Fixed, , Fri Jul 7 06:55:54 2017, Anastasia + Iulian, ONLINE, General, CD2, Run 346 
|
Run 346 still running.
We see in the Must2 impact also the other two telescopes T6T7
and clearly the elastic in the E/Theta
|
Fixed, , Fri Jul 7 07:34:54 2017, Anastasia + Iulian, ONLINE, General, CD2, Run 346
|
Beam intensity: 7.433 µA |
Fixed, e748, Fri Jul 7 02:28:26 2017, Anastasia + Didier, ONLINE, General, CD2, scalers during run 346
|
[IMG]elog:249/1[/IMG] |
Fixed, e748, Fri Jul 7 02:56:25 2017, Anastasia + Didier, ONLINE, General, CD2, CATS raw 2D charge during run 346
|
[IMG]elog:250/1[/IMG] |
Fixed, , Sat Jul 1 12:45:25 2017, Anastasia , CATS, General, , CATS Calibrated
|
run_0026 CATS 1 X Y
run_0027 CATS 2 X Y |
Fixed, , Thu Jul 6 02:02:48 2017, Anastasia, OFFLINE, General, , First signs of the elastic
|
Hereby you can see some first signs of the [U]elastic scattering[/U] [COLOR=purple]12Be(d,d)12Be[/COLOR]
with punch through events that will be later taken care of, after the calibration of[COLOR=blue] CsI[/COLOR]. |
Fixed, e748, Fri Jun 23 16:37:54 2017, Adrien, Laurent, Vincent, OTHER, Hardware, , MUST2 chamber opening
|
We opened the chamber and the surveyor took there measurement.
We closed the chamber with a 3 alpha source in the target position and a 60Co source on top.
|
Fixed, e748, Fri Jun 2 12:03:32 2017, Adrien, Laurent, Shumpei, MUST2, Hardware, , M2C vacuum test
|
We mounted 2 dry pump on the chamber and started pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
Waiting to switch on the turbo at 1e-1 mbar.
|
Fixed, e755, Tue Jun 26 10:03:29 2018, Adrien, Freddy, Marlène, Yorick, Valérie, target team: Daisuke, Takeshi, RUN, General, Cryo-LH2, RUN 141    
|
Run 141 26th june start@ 9h59 stop: 11h12
e748 Exxx 3449521865 26 juin 11:12 /data/e748X/e755/acquisition/run/run_0141.dat.26-06-18_09h59m57s
|
Fixed, e748, Thu Jun 22 17:49:20 2017, Adrien and Phil , MUST2, General, , MUST2 telescope test with alpha source   
|
All Telescope now pass the I2C test.
We ran with an alpha source (attached pictures for the overall sequence),
|
Fixed, e755, Wed Jun 13 11:40:18 2018, Adrien Valérian Louis, MUST2, Hardware, 3-alpha, RUN Source 4 Alpha   
|
run 1: 4 alpha source, without heat shield, 1 bar air inside the target cell.
Data has been taken with a 4 alpha source: 3 alpha around 5Mev plus one around 8.7MeV
|
Fixed, e748, Wed Jun 21 09:05:26 2017, Adrien Matta, Phil Adsley, MUST2, General, , MUST2 Dead Time
|
We cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in coincidence with the DT output of the GMT (entry 1), giving a direct reading of the dead time.
|
Fixed, e744, Tue Apr 10 17:43:28 2018, Adrien Matta and FyFy, MUST2, Hardware, N/A, login to CAEN SY1527 HV/BT mainframe
|
To control the CAEN SY1527 HV/BT mainframe use the following command from a terminal:
telnet 172.16.139.10 1527
|
Pinned, e748, Thu Mar 23 11:19:13 2017, Adrien Matta, , , , Schedule
|
This message will contain the update schedule of the preparation of e748.
Beam time: 1st - 9th of July 2017.
|
Pinned, General, Fri Mar 24 09:32:11 2017, Adrien Matta, MUST2, Software, , Usefull document for MUST2 operations 
|
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS
|
Fixed, e748, Wed May 24 09:07:59 2017, Adrien Matta, OTHER, General, , e748 Planning
|
Feel free to edit this spread sheet.
|
Pinned, e748, Wed May 24 09:19:57 2017, Adrien Matta, OTHER, Social, , e748 Collaborators
|
List of Collaborators (Please edit if anyone is missing):
[B]IPNOrsay[/B]: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, |
Fixed, e748, Wed May 24 09:32:41 2017, Adrien Matta, MUST2, Hardware, , Mounting of the telescope in G3
|
The telescope has been mounted in there stand in G3.
[LIST]
|
Fixed, e748, Wed May 24 09:35:00 2017, Adrien Matta, CATS, Hardware, , BTD chambers mounting in D6
|
Sebastient started mounting the BTD chamber in D6.
The frame is in place, BTD chambers one and 2 are mounted.
CATS1 is in BTD1, CATS 2 remain to be mounted.
|
Fixed, e748, Wed May 24 15:48:24 2017, Adrien Matta, MUST2, Hardware, , PCB number for each telescope
|
[LIST]
[*] T1 PCB 5
[*] T2 PCB 9
|
|