Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e738 |
Mon Jul 9 20:33:00 2018 |
Daisuke Louis Valérie | RUN | General | Cryo-LH2 | RUN 321- ok again ! | Run 321 start 20:09
Total beam on CATS ~ 1.7 10**5 /s
Beam of 9C, 7Be, 8B and 6Li
|
20x |
Fixed | e738 |
Mon Jul 9 22:15:04 2018 |
DIdier Daisuke Nori Louis Valérie | RUN | General | Cryo-LH2 | RUN 322, strip CATS2 X 19 off | Run 322 start: 22h00 stop: 0h21
e748 Exxx 3,7G 10 juil. 00:21 run_0322.dat.09-07-18_21h58m34s
Beam: 9C
|
7x |
Ongoing | e738 |
Mon Jul 9 23:21:55 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target | Here are the temperature logs of the liquid
H2 target up to now.
I would share the log during the regeneration. |
  |
Fixed | e738 |
Mon Jul 9 23:25:10 2018 |
takeshi | RUN | General | Cryo-LH2 | run summary for 10C beam | With 10C beam, we have obtained
31.7 hours of liq. H2 target and
1.2 hours of empty target.
|
|
Fixed | e738 |
Mon Jul 9 23:29:18 2018 |
Nori | CATS | General | Cryo-LH2 | CATS tracking efficiency | Analyzed run 312 (9C physics run). CATS calibration
files with lowered threshold values
(/home/e748/analysis/nptool/Projects/e755/Calibration/cats/CATS1_X.e738.npt, |
 |
Fixed | e738 |
Tue Jul 10 00:46:26 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 323 + Brho line settings | Run 323 start: 0h20 stop: 2h45
e748 Exxx 3,5G 10 juil. 02:45 run_0323.dat.10-07-18_00h20m04s
|
  |
Fixed | e738 |
Tue Jul 10 01:26:21 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis for 10C(p,d)9C and 10C(p,t)8C updated | Used data run run0284-0302 (almost all for
10C beam)
CsI calibration parameters are the same as |
6x |
Fixed | e738 |
Tue Jul 10 02:47:10 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 324 | Run 324 start: 2h45 stop 5h10
e748 Exxx 3,8G 10 juil. 05:10 run_0324.dat.10-07-18_02h44m52s
Beam: 9C
|
24x |
Fixed | e738 |
Tue Jul 10 05:12:31 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 325 | Run 325 start: 5h10 stop 6h53 due to CATS1
-->tripping
e748 Exxx 2,5G 10 juil. 06:53 run_0325.dat.10-07-18_05h09m53s
|
  |
Fixed | e738 |
Tue Jul 10 05:23:19 2018 |
Shumpei | OFFLINE | General | Cryo-LH2 | Analysis for 9C beam setting | Used data: run0312 (about 80 minutes data
taking).
Analysis for (p,d) channel and invariant |
  |
Fixed | e738 |
Tue Jul 10 05:25:42 2018 |
Shumpei | BEAM | General | Cryo-LH2 | triton contamination in the 9C beam setting | In MUST2 dE-E plot, strong locus for triton
E ~ 40 MeV exists.
Kinematics for triton bellow 45 MeV matches |
  |
Fixed | e738 |
Tue Jul 10 07:16:16 2018 |
Shumpei, Valérie | RUN | General | Cryo-LH2 | RUN 326 | Run 326 start: 6h59
Beam: 9C
|
9x |
Fixed | e738 |
Tue Jul 10 12:51:37 2018 |
marlène, olivier, J-C, daisuke | RUN | General | Cryo-LH2 | RUN 330 | 9C + liquid H. Data taking after replacing
CATS1.
12h03 started
|
28x |
Fixed | e738 |
Tue Jul 10 13:59:09 2018 |
jacques, daisuke, freddy | RUN | General | Cryo-LH2 | RUN 331 | 9C + liquid H
13h56 start. 12C 1.7 electric micro A.
16h51 stop |
6x |
Fixed | e738 |
Tue Jul 10 14:22:22 2018 |
Nori | BEAM | General | Cryo-LH2 | Beam image on target | Reconstructed beam images from run0330. |
  |
Fixed | e738 |
Tue Jul 10 15:17:21 2018 |
Nori | CATS | General | Cryo-LH2 | CATS tracking efficiency | Tracking efficiencies deduced from run 330
(after replacing CATS1).
|
|
Fixed | e738 |
Tue Jul 10 16:28:53 2018 |
daisuke | OTHER | Social | N/A | 6Li(p,d)5Li | The peak near 16 MeV was observed in a measurement
in the 1960s. The resonance is close to the
3He-d threshold. The narrow width indicates |
   |
Fixed | e738 |
Tue Jul 10 17:02:02 2018 |
jacques, daisuke, freddy, louis | RUN | General | Cryo-LH2 | RUN 332 | 12C primary: 1.7 uA
start: 16h52
stop: 17h52
|
  |
Fixed | e738 |
Tue Jul 10 18:23:01 2018 |
daisuke | OTHER | Social | N/A | mirror reaction of 7Be(p,d)6Be | |
 |
Fixed | e738 |
Tue Jul 10 21:26:48 2018 |
didier, daisuke | RUN | General | Cryo-LH2 | RUN 334 | 9C + liquid H. Probably nobody cares this
post right now, but the beam is back.
|
17x |