MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 44 of 48  Not logged in MUST2
Status ExpNbr Date Author Type Category Target-Source Subject
Fixede738 Tue Jul 10 23:14:31 2018 DDRUNGeneralCryo-LH2RUN 335
9C + Liquid H run.
23h11 start. 1.7 electric micro A. Wien filter 1 kV.
01h06 stop.
Attachment 1: scaler_2018-07-10_23h16m13s.png
scaler_2018-07-10_23h16m13s.png
Fixede738 Wed Jul 11 02:52:54 2018 MarleneRUNGeneralCryo-LH2RUN336
run336 start 1:07 / stop 2:48
fluctuations of beam intensity
Attachment 1: run_336_scalers.png
run_336_scalers.png
Attachment 2: run_336_CATS_pos.png
run_336_CATS_pos.png
Attachment 3: run_336_impact.png
run_336_impact.png
Attachment 4: run_336_pastic.png
run_336_pastic.png
Attachment 5: run_336_HT_BT.png
run_336_HT_BT.png
Attachment 6: run_336_HT_BT_2.png
run_336_HT_BT_2.png
Fixede738 Wed Jul 11 02:55:44 2018 e748RUNGeneralCryo-LH2RUN 337
RUN 337 start 2:49 /stop 4:09

Beam intensity CATS 200k pps
Attachment 1: run_337_HT_BT_cats.png
run_337_HT_BT_cats.png
Attachment 2: run_337_cats_pos.png
run_337_cats_pos.png
Attachment 3: run_337_scaler.png
run_337_scaler.png
Ongoinge738 Wed Jul 11 03:57:50 2018 e748OFFLINEGeneralCryo-LH2Conversion problem
Conversion of runs 335 gives the following error (attached)
Size of raw file =3.5 Go
Size of root file = 1.5Go
Attachment 1: conversion_problem.png
conversion_problem.png
Fixede738 Wed Jul 11 04:16:04 2018 NoriBEAMGeneralCryo-LH2Caviar status
Caviar is now operating at 700 V. TOF-CaviarX position correlations are clearly seen (Attachment 1).
Position efficiencies for each beam species were estimated by applying plastic Q gates on wire multiplicity
distributions (Attachment 2).

9C  98%
8B  96%
7Be 91%
6Li 84%
Attachment 1: run335_cavxcats1hf.png
run335_cavxcats1hf.png
Attachment 2: run335_cavmult.png
run335_cavmult.png
Fixede738 Wed Jul 11 05:11:19 2018 e748RUNGeneralCryo-LH2RUN 338
RUN 338
9C beam 200 k pps
start 4:09 /stop 5:10
Attachment 1: run_338_scaler.png
run_338_scaler.png
Fixede738 Wed Jul 11 06:11:50 2018 e748RUNGeneralCryo-LH2RUN 339
RUN 339
9C 210 k pps
start 5:11 / stop 6:08 (beam stopped)
Attachment 1: run_339_scaler.png
run_339_scaler.png
Attachment 2: run_339_HT_BT_cats.png
run_339_HT_BT_cats.png
Attachment 3: run_339_HT_BT_cats_2png
Attachment 4: run_339_cats_pos.png
run_339_cats_pos.png
Attachment 5: run_339_cats.png
run_339_cats.png
Attachment 6: run_339_mm_raw_T5-8.png
run_339_mm_raw_T5-8.png
Attachment 7: run_339_mm_raw_T1-4.png
run_339_mm_raw_T1-4.png
Attachment 8: run_339_plastic.png
run_339_plastic.png
Attachment 9: run_339_tof.png
run_339_tof.png
Fixede738 Wed Jul 11 06:17:19 2018 e748RUNGeneralCryo-LH2RUn 340
RUn 340
start 6:10 / stop 7:43

CATS2 has tripped
Pendinge738 Wed Jul 11 06:29:00 2018 e748CATSGeneralCryo-LH2CATS2 status
CATS2 current fluctuates a lot and has increased up to 0.26uA in run 340
In run 340 I observe that a second wire is missing, which is new (see attached file for run 339 and run 440)
Attachment 1: run_340_cats.png
run_340_cats.png
Attachment 2: run_339_cats.png
run_339_cats.png
Fixede738 Wed Jul 11 07:49:12 2018 Marlčne, Franck, Jacques, DaisukeRUNGeneralCryo-LH2RUN 341
RUn 341
start 7:44 /stop 9h29

