MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 43 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede738 Sat Jul 14 20:16:50 2018 Daisuke, Shumpei, ValérieRUNGeneralCryo-LH2RUN 392 9C
9C + liquid H.
RUN 392 start 19h46 stop 21h47
e748 Exxx 3,5G 14 juil. 21:49 /data/e748X/e755/acquisition/run/run_0392.dat.14-07-18_19h45m58s
normal TRIGGERS MUST2 CATS div Plastic div
Brho1 RMN = 1.7311 T.m ID3P1= 305.1A
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA
Intensity is fluctuating at the end of run 392 down to I~ 1.7 ľA then 1.6-1.5ľA.
Apparently due to general instabilities related to the decrease of the external air temperature (..). PCP is re-tuning.
Total integral:1.0 10**4 (without 0, all beams)
8B 8.2% (integral = 824 for channels [200;2200])
9C ~ 4.5 % (integral = 454 for channels [2800;4200])
7Be 65.8 % (integral = 6585 for channels [4500;6500])
6Li 21.1% (integral = 2113 for channels [6500;8000])

Beam CATS1 ~ 185kpps; CATS ~ 164 kpps ; Plastic ~ 170 kpps
CATS1 I ~ 0.08 ľA
CATS2 I ~ 0.06 ľA
Attachment 1: Run392_TOF.png
Run392_TOF.png
Attachment 2: Run392_scalers.png
Run392_scalers.png
Attachment 3: Run392_GMTTrigger.png
Run392_GMTTrigger.png
Attachment 4: Run392_plotTrigger.png
Run392_plotTrigger.png
Attachment 5: Run392_TOFcatstot.png
Run392_TOFcatstot.png
Attachment 6: Run392_TOFcatstotZoom.png
Run392_TOFcatstotZoom.png
Attachment 7: Run392_ScalersPlot.png
Run392_ScalersPlot.png
Attachment 8: Run392_PlotPlast.png
Run392_PlotPlast.png
Attachment 9: Run392_MMimpacts.png
Run392_MMimpacts.png
Attachment 10: Run392_MMECsIraw.png
Run392_MMECsIraw.png
Attachment 11: Run392_DCnumexo.png
Run392_DCnumexo.png
Attachment 12: Run392_CatsstrQraw.png
Run392_CatsstrQraw.png
Attachment 13: Run392_CatsQcal.png
Run392_CatsQcal.png
Attachment 14: Run392_BeamTracks.png
Run392_BeamTracks.png
Attachment 15: Run392_EdeTOFcatsTot.png
Run392_EdeTOFcatsTot.png
Attachment 16: Run392_EdeTOFcatsIntegIC.png
Run392_EdeTOFcatsIntegIC.png
Attachment 17: Run392_EdeTOFcatsEdePlast.png
Run392_EdeTOFcatsEdePlast.png
Attachment 18: Run392_DCnumexoXYphys.png
Run392_DCnumexoXYphys.png
Attachment 19: Run392_ChIoNumexo.png
Run392_ChIoNumexo.png
Attachment 20: Run392_MmEdeCsIPlotPID.png
Run392_MmEdeCsIPlotPID.png
Attachment 21: Run392_scalersendRun.png
Run392_scalersendRun.png
Fixede738 Sat Jul 14 21:53:48 2018 Daisuke, Shumpei, ValérieRUNGeneralCryo-LH2RUN 393 9C
9C + liquid H.
RUN 393 start 21h48 stop 23h49
e748 Exxx 4,0G 14 juil. 23:49 /data/e748X/e755/acquisition/run/run_0393.dat.14-07-18_21h48m17s
e748 Exxx 382M 15 juil. 00:01 /data/e748X/e755/acquisition/run/run_0393.dat.14-07-18_21h48m17s.1

normal TRIGGERS MUST2 CATS div Plastic div
Brho1 RMN = 1.7311 T.m ID3P1= 305.1A
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA
PCP retuned the beam. Intensity is increasing up to 1.8 ľA but fluctuating again down to 1.5 ľA.
Better at 22h10, I ~ 1.88 ľA.

