  MUST2, Page 46 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixed  Fri Jul 7 06:55:54 2017 Anastasia + IulianONLINEGeneralCD2Run 346
Run 346 still running.
We see in the Must2 impact also the other two telescopes T6T7
and clearly the elastic in the E/Theta

The efficiency of CATS 1 seems a bit lower than previously(see scalers below)
Fixed  Fri Jul 7 07:34:54 2017 Anastasia + IulianONLINEGeneralCD2Run 346
Beam intensity: 7.433 µA
Fixede748 Fri Jul 7 02:28:26 2017 Anastasia + DidierONLINEGeneralCD2scalers during run 346
Fixede748 Fri Jul 7 02:56:25 2017 Anastasia + DidierONLINEGeneralCD2CATS raw 2D charge during run 346
Fixed  Sat Jul 1 12:45:25 2017 Anastasia CATSGeneral CATS Calibrated
run_0026 CATS 1 X Y
run_0027 CATS 2 X Y
Fixed  Thu Jul 6 02:02:48 2017 AnastasiaOFFLINEGeneral First signs of the elastic
Hereby you can see some first signs of the elastic scattering 12Be(d,d)12Be
with punch through events that will be later taken care of, after the calibration of CsI.
Fixede748 Fri Jun 23 16:37:54 2017 Adrien, Laurent, VincentOTHERHardware MUST2 chamber opening
We opened the chamber and the surveyor took there measurement.

We closed the chamber with a 3 alpha source in the target position and a 60Co source on top.

All is now under vacuum, turbo are on and we are already below 1e-4 mbar. Cooling started, right now alcool at 10deg; copper at 12deg.

T5 capton fix.

I will start the LV tonight or tomorrow morning to run pedestal alignment and calibration over the weekend.
Fixede748 Fri Jun 2 12:03:32 2017 Adrien, Laurent, ShumpeiMUST2Hardware M2C vacuum test
We mounted 2 dry pump on the chamber and started pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
Waiting to switch on the turbo at 1e-1 mbar.
Gailor switch on the turbo during lunch time. We reach 2e-5 mbar, but the vacuum is oscillating. Gailor suspect the gauge.
We added a second gauge, it gave 2E-4, switch to a third one, same reading.

So first gauge to be changed.

we are gradually improving vacuum so we thinks it is plastic releasing gas.

Cooling switch on to -10, blocks are cooling down successfully.

All DSSD, CsI and SiLi works with rather low current (below 0.5uA).

After three day, vacuum level rise to 6 mbar. According to Vincent; this is standard for static vacuum, so no sign of major leak.
Fixede755 Tue Jun 26 10:03:29 2018 Adrien, Freddy, Marlène, Yorick, Valérie, target team: Daisuke, TakeshiRUNGeneralCryo-LH2RUN 141
Run 141 26th june start@ 9h59 stop: 11h12
e748 Exxx 3449521865 26 juin 11:12 /data/e748X/e755/acquisition/run/run_0141.dat.26-06-18_09h59m57s

Trigger: all MM + CATS DIV
Beam= 2.2x10**5 pps at 10h04
Fixede748 Thu Jun 22 17:49:20 2017 Adrien and Phil MUST2General MUST2 telescope test with alpha source
All Telescope now pass the I2C test.

We ran with an alpha source (attached pictures for the overall sequence),

1. at first the source was at 0deg: T1-4 OK; T6 got half of X strip missing, Y Ok; T7 got half Y missing, X Ok. T5 and 8 see nothing
2. source at 150 deg: T1-4 see nothing; T6-7 see nothing, T8 Ok; T5 got every other strip missing on 3/4 of Y (surely a capton issue).
3. source at 90 deg: T6-7 OK.
Fixede755 Wed Jun 13 11:40:18 2018 Adrien Valérian LouisMUST2Hardware3-alphaRUN Source 4 Alpha
run 1: 4 alpha source, without heat shield, 1 bar air inside the target cell.

Data has been taken with a 4 alpha source: 3 alpha around 5Mev plus one around 8.7MeV
On telescope 7 and 8, one can see the four alpha which are not intercepted by the heat shield. Telescope 1 to 4 see only one alpha around 2.5Mev on the border of the strips. T5 and T6 see the alpha at 2.5Mev in the center of stripX.