CATS2 high voltage 650V (lowered because it tripped) - I= 0.08uA
CATS2 efficiency ~ 50%
Attachment 1: run_341_scaler.png
run_341_scaler.png
Attachment 2: run_341_cats.png
run_341_cats.png
Attachment 3: run_341-ht_bt_cats.png
run_341-ht_bt_cats.png
Fixede738 Wed Jul 11 08:18:00 2018 NoriCATSGeneralCryo-LH2CATS efficiency
The tracking efficiency is diminishing probably due to damaged CATS2.
Attachment 1: run341_catstracking.png
run341_catstracking.png
Ongoinge738 Wed Jul 11 08:32:42 2018 takeshiTARGETHardwareCryo-LH2temperature log of the target
Attachment 1: heatshield1107.png
heatshield1107.png
Attachment 2: cell1107.png
cell1107.png
Fixede738 Wed Jul 11 09:32:37 2018 Franck, Jacques, DaisukeRUNGeneralCryo-LH2Run 342
Wed 11 July 2018

Start @ 9:19
Stop @ 9:29


CATS1 : 200 kcps
CATS2 : 100 kcps

RUN STOPPED TO REPLACE CATS2
Attachment 1: scaler_2018-07-11_09h24m14s.png
scaler_2018-07-11_09h24m14s.png
Attachment 2: visu_2018-07-11_09h24m41s.png
visu_2018-07-11_09h24m41s.png
Attachment 3: visu_2018-07-11_09h24m54s.png
visu_2018-07-11_09h24m54s.png
Attachment 4: visu_2018-07-11_09h25m04s.png
visu_2018-07-11_09h25m04s.png
Attachment 5: visu_2018-07-11_09h25m15s.png
visu_2018-07-11_09h25m15s.png
Attachment 6: visu_2018-07-11_09h25m37s.png
visu_2018-07-11_09h25m37s.png
Attachment 7: ht_bt_run342_1.png
ht_bt_run342_1.png
Attachment 8: ht_bt_run342_2.png
ht_bt_run342_2.png
Attachment 9: ht_bt_run342_3.png
ht_bt_run342_3.png
Attachment 10: ht_bt_run342_4.png
ht_bt_run342_4.png
Fixede738 Wed Jul 11 12:02:14 2018 NPTeamOFFLINEGeneralCryo-LH2Lauching parrallel analysis of multiple run
We made a parralel conversion script in the conversion folder.
You can run up to 5 run in parallel using the command (for run 331-334 in this example):

./ConvertPhysics.sh 331 332 333 334


when the conversion finnished you will have this display:
- Number of transactions: 3

- Number of transactions: 3

- Number of transactions: 3

- Number of transactions: 3

Please do ctrl-C to get out of the script and start again.
Fixede738 Wed Jul 11 12:04:29 2018 Franck, Jacques + CATS TeamCATSGeneralN/ARun 343 - CATS2 pulser calibration
Start 11:53
Stop 11:59

CATS2 pulser calibration

Attenuations: 1, 2, 4, 5
+ pedestal
Attachment 1: visu_2018-07-11_12h07m59s.png
visu_2018-07-11_12h07m59s.png
Fixede738 Wed Jul 11 13:24:34 2018 Daisuke,CATS team: Séb, Thom ; Franck, Pierre, ValérieRUNGeneralCryo-LH2Runs 344-345
Wed 11 July 2018
run 344 start 12h43 ; stop 13h03
e748 Exxx 900M 11 juil. 13:03 /data/e748X/e755/acquisition/run/run_0344.dat.11-07-18_12h43m33s
run 345 start 13h02 ; stop 14h49
e748 Exxx 3,2G 11 juil. 14:49 /data/e748X/e755/acquisition/run/run_0345.dat.11-07-18_13h02m22s
- - - - - - - - - - - - - - - - - -- - - - - - - - -- - - - - - - - -- - - - - - - - -
change of HV on CATS during Run 345: from 650V to 670V
Current on CATS2 is fluctuating (from 0.12 µA up to 0.6 µA) at oscilloscope, signals remain correct.
At 670V it is better for CATS2 efficiency
See plots : run345_EnergyChioRawTsdiff.png and run345_correlDeIChiotofCatsHF.png
Integral for IC is 8075; integral of the physical events in IC DE versus TOF CATS1 is 7548; for CATS2: integral 7044.
We have a rough estimate of CATS efficiencies: 7548/8075= 93%, for CATS2 87%.
The counting rates on CATS have closer values (at 650V, CATS2 is at 130 k pps; at 670V rate is 170k pps)
CATS1: 190k pps
CATS2: 170k pps
Plastic: 175k pps