Beam CATS1 ~ 188kpps ; CATS2 ~ 167 kpps ; Plastic ~ 172 kpps
up to CATS1 214 kpps; CATS2 ~ 191 kpps; ; Plastic ~ 198 kpps.
CATS1 I ~ 0.08 ľA to 0.14 ľA
CATS2 I ~ 0.06 ľA to 0.10 ľA
Attachment 1: Run393_scalersAt21h54.png
Run393_scalersAt21h54.png
Attachment 2: Run393_MMimpacts.png
Run393_MMimpacts.png
Attachment 3: Run393_MMedeCsIPID.png
Run393_MMedeCsIPID.png
Attachment 4: Run393_BeamTracks.png
Run393_BeamTracks.png
Attachment 5: Run393IC0degDet.png
Run393IC0degDet.png
Attachment 6: Run393_EdeTOF_EDEPlastPID.png
Run393_EdeTOF_EDEPlastPID.png
Attachment 7: Run393_EdeTOFcats.png
Run393_EdeTOFcats.png
Attachment 8: Run393catsQraw.png
Run393catsQraw.png
Attachment 9: Run393scalersEndRun.png
Run393scalersEndRun.png
Fixede748 Sat Jul 8 08:39:10 2017 Daisuke, ShumpeiOFFLINEGeneralCD212Be(d,t)?
/home/e748/analysis/nptool/Outputs/Analysis/runtest.root (run_0331_0.root?) was analyzed.
DSSD energy vs theta_lab plot for triton is attatched.
The gates to select triton are also shown.
gate;
target position on target
chio vs Qplastic rough Z=4
DSSD energy vs TOF mass=3 and no signal in CsI
Only MM1 is analized.

We need more statistics, but we can't analyze CsI data maybe because position matching with DSSD?
Attachment 1: 2017-07-08_run331_12be_dt_likely.png
2017-07-08_run331_12be_dt_likely.png
Attachment 2: 2017_07_08_gate.png
2017_07_08_gate.png
Attachment 3: 2017_07_08_chio_gate.png
2017_07_08_chio_gate.png
Fixede738 Thu Jul 12 08:16:21 2018 Daisuke, Megumi, ValérieRUNGeneralCryo-LH2RUN 358
RUN 358
start: 8h14 stop: 9h48

e748 Exxx 3,3G 12 juil. 09:49 /data/e748X/e755/acquisition/run/run_0358.dat.12-07-18_08h12m26s


12C primary : 1.95 uA
CATS1: 224 kHz ; CATS2: 194 kHz
PL : 199 kHz

CATS1 670 V I ~ 0.16 ľA ; CATS2 650V I ~ 0.12V
Efficiencies estimated from the integrals in the plots IC_dE1_TCATS1HF
cf run358_ICdeTcatsHFtot.png run358_ICdeTcatsHFeff.png
CATS 1: (2.8 10**4)/(3.1 10**4) =0.90 -->90% ; CATS2 (2.7 10**4)/(3.06 10**4)==> 88%
Attachment 1: run358_scalersAt8h13.png
run358_scalersAt8h13.png
Attachment 2: run358_BeamTracks.png
run358_BeamTracks.png
Attachment 3: run358_CATSqraw.png
run358_CATSqraw.png
Attachment 4: run358_CATSqCal.png
run358_CATSqCal.png
Attachment 5: run358_ICdeTcatsHFtot.png
run358_ICdeTcatsHFtot.png
Attachment 6: run358_ICdeTcatsHFeff.png
run358_ICdeTcatsHFeff.png
Attachment 7: run358_TofCatsHF.png
run358_TofCatsHF.png
Attachment 8: run358_TCATSplast.png
run358_TCATSplast.png
Attachment 9: run358_npScalers.png
run358_npScalers.png
Attachment 10: run358_MMimpacts.png
run358_MMimpacts.png
Attachment 11: run358_MM5toMM8strxYE.png
run358_MM5toMM8strxYE.png
Attachment 12: run358_MM1toMM6EcsIEraw.png
run358_MM1toMM6EcsIEraw.png
Attachment 13: run358_MM1toMM6EcsIEcal.png
run358_MM1toMM6EcsIEcal.png
Attachment 14: run358_MM1toMM6DECsiE.png
run358_MM1toMM6DECsiE.png
Attachment 15: run358_MM1toMM4strxYE.png
run358_MM1toMM4strxYE.png
Attachment 16: run358_ICOdegDet.png
run358_ICOdegDet.png
Attachment 17: run358_EDeTofCatsCaviar.png
run358_EDeTofCatsCaviar.png
Attachment 18: run358_DCnumexoXYphys.png
run358_DCnumexoXYphys.png
Attachment 19: run358_DCnumexoEraw.png
run358_DCnumexoEraw.png
Attachment 20: run358_MM1toMM6EdeCsiEzoomPDT.png
run358_MM1toMM6EdeCsiEzoomPDT.png
Fixede738 Thu Jul 12 09:52:07 2018 Daisuke, Megumi, ValérieRUNGeneralCryo-LH2RUN 359
RUN 359