Fixede748 Wed Jun 21 09:05:26 2017 Adrien Matta, Phil AdsleyMUST2General MUST2 Dead Time
We cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in coincidence with the DT output of the GMT (entry 1), giving a direct reading of the dead time.

Note on MUST2 dead time:
- Without zero suppression the dead time caused by MUVI is 2ms. So this give a 40% DT at 180 counts per second.
- With zero suppression, the DT fall down to 240us (80us cash in to interrupt the CPU and, 80us to process the signal from MUVI to CAS and 80us to send the parameter back to the back plane). So this give a 5-7% DT with 180 counts per second.
- The ADC works in parallel of MUVI, so the DT are not cumulative.
Fixede744 Tue Apr 10 17:43:28 2018 Adrien Matta and FyFyMUST2HardwareN/Alogin to CAEN SY1527 HV/BT mainframe
To control the CAEN SY1527 HV/BT mainframe use the following command from a terminal:

telnet 172.16.139.10 1527

OR

Run the alias HV

Login: admin
Password: admin

Press enter, then select channel.

To switch between on/off press space.
Pinnede748 Thu Mar 23 11:19:13 2017 Adrien Matta   Schedule
This message will contain the update schedule of the preparation of e748.

Beam time: 1st - 9th of July 2017.


CATS Mounting: 29th
PinnedGeneral Fri Mar 24 09:32:11 2017 Adrien MattaMUST2Software Usefull document for MUST2 operations
DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS

Run control:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/RCC

Calimero:
http://wiki.ganil.fr/gap/wiki/Documentation/Gru/Calimero
Fixede748 Wed May 24 09:07:59 2017 Adrien MattaOTHERGeneral e748 Planning

Feel free to edit this spread sheet.

spreadsheet link:  https://docs.google.com/spreadsheets/d/1QD0HMJz3DSaX7VqEz07jOG83-SyeKBIwrZzxFNN0aJk/edit#gid=1578876317

Pinnede748 Wed May 24 09:19:57 2017 Adrien MattaOTHERSocial e748 Collaborators
List of Collaborators (Please edit if anyone is missing):

IPNOrsay: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, A. Meyer, E. Rindel

CEA Saclay: M. Vandebrouck, V Lapoux,

Surrey: W. Catford, G Lotay, R. Wilkinson, S. Hallam, M. Moukaddam

Universitad des Santiago de Compostela: B. Fernandez-Dominguez

Ganil: JC Thomas, O. Sorlin, O. Kamalou, F. de Olivera, V Alcindor, T Roger, Maurici, A Lemasson, J Piot, Lucia, C Strodel, Beyan, etudiant beyan ?, J. Pancin, V. Morel, L. Menager, Sebastien Herlant, Sebastien ?, Gailor (?) F. Saillant, C. Houarner, G. Fremont

LPC: F. Delaunay, L. Achouri, J. Gibelin, B. Monteaguo, J Lory, Cedric (?), Y. Merrer.

RIKEN/TODAI: D. Susuki, S. Koyama
Fixede748 Wed May 24 09:32:41 2017 Adrien MattaMUST2Hardware Mounting of the telescope in G3
The telescope has been mounted in there stand in G3.

  • Detector are now mounted and fitted with their DSSD.
  • BT test ok
  • HT test ongoing
Fixede748 Wed May 24 09:35:00 2017 Adrien MattaCATSHardware BTD chambers mounting in D6
Sebastient started mounting the BTD chamber in D6.
The frame is in place, BTD chambers one and 2 are mounted.
CATS1 is in BTD1, CATS 2 remain to be mounted.
The DIN flange for BTD2 is missing.
The chamber need to be Vaccuum tested before surveyor alignement.
Fixede748 Wed May 24 15:48:24 2017 Adrien MattaMUST2Hardware PCB number for each telescope
  • T1 PCB 5
  • T2 PCB 9
  • T3 PCB 7
  • T4 PCB 11
  • T5 PCB 6
  • T6 PCB 10
  • T7 PCB 3
  • T8 PCB 2