Fri Jul 7 06:55:54 2017 |
Anastasia + Iulian | ONLINE | General | CD2 | Run 346 | Run 346 still running.
We see in the Must2 impact also the other two telescopes T6T7
and clearly the elastic in the E/Theta
The efficiency of CATS 1 seems a bit lower than previously(see scalers below) |
Fixed | |
Fri Jul 7 07:34:54 2017 |
Anastasia + Iulian | ONLINE | General | CD2 | Run 346 | Beam intensity: 7.433 µA |
Fixed | e748 |
Fri Jul 7 02:28:26 2017 |
Anastasia + Didier | ONLINE | General | CD2 | scalers during run 346 |  |
Fixed | e748 |
Fri Jul 7 02:56:25 2017 |
Anastasia + Didier | ONLINE | General | CD2 | CATS raw 2D charge during run 346 |  |
Fixed | |
Sat Jul 1 12:45:25 2017 |
Anastasia | CATS | General | | CATS Calibrated | run_0026 CATS 1 X Y
run_0027 CATS 2 X Y |
Fixed | |
Thu Jul 6 02:02:48 2017 |
Anastasia | OFFLINE | General | | First signs of the elastic | Hereby you can see some first signs of the elastic scattering 12Be(d,d)12Be
with punch through events that will be later taken care of, after the calibration of CsI. |
Fixed | e748 |
Fri Jun 23 16:37:54 2017 |
Adrien, Laurent, Vincent | OTHER | Hardware | | MUST2 chamber opening | We opened the chamber and the surveyor took there measurement.
We closed the chamber with a 3 alpha source in the target position and a 60Co source on top.
All is now under vacuum, turbo are on and we are already below 1e-4 mbar. Cooling started, right now alcool at 10deg; copper at 12deg.
T5 capton fix.
I will start the LV tonight or tomorrow morning to run pedestal alignment and calibration over the weekend. |
Fixed | e748 |
Fri Jun 2 12:03:32 2017 |
Adrien, Laurent, Shumpei | MUST2 | Hardware | | M2C vacuum test | We mounted 2 dry pump on the chamber and started pumping at 11h.
Pressure was about 6e-1 mbar around 11h45.
Waiting to switch on the turbo at 1e-1 mbar.
Gailor switch on the turbo during lunch time. We reach 2e-5 mbar, but the vacuum is oscillating. Gailor suspect the gauge.
We added a second gauge, it gave 2E-4, switch to a third one, same reading.
So first gauge to be changed.
we are gradually improving vacuum so we thinks it is plastic releasing gas.
Cooling switch on to -10, blocks are cooling down successfully.
All DSSD, CsI and SiLi works with rather low current (below 0.5uA).
After three day, vacuum level rise to 6 mbar. According to Vincent; this is standard for static vacuum, so no sign of major leak. |
Fixed | e755 |
Tue Jun 26 10:03:29 2018 |
Adrien, Freddy, Marlène, Yorick, Valérie, target team: Daisuke, Takeshi | RUN | General | Cryo-LH2 | RUN 141 | Run 141 26th june start@ 9h59 stop: 11h12
e748 Exxx 3449521865 26 juin 11:12 /data/e748X/e755/acquisition/run/run_0141.dat.26-06-18_09h59m57s
Trigger: all MM + CATS DIV
Beam= 2.2x10**5 pps at 10h04
|
Fixed | e748 |
Thu Jun 22 17:49:20 2017 |
Adrien and Phil | MUST2 | General | | MUST2 telescope test with alpha source | All Telescope now pass the I2C test.
We ran with an alpha source (attached pictures for the overall sequence),
1. at first the source was at 0deg: T1-4 OK; T6 got half of X strip missing, Y Ok; T7 got half Y missing, X Ok. T5 and 8 see nothing
2. source at 150 deg: T1-4 see nothing; T6-7 see nothing, T8 Ok; T5 got every other strip missing on 3/4 of Y (surely a capton issue).
3. source at 90 deg: T6-7 OK. |
Fixed | e755 |
Wed Jun 13 11:40:18 2018 |
Adrien Valérian Louis | MUST2 | Hardware | 3-alpha | RUN Source 4 Alpha | run 1: 4 alpha source, without heat shield, 1 bar air inside the target cell.
Data has been taken with a 4 alpha source: 3 alpha around 5Mev plus one around 8.7MeV
On telescope 7 and 8, one can see the four alpha which are not intercepted by the heat shield. Telescope 1 to 4 see only one alpha around 2.5Mev on the border of the strips. T5 and T6 see the alpha at 2.5Mev in the center of stripX.
|
Fixed | e748 |
Wed Jun 21 09:05:26 2017 |
Adrien Matta, Phil Adsley | MUST2 | General | | MUST2 Dead Time | We cabled the Dead time in the scaler.