start: 9h48 stop: 11h25
748 Exxx 3,2G 12 juil. 11:25 /data/e748X/e755/acquisition/run/run_0359.dat.12-07-18_09h48m08s
12C primary : 1.98 uA
CATS1: 230 kHz ; CATS2: 198 kHz
PL : 205 kHz

CATS1 670 V I ~ 0.16 ľA ; CATS2 650V I ~ 0.12V
Attachment 1: run359_scalersAt9h48png
Attachment 2: run359_CatsQraw.png
run359_CatsQraw.png
Attachment 3: run359_BeamTracks.png
run359_BeamTracks.png
Attachment 4: run359_MM1toMM6EdeCsiEzoomPDT.png
run359_MM1toMM6EdeCsiEzoomPDT.png
Attachment 5: run359_MM1toMM6EdeCsiE.png
run359_MM1toMM6EdeCsiE.png
Attachment 6: Run359_projCATS2strY8.png
Run359_projCATS2strY8.png
Fixede738 Thu Jul 12 11:28:46 2018 Daisuke, Megumi, ValérieRUNGeneralCryo-LH2RUN 360
RUN 360
e748 Exxx 3,4G 12 juil. 13:08 /data/e748X/e755/acquisition/run/run_0360.dat.12-07-18_11h24m44s
start: 11h25 stop: 13h08
12C primary : 1.95 uA
CATS1: 230 kHz ; CATS2: 198 kHz
PL : 205 kHz

CATS1 670 V I ~ 0.16 ľA ; CATS2 650V I ~ 0.12V
Stable conditions for beam and CATS during the run.
Series of plots for the raw spectra of CATS1 strips.
Attachment 1: Run360_scalersAt11h26.png
Run360_scalersAt11h26.png
Attachment 2: Run360_projCATS1strY14.png
Run360_projCATS1strY14.png
Attachment 3: Run360_projCATS1strY9.png
Run360_projCATS1strY9.png
Attachment 4: Run360_projCATS1strY8.png
Run360_projCATS1strY8.png
Attachment 5: Run360_projCATS1strY7.png
Run360_projCATS1strY7.png
Attachment 6: Run360_projCATS1strX13.png
Run360_projCATS1strX13.png
Attachment 7: Run360_de_TOFcatsCaviar.png
Run360_de_TOFcatsCaviar.png
Attachment 8: Run360_de_ICraw0degPlast.png
Run360_de_ICraw0degPlast.png
Attachment 9: Run360_TCATSHF.png
Run360_TCATSHF.png
Attachment 10: Run360_ScalersEndrun.png
Run360_ScalersEndrun.png
Fixede738 Thu Jul 12 13:09:14 2018 Daisuke, Megumi, ValérieRUNGeneralCryo-LH2RUN 361
RUN 361
e748 Exxx 3,5G 12 juil. 15:01 /data/e748X/e755/acquisition/run/run_0361.dat.12-07-18_13h07m40s
start: 13h08 stop: 14h59
12C primary : 1.8 uA
CATS1: 200 kHz ; CATS2: 175 kHz
Plast : 178 kHz

