Fixed, , Fri Jul 7 06:55:54 2017, Anastasia + Iulian, ONLINE, General, CD2, Run 346  MUST2_7am.pngScalers7am_run346.png
Run 346 still running.
We see in the Must2 impact also the other two telescopes T6T7
and clearly the elastic in the E/Theta

The efficiency of CATS 1 seems a bit lower than previously(see scalers below)
Fixed, , Fri Jul 7 07:34:54 2017, Anastasia + Iulian, ONLINE, General, CD2, Run 346 
Beam intensity: 7.433 µA
Fixed, e748, Fri Jul 7 02:28:26 2017, Anastasia + Didier, ONLINE, General, CD2, scalers during run 346 Capture-scalers-run346.png
Fixed, e748, Fri Jul 7 02:56:25 2017, Anastasia + Didier, ONLINE, General, CD2, CATS raw 2D charge during run 346 Capture-catsraw-run346.png
Fixed, , Sat Jul 1 12:45:25 2017, Anastasia , CATS, General, , CATS Calibrated cats_calibrated.png
run_0026 CATS 1 X Y
run_0027 CATS 2 X Y
Fixed, , Thu Jul 6 02:02:48 2017, Anastasia, OFFLINE, General, , First signs of the elastic Elastic.png
Hereby you can see some first signs of the elastic scattering 12Be(d,d)12Be
with punch through events that will be later taken care of, after the calibration of CsI.
Fixed, e748, Fri Jun 23 16:37:54 2017, Adrien, Laurent, Vincent, OTHER, Hardware, , MUST2 chamber opening IMG_1936.JPG
We opened the chamber and the surveyor took there measurement.

We closed the chamber with a 3 alpha source in the target position and a 60Co source on top.

All is now under vacuum, turbo are on and we are already below 1e-4 mbar. Cooling started, right now alcool at 10deg; copper at 12deg.

T5 capton fix.

I will start the LV tonight or tomorrow morning to run pedestal alignment and calibration over the weekend.
Fixed, e748, Fri Jun 2 12:03:32 2017, Adrien, Laurent, Shumpei, MUST2, Hardware, , M2C vacuum test 
We mounted 2 dry pump on the chamber and started pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
Waiting to switch on the turbo at 1e-1 mbar.
Gailor switch on the turbo during lunch time. We reach 2e-5 mbar, but the vacuum is oscillating. Gailor suspect the gauge.
We added a second gauge, it gave 2E-4, switch to a third one, same reading.

So first gauge to be changed.

we are gradually improving vacuum so we thinks it is plastic releasing gas.

Cooling switch on to -10, blocks are cooling down successfully.

All DSSD, CsI and SiLi works with rather low current (below 0.5uA).

After three day, vacuum level rise to 6 mbar. According to Vincent; this is standard for static vacuum, so no sign of major leak.
Fixed, e755, Tue Jun 26 10:03:29 2018, Adrien, Freddy, Marlène, Yorick, Valérie, target team: Daisuke, Takeshi, RUN, General, Cryo-LH2, RUN 141 Run141_scalersAt10h.pngRun141_SiLiT7andT8.pngRun141_scalersAt10h55.pngRun141_scalersAt10h56.pngRun141_scalersAt10h57.png
Run 141 26th june start@ 9h59 stop: 11h12
e748 Exxx 3449521865 26 juin 11:12 /data/e748X/e755/acquisition/run/run_0141.dat.26-06-18_09h59m57s

Trigger: all MM + CATS DIV
Beam= 2.2x10**5 pps at 10h04
Fixed, e748, Thu Jun 22 17:49:20 2017, Adrien and Phil , MUST2, General, , MUST2 telescope test with alpha source T14_X.pdfT14_Y.pdfT58_X.pdfT58_Y.pdf
All Telescope now pass the I2C test.

We ran with an alpha source (attached pictures for the overall sequence),

1. at first the source was at 0deg: T1-4 OK; T6 got half of X strip missing, Y Ok; T7 got half Y missing, X Ok. T5 and 8 see nothing
2. source at 150 deg: T1-4 see nothing; T6-7 see nothing, T8 Ok; T5 got every other strip missing on 3/4 of Y (surely a capton issue).
3. source at 90 deg: T6-7 OK.
Fixed, e755, Wed Jun 13 11:40:18 2018, Adrien Valérian Louis, MUST2, Hardware, 3-alpha, RUN Source 4 Alpha EY_T1_4_13062020.pngEY_T5_8_13062020.pngEX_T1_4_13062020.pngEX_T5_8_13062020.png
run 1: 4 alpha source, without heat shield, 1 bar air inside the target cell.

