350 enA
Fente 31 +/-5 mm
Fente 43 +/-10 mm (both H and V)
Beam energy 55.02 MeV/u
Fixed, e738, Fri Jul 13 21:15:53 2018, J-C, nori, shumpei, takeshi, hide, didier, serge, daisuke, RUN, General, Cryo-empty, RUN 375: 12C pilot run 8x
12C beam + empty target after measurement of 9C momentum distribution.
trigger t1-8 + cats 1 2 %30000 + plastic %10000
start 20h47 / stop 21h08
During this run, wien filter was tuned to center the beam vertically. Final setting is 2.5 kV for negative and 2.5 kV for positive.
The run started with a primary beam intensity of 350 enA. We found that CAVIAR is counting too much and leakage current of CATS1 (0.18 micro A) and 2 (0.14 micro A) are higher than in the 9C measurement. We reduced the beam intensity to 220 enA. The leakage current of CATS1 and 2 are 0.10 and 0.08 micro A, respectively. The plastic rate is about 80 kpps.
Fixed, e738, Fri Jul 13 22:00:59 2018, didier, nori, takeshi, shumpei, hide, daisuke, RUN, General, Cryo-LH2, RUN 376: 12C first run 22x
12C + liquid H.
start 21h44
stop 22h43
Fixed, e738, Fri Jul 13 23:10:55 2018, e748, RUN, General, Cryo-LH2, run 377 13x
count rate in Cats : 100 kHz
Start time: 22:44
Stop: 00:42
Fixed, e738, Fri Jul 13 23:22:26 2018, Shumpei, OFFLINE, General, Cryo-LH2, 12C beam analysis 12c.pdf
Used data run0376 (about 1 hour)

Only target position and recoil pid (deuteron or triton) is gated.
(top left) kinematics for 12C(p,d)11C
(top right) excitation energy of 11C
(bottom left) kinematics for 12C(p,t)10C
(bottom right) excitation energy of 10C

~ 500 counts/ 1 hour 12C(p,t)10C (g.s. + 2+) for T1-T6 total
Fixed, e738, Sat Jul 14 00:32:55 2018, Shumpei, OFFLINE, General, Cryo-empty, empty target analysis for 9C beam setting pd.pdfpd_60deg.pdfpt.pdfpt_60deg.pdf
H2 filled: run0312-0355
empty: run0370-0372

Scale factor for empty run is 10.0

Gate for target position and recoil pid (deuteron or triton)
Gate for theta_cm < 60 deg.

For (p,t) reaction, proton elastic scattering of beam triton contamination cannot be subtracted.
See entry 864
https://elog.lpc-caen.in2p3.fr/MUST2/864
Fixed, e738, Sat Jul 14 01:24:51 2018, e748, RUN, General, Cryo-LH2, run 378 scaler_2018-07-14_00h46m48s.pngvisu_2018-07-14_00h48m31s.pngvisu_2018-07-14_00h52m28s.png
count rate in Cats : 100 kHz
Start time: 00:42
Fixed, e738, Sat Jul 14 02:46:34 2018, e748, RUN, General, Cryo-LH2, run 379 scaler_2018-07-14_02h44m19s.pngvisu_2018-07-14_02h45m36s.png
count rate in Cats : 100 kHz
Start time: 02:41

ELOG Home Page