CATS1 670 V, I ~ 0.14 ľA ; CATS2 650V, I ~ 0.10V sometimes up Ovc to 0.38 ľA but rather stable.
Attachment 1: Run361_ScalersAt13h10.png
Run361_ScalersAt13h10.png
Attachment 2: Run361_trigger.png
Run361_trigger.png
Attachment 3: Run361_MMimpacts.png
Run361_MMimpacts.png
Attachment 4: Run361_MMedeCsIPid.png
Run361_MMedeCsIPid.png
Attachment 5: Run361_Beamtracks.png
Run361_Beamtracks.png
Attachment 6: Run361_scalersEndRun.png
Run361_scalersEndRun.png
Fixede755 Sun Jun 24 22:18:50 2018 Daisuke, Louis, Olivier, ValérieRUNGeneralCryo-LH2RUN 107
run 107 start@ 22h15; stop@ 22h37
e748 Exxx 689278077 24 juin 22:37 /data/e748X/e755/acquisition/run/run_0107.dat.24-06-18_22h15m16s
Attachment 1: Run107scalersAt22h17.png
Run107scalersAt22h17.png
Attachment 2: TriggerMMandCATSRun107.png
TriggerMMandCATSRun107.png
Attachment 3: TriggerMM2Run107ProfileCats.png
TriggerMM2Run107ProfileCats.png
Fixede755 Sun Jun 24 22:26:46 2018 Daisuke, Louis, Olivier, ValérieMUST2GeneralCryo-LH2HV on MUST2, currents, CATS
NB: SiLi1 T7 has tripped during the evening (since Run 104)
It should be put on again (better to increase the HV during a beam stop)
Attachment 1: HVonMUST2mm1to4.png
HVonMUST2mm1to4.png
Attachment 2: HVonMUST2mm5to8andCats.png
HVonMUST2mm5to8andCats.png
Fixede755 Tue Jun 26 14:29:36 2018 Daisuke, Louis, Olivier, ValérieRUNGeneralCryo-LH2RUN 146
Run 146 -- 26th June start@ 14h07 stop @14h26
e748 Exxx 844513015 26 juin 14:26 /data/e748X/e755/acquisition/run/run_0146.dat.26-06-18_14h07m32s
The run was stopped: no beam due to the source disjonction.
Trigger: all MM + CATS DIV
conditions of the MUST2 pedestals as before
Fixede738 Thu Jul 12 15:07:43 2018 Daisuke, Louis, Marlčne, Megumi, ValérieRUNGeneralCryo-LH2RUN 362-TRIGGER TESTS
RUN 362 WITH CHANGE OF TRIGGERS FOR TESTS see below
e748 Exxx 1,7G 12 juil. 16:09 /data/e748X/e755/acquisition/run/run_0362.dat.12-07-18_15h08m50s
start: 15h08 stop: 16h08
12C primary : between 1.7 and 1.9 uA
CATS1: 200 kHz ; CATS2: 175 kHz
Plast : 178 kHz FAG ~ 650/s

CATS1 670 V I ~ 0.14 ľA ; CATS2 650V I ~ 0.10V sometimes up Ovc to 0.38 ľA but rather stable.

The triggers can be seen on Run362_TriggerMMallCats.png
There are: IN10- CATS1div and IN11 -CATS2div, IN16 Plastic %
IN12 and IN14.