We have a 100Hz pulser (entry 2 of U2M) in coincidence with the DT output of the GMT (entry 1), giving a direct reading of the dead time.
Note on MUST2 dead time:
- Without zero suppression the dead time caused by MUVI is 2ms. So this give a 40% DT at 180 counts per second.
- With zero suppression, the DT fall down to 240us (80us cash in to interrupt the CPU and, 80us to process the signal from MUVI to CAS and 80us to send the parameter back to the back plane). So this give a 5-7% DT with 180 counts per second.
- The ADC works in parallel of MUVI, so the DT are not cumulative. |
Fixed | e744 |
Tue Apr 10 17:43:28 2018 |
Adrien Matta and FyFy | MUST2 | Hardware | N/A | login to CAEN SY1527 HV/BT mainframe | To control the CAEN SY1527 HV/BT mainframe use the following command from a terminal:
telnet 172.16.139.10 1527
OR
Run the alias HV
Login: admin
Password: admin
Press enter, then select channel.
To switch between on/off press space. |
Pinned | e748 |
Thu Mar 23 11:19:13 2017 |
Adrien Matta | | | | Schedule | This message will contain the update schedule of the preparation of e748.
Beam time: 1st - 9th of July 2017.
CATS Mounting: 29th |
Pinned | General |
Fri Mar 24 09:32:11 2017 |
Adrien Matta | MUST2 | Software | | Usefull document for MUST2 operations | DAS Configuration:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/DAS
Run control:
http://wiki.ganil.fr/gap/wiki/Documentation/Software/RCC
Calimero:
http://wiki.ganil.fr/gap/wiki/Documentation/Gru/Calimero |
Fixed | e748 |
Wed May 24 09:07:59 2017 |
Adrien Matta | OTHER | General | | e748 Planning | Feel free to edit this spread sheet.
spreadsheet link: https://docs.google.com/spreadsheets/d/1QD0HMJz3DSaX7VqEz07jOG83-SyeKBIwrZzxFNN0aJk/edit#gid=1578876317 |
Pinned | e748 |
Wed May 24 09:19:57 2017 |
Adrien Matta | OTHER | Social | | e748 Collaborators | List of Collaborators (Please edit if anyone is missing):
IPNOrsay: D Beaumel, Y. Blumendfeld, M Assie, N de Sereville, F Flavigny, S Franchoo, A Georgiadiou, J. Guillot, F. Hammache, I. Stefan, P. Asdley, A. Meyer, E. Rindel
CEA Saclay: M. Vandebrouck, V Lapoux,
Surrey: W. Catford, G Lotay, R. Wilkinson, S. Hallam, M. Moukaddam
Universitad des Santiago de Compostela: B. Fernandez-Dominguez
Ganil: JC Thomas, O. Sorlin, O. Kamalou, F. de Olivera, V Alcindor, T Roger, Maurici, A Lemasson, J Piot, Lucia, C Strodel, Beyan, etudiant beyan ?, J. Pancin, V. Morel, L. Menager, Sebastien Herlant, Sebastien ?, Gailor (?) F. Saillant, C. Houarner, G. Fremont
LPC: F. Delaunay, L. Achouri, J. Gibelin, B. Monteaguo, J Lory, Cedric (?), Y. Merrer.
RIKEN/TODAI: D. Susuki, S. Koyama |
Fixed | e748 |
Wed May 24 09:32:41 2017 |
Adrien Matta | MUST2 | Hardware | | Mounting of the telescope in G3 | The telescope has been mounted in there stand in G3.
- Detector are now mounted and fitted with their DSSD.
- BT test ok
- HT test ongoing
|
Fixed | e748 |
Wed May 24 09:35:00 2017 |
Adrien Matta | CATS | Hardware | | BTD chambers mounting in D6 | Sebastient started mounting the BTD chamber in D6.
The frame is in place, BTD chambers one and 2 are mounted.
CATS1 is in BTD1, CATS 2 remain to be mounted.
The DIN flange for BTD2 is missing.
The chamber need to be Vaccuum tested before surveyor alignement. |
Fixed | e748 |
Wed May 24 15:48:24 2017 |
Adrien Matta | MUST2 | Hardware | | PCB number for each telescope | - T1 PCB 5
- T2 PCB 9
- T3 PCB 7
- T4 PCB 11
- T5 PCB 6
- T6 PCB 10
- T7 PCB 3
- T8 PCB 2
|
|