Attachment 1: run345_scalersAt13h18.png
run345_scalersAt13h18.png
Attachment 2: run345_HVcats.png
run345_HVcats.png
Attachment 3: run345_correlDeIChiotofCatsHF.png
run345_correlDeIChiotofCatsHF.png
Attachment 4: run345_EnergyChioRawTsdiff.png
run345_EnergyChioRawTsdiff.png
Attachment 5: run345_BeamTracks.png
run345_BeamTracks.png
Attachment 6: run345_CatsStrQcal.png
run345_CatsStrQcal.png
Attachment 7: run345_CatsStrQRaw.png
run345_CatsStrQRaw.png
Attachment 8: run345_DCNumexoXY.png
run345_DCNumexoXY.png
Attachment 9: run345_MMimpacts.png
run345_MMimpacts.png
Attachment 10: run345_ICNumexo0deg.png
run345_ICNumexo0deg.png
Attachment 11: run345_TcatsCaviar.png
run345_TcatsCaviar.png
Attachment 12: run345_TCatsPlast.png
run345_TCatsPlast.png
Fixede738 Wed Jul 11 14:51:13 2018 Daisuke, Franck, Shumpei, ValérieRUNGeneralCryo-LH2Run 346
Wed 11 July 2018
run 346 start 14h50; stop 15h14
748 Exxx 777M 11 juil. 15:14 /data/e748X/e755/acquisition/run/run_0346.dat.11-07-18_14h48m47s
- - - - - - - - - - - - - - - - - -- - - - - - - - -- - - - - - - - -- - - - - - - - -
CATS1 670V I~0.14µA
CATS2 670V ; Current on CATS2 is fluctuating (from 0.12 µA up to 0.6 and 0.98 µA).

CATS1: 200k pps
CATS2: 180k pps
Plastic: 190k pps

Attachment 1: run346_ScalersAt14h57.png
run346_ScalersAt14h57.png
Ongoinge738 Wed Jul 11 15:41:33 2018 Franck, Jacques, DaisukeRUNGeneralCryo-LH2Run 347
Run 347 Start 15:28 stop 17h17
e748 Exxx 3,6G 11 juil. 17:17 /data/e748X/e755/acquisition/run/run_0347.dat.11-07-18_15h28m32s
CATS thresholds lowered from 40 to 24 mV

CATS2 HT lowered from 670 to 650 V

Currents: CATS1 0.16 µA , CATS2 0.12 -> 1 µA
Current spikes on CATS2 less frequent than at 670 V

Rates:
CATS1: 215 kcps
CATS2: 186 kcps
CAVIAR: 250 kcps
Plastic: 190 kcps
Attachment 1: run347_HT_CATS.png
run347_HT_CATS.png
Attachment 2: scaler_2018-07-11_15h36m47s.png
scaler_2018-07-11_15h36m47s.png
Attachment 3: visu_2018-07-11_15h37m23s.png
visu_2018-07-11_15h37m23s.png
Attachment 4: visu_2018-07-11_15h37m37s.png
visu_2018-07-11_15h37m37s.png
Fixede738 Wed Jul 11 16:51:50 2018 NoriCATSGeneralCryo-LH2CATS efficiency
The tracking efficiency recovered after replacing CATS2.

9C  91%
8B  87%
7Be 77%
6Li 62%
Attachment 1: run347_catseff.png
run347_catseff.png
Ongoinge738 Wed Jul 11 17:25:11 2018 Louis, Daisuke, Nori, ValérieRUNGeneralCryo-LH2Run 348
Run 348 Start 17h17

Beam: 9C at 2.3*10⁵pps in CATS1, 2uA of intensity of the primary beam


CATS1 670V 0.16 µA ,
CATS2 650V 0.12 -> 0.6 µA

Rates:
CATS1: 230 kpps
CATS2: 200 kcps
CAVIAR: 260 kcps
Plastic: 200 kcps
Attachment 1: run348_scalersAt17h26.png
run348_scalersAt17h26.png
Attachment 2: visu_2018-07-11_17h39m20s.png
visu_2018-07-11_17h39m20s.png
Attachment 3: visu_2018-07-11_17h39m25s.png
visu_2018-07-11_17h39m25s.png
Attachment 4: scaler_STOP_2018-07-11_18h09m53s.png
scaler_STOP_2018-07-11_18h09m53s.png

ELOG Home Page