NB: the entry IN12 noted "CATS" in the snapshot was MM2all div, with div =10
In Gatconfmaster the value is 2**(12-1) = 2048.
The "IN14" trigger input is:
MM2all*CATS (hardware coincidence between MUST2 and CATS) in IN14
GMT trigger in GATCONFmaster : 2**(14-1) = 2**13 = 8192.
Attachment 1: Run362_TriggerMMallCats.png
Run362_TriggerMMallCats.png
Attachment 2: Run362_scalersAt15h11.png
Run362_scalersAt15h11.png
Attachment 3: Run362_scalersendRun.png
Run362_scalersendRun.png
Attachment 4: Run362_TOFcatsHF.png
Run362_TOFcatsHF.png
Attachment 5: Run362_NumexoDECXY.png
Run362_NumexoDECXY.png
Attachment 6: Run362_MMimpacts.png
Run362_MMimpacts.png
Attachment 7: Run362_MMedeCsI.png
Run362_MMedeCsI.png
Attachment 8: Run362_EdeTOFcaviarQplast.png
Run362_EdeTOFcaviarQplast.png
Attachment 9: Run362_EdeTOFcatsHF.png
Run362_EdeTOFcatsHF.png
Attachment 10: Run362_CatsStrQraw.png
Run362_CatsStrQraw.png
Attachment 11: Run362_BeamTracks.png
Run362_BeamTracks.png
Fixede738 Sat Jul 14 19:38:25 2018 Daisuke, Jean-Charles, Shumpei, ValérieRUNGeneralCryo-LH2RUN 391 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA

RUN 391 start 19h30 stop 19h43
e748 Exxx 286M 14 juil. 19:45 /data/e748X/e755/acquisition/run/run_0391.dat.14-07-18_19h30m29s
normal TRIGGERS MUST2 CATS div Plastic div
Brho1 RMN = 1.7311 T.m ID3P1=

Total integral: 4.017 10**4 (without 0, all beams)
9C ~ 5 % (integral = 2160 for channels [2800;4200])
7Be 59 % (integral = 2.236 10**4 for channels [4500;6500])

Beam CATS1 ~ 133 kpps; CATS ~ 117 kpps ; Plastic ~ 124 kpps
CATS1 I ~ 0.08 ľA
CATS2 I ~ 0.06 ľA
Attachment 1: Run391_TOF.png
Run391_TOF.png
Attachment 2: Run391_scalers.png
Run391_scalers.png
Fixede738 Sat Jul 14 18:18:33 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 386 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 2mm then +/-5 mm at the beginning of the run
RUN 386 start 18h16 stop 18h28
e748 Exxx 1,3G 14 juil. 2018 /data/e748X/e755/acquisition/run/run_0386.dat.14-07-18_18h15m43s
Attachment 1: Run386_ScalersFH31at5mm_At18h18.png
Run386_ScalersFH31at5mm_At18h18.png
Attachment 2: Run386_ScalersFH31at5mm_Caviar.png
Run386_ScalersFH31at5mm_Caviar.png
Attachment 3: Run386_TOF_FH31_5mm.png
Run386_TOF_FH31_5mm.png
Attachment 4: Run386_ScalersFH31at5mm_Caviar.png
Run386_ScalersFH31at5mm_Caviar.png
Attachment 5: Run386_ScalersFH31at5mm_At18h18.png
Run386_ScalersFH31at5mm_At18h18.png
Attachment 6: Run386_Ic_DE_TcatsHF_FH31_5mm.png
Run386_Ic_DE_TcatsHF_FH31_5mm.png
Attachment 7: Run386_Ic_DE_Tcats_Caviar_PLQFH31_5mm.png
Run386_Ic_DE_Tcats_Caviar_PLQFH31_5mm.png
Attachment 8: Run386_BeamImpact_5mm.png
Run386_BeamImpact_5mm.png
Fixede738 Sat Jul 14 18:36:38 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 387 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 5 mm F43 opened
I ~ 1.6ľA TRIGGERS CATS2, PLASTIC div
RUN 387
Fixede738 Sat Jul 14 18:37:29 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 388 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 5 mm F43 opened
I ~ 1.6ľA normal TRIGGERS MUST2 CATS div Plastic div
RUN 388 start 18h3
Attachment 1: Run388_ScalersCaviarFH31_5mm_I1.6ÂľA.png
Run388_ScalersCaviarFH31_5mm_I1.6ÂľA.png
Attachment 2: Run388_Scalers.png
Run388_Scalers.png
Attachment 3: Run388_TOF.png
Run388_TOF.png
Fixede738 Sat Jul 14 18:54:01 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 389 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 30 mm F43 opened
I ~ 1.6ľA normal TRIGGERS MUST2 CATS div Plastic div
RUN 389 start 18h45 stop 18h55
e748 Exxx 469M 14 juil. 18:57 /data/e748X/e755/acquisition/run/run_0389.dat.14-07-18_18h44m21s
Attachment 1: Run389_scalersCaviar.png
Run389_scalersCaviar.png
Attachment 2: Run389_scalers.png
Run389_scalers.png
Attachment 3: Run389_TOF.png
Run389_TOF.png
Attachment 4: Run389_EdeTOFCatsIntr.png
Run389_EdeTOFCatsIntr.png
Attachment 5: Run389_EdeTOFCats.png
Run389_EdeTOFCats.png
Attachment 6: Run389_EdeTOF.png
Run389_EdeTOF.png
Attachment 7: Run389_beamTracks.png
Run389_beamTracks.png
Fixede738 Sat Jul 14 19:01:22 2018 Daisuke, Jean-Charles, Megumi, Nori, Shumpei, ValérieRUNGeneralCryo-LH2RUN 390 TUNING 9C
9C + liquid H.
SLITS FH31 +/- 20 mm F43 V 10 mm; FH43 10 mm I~1.9 ľA