Data has been taken with a 4 alpha source: 3 alpha around 5Mev plus one around 8.7MeV
On telescope 7 and 8, one can see the four alpha which are not intercepted by the heat shield. Telescope 1 to 4 see only one alpha around 2.5Mev on the border of the strips. T5 and T6 see the alpha at 2.5Mev in the center of stripX.

Fixed, e748, Wed Jun 21 09:05:26 2017, Adrien Matta, Phil Adsley, MUST2, General, , MUST2 Dead Time 
We cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in coincidence with the DT output of the GMT (entry 1), giving a direct reading of the dead time.

Note on MUST2 dead time:
- Without zero suppression the dead time caused by MUVI is 2ms. So this give a 40% DT at 180 counts per second.
- With zero suppression, the DT fall down to 240us (80us cash in to interrupt the CPU and, 80us to process the signal from MUVI to CAS and 80us to send the parameter back to the back plane). So this give a 5-7% DT with 180 counts per second.
- The ADC works in parallel of MUVI, so the DT are not cumulative.
Fixed, e744, Tue Apr 10 17:43:28 2018, Adrien Matta and FyFy, MUST2, Hardware, N/A, login to CAEN SY1527 HV/BT mainframe 
To control the CAEN SY1527 HV/BT mainframe use the following command from a terminal:

telnet 172.16.139.10 1527

OR

Run the alias HV

Login: admin
Password: admin

Press enter, then select channel.

To switch between on/off press space.
Pinned, e748, Thu Mar 23 11:19:13 2017, Adrien Matta, , , , Schedule 
This message will contain the update schedule of the preparation of e748.

Beam time: 1st - 9th of July 2017.


CATS Mounting: 29th
Pinned, General, Fri Mar 24 09:32:11 2017, Adrien Matta, MUST2, Software, , Usefull document for MUST2 operations NOTICE_UTILISATION_MUVI_HARD_et_SOFT_(ver_081013).pdfMUVI_card_USER_MANUAL_(ver_081013).pdf
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS

Run control:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/RCC

Calimero:
http://wiki.ganil.fr/gap/wiki/Documentation/Gru/Calimero
Fixed, e748, Wed May 24 09:07:59 2017, Adrien Matta, OTHER, General, , e748 Planning 

Feel free to edit this spread sheet.

spreadsheet link:  https://docs.google.com/spreadsheets/d/1QD0HMJz3DSaX7VqEz07jOG83-SyeKBIwrZzxFNN0aJk/edit#gid=1578876317

Pinned, e748, Wed May 24 09:19:57 2017, Adrien Matta, OTHER, Social, , e748 Collaborators 
List of Collaborators (Please edit if anyone is missing):

IPNOrsay: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, A. Meyer, E. Rindel

CEA Saclay: M. Vandebrouck, V Lapoux,

Surrey: W. Catford, G Lotay, R. Wilkinson, S. Hallam, M. Moukaddam

Universitad des Santiago de Compostela: B. Fernandez-Dominguez

Ganil: JC Thomas, O. Sorlin, O. Kamalou, F. de Olivera, V Alcindor, T Roger, Maurici, A Lemasson, J Piot, Lucia, C Strodel, Beyan, etudiant beyan ?, J. Pancin, V. Morel, L. Menager, Sebastien Herlant, Sebastien ?, Gailor (?) F. Saillant, C. Houarner, G. Fremont

LPC: F. Delaunay, L. Achouri, J. Gibelin, B. Monteaguo, J Lory, Cedric (?), Y. Merrer.

RIKEN/TODAI: D. Susuki, S. Koyama
Fixed, e748, Wed May 24 09:32:41 2017, Adrien Matta, MUST2, Hardware, , Mounting of the telescope in G3 
The telescope has been mounted in there stand in G3.

  • Detector are now mounted and fitted with their DSSD.
  • BT test ok
  • HT test ongoing
Fixed, e748, Wed May 24 09:35:00 2017, Adrien Matta, CATS, Hardware, , BTD chambers mounting in D6 
Sebastient started mounting the BTD chamber in D6.
The frame is in place, BTD chambers one and 2 are mounted.
CATS1 is in BTD1, CATS 2 remain to be mounted.
The DIN flange for BTD2 is missing.
The chamber need to be Vaccuum tested before surveyor alignement.
Fixed, e748, Wed May 24 15:48:24 2017, Adrien Matta, MUST2, Hardware, , PCB number for each telescope 
  • T1 PCB 5
  • T2 PCB 9
  • T3 PCB 7
  • T4 PCB 11
  • T5 PCB 6
  • T6 PCB 10
  • T7 PCB 3
  • T8 PCB 2