normal TRIGGERS MUST2 CATS div Plastic div
RUN 390 start 18h58 stop 19h27
e748 Exxx 873M 14 juil. 19:29 /data/e748X/e755/acquisition/run/run_0390.dat.14-07-18_18h57m53s
CATS1 I ~ 0.22ľA
CATS2 I~ 0.16 ľA
Brho1 RMN = 1.7283 T.m I_D3P1= 305A
The Brho1 value is there 0.1% smaller than it was during the previous data taking for 9C.
Here the purity of the beams is:
Total integral: 6.22 10**4 (without 0, all beams)
9C 3.5% (integral = 2200 for channels [2800;4200])
7Be 72.2% (integral = 4.488 10**4 for channels [4500;6500])
6Li 15% (integral = 9570 for channels [6500;8000])
Attachment 1: Run390_scalersCaviar.png
Run390_scalersCaviar.png
Attachment 2: Run390_scalers.png
Run390_scalers.png
Attachment 3: Run390_beamTracksYshift.png
Run390_beamTracksYshift.png
Attachment 4: Run390_beamTrackWien1kVYok.png
Run390_beamTrackWien1kVYok.png
Attachment 5: Run390_scalersYcenterOk.png
Run390_scalersYcenterOk.png
Attachment 6: Run390_scalersCaviarYOk.png
Run390_scalersCaviarYOk.png
Attachment 7: Run390_TOF.png
Run390_TOF.png
Fixede738 Sat Jul 14 14:01:55 2018 Daisuke, Jacques, Shumpei, ValérieRUNGeneralCryo-LH2RUNS 384-385
12C + liquid H.

RUN 384 start 13h58 stop 15h54
CATS1/2 110 kHz, 0.12/0.10 micro A Plastic 90 kHz.
e748 Exxx 2,1G 14 juil. 15:54 /data/e748X/e755/acquisition/run/run_0384.dat.14-07-18_13h58m20s

RUN 385 start 15h54 stop 18h05
e748 Exxx 2,5G 14 juil. 2018 /data/e748X/e755/acquisition/run/run_0385.dat.14-07-18_15h53m48s
Attachment 1: scaler_2018-07-14_14h02m40s.png
scaler_2018-07-14_14h02m40s.png
Attachment 2: screenshot_2018-07-14_14h03m00s.png
screenshot_2018-07-14_14h03m00s.png
Attachment 3: scaler_2018-07-14_14h26m35s.png
scaler_2018-07-14_14h26m35s.png
Attachment 4: scaler_2018-07-14_15h53m36s.png
scaler_2018-07-14_15h53m36s.png
Attachment 5: visu_2018-07-14_15h53m38s.png
visu_2018-07-14_15h53m38s.png
Attachment 6: visu_2018-07-14_15h53m45s.png
visu_2018-07-14_15h53m45s.png
Attachment 7: visu_2018-07-14_15h53m50s.png
visu_2018-07-14_15h53m50s.png
Attachment 8: visu_2018-07-14_15h53m56s.png
visu_2018-07-14_15h53m56s.png
Attachment 9: visu_2018-07-14_15h54m03s.png
visu_2018-07-14_15h54m03s.png
Attachment 10: visu_2018-07-14_15h54m10s.png
visu_2018-07-14_15h54m10s.png
Attachment 11: visu_2018-07-14_15h54m19s.png
visu_2018-07-14_15h54m19s.png
Attachment 12: ScalersRun385At17h.png
ScalersRun385At17h.png
Attachment 13: Run385_MMEdePID.png
Run385_MMEdePID.png
Attachment 14: Run385_IC0deg.png
Run385_IC0deg.png
Attachment 15: Run385_deTOFCatsCaviar.png
Run385_deTOFCatsCaviar.png
Attachment 16: Run385_ScalersEndRun.png
Run385_ScalersEndRun.png
Fixede738 Fri Jul 13 13:41:48 2018 Daisuke, Jacques, Megumi, Olivier, Otsu, Takeshi, ValérieRUNGeneralCryo-emptyRUNS 371-372
Empty target + 9C.
Run 371 start 11h20 stop 13h20
e748 Exxx 2,1G 13 juil. 13:20 /data/e748X/e755/acquisition/run/run_0371.dat.13-07-18_11h20m03s
Run 371 start 13h20 stop

I primary beam ~ 1.8 ľA large fluctuations down to 0.6 ľA
CATS1 ~ 180kpps CATS2 ~ 164 kpps Plastic ~ 154 kpps
CATS1 HV 670V I~0.12 ľA ; CATS2 HV 650V 0.10 ľA
Attachment 1: Run372_EDEMMCsIPID.png
Run372_EDEMMCsIPID.png
Attachment 2: Run372_BeamTracks.png
Run372_BeamTracks.png
Attachment 3: Run372_scalersAt13h42.png
Run372_scalersAt13h42.png
Attachment 4: Run373_DECorrelTof.png
Run373_DECorrelTof.png
Attachment 5: Run372_EChITOFCatsCaviar.png
Run372_EChITOFCatsCaviar.png
Attachment 6: Run372_TofCats.png
Run372_TofCats.png
Attachment 7: Run372_MMimpacts.png
Run372_MMimpacts.png
Attachment 8: scaler_2018-07-13_15h25m04s.png
scaler_2018-07-13_15h25m04s.png
Attachment 9: visu_2018-07-13_15h27m13s.png
visu_2018-07-13_15h27m13s.png
Attachment 10: visu_2018-07-13_15h27m15s.png
visu_2018-07-13_15h27m15s.png
Attachment 11: visu_2018-07-13_15h27m17s.png
visu_2018-07-13_15h27m17s.png
Attachment 12: visu_2018-07-13_15h27m20s.png
visu_2018-07-13_15h27m20s.png
Attachment 13: visu_2018-07-13_15h27m22s.png
visu_2018-07-13_15h27m22s.png
Attachment 14: visu_2018-07-13_15h27m25s.png
visu_2018-07-13_15h27m25s.png
Attachment 15: visu_2018-07-13_15h27m27s.png
visu_2018-07-13_15h27m27s.png
Attachment 16: visu_2018-07-13_15h27m30s.png
visu_2018-07-13_15h27m30s.png
Attachment 17: visu_2018-07-13_15h27m32s.png
visu_2018-07-13_15h27m32s.png
Attachment 18: visu_2018-07-13_15h27m34s.png
visu_2018-07-13_15h27m34s.png
Attachment 19: visu_2018-07-13_15h28m02s.png
visu_2018-07-13_15h28m02s.png
Attachment 20: visu_2018-07-13_15h28m06s.png
visu_2018-07-13_15h28m06s.png
Attachment 21: visu_2018-07-13_15h28m09s.png
visu_2018-07-13_15h28m09s.png
Attachment 22: visu_2018-07-13_15h28m15s.png
visu_2018-07-13_15h28m15s.png
Attachment 23: visu_2018-07-13_15h28m19s.png
visu_2018-07-13_15h28m19s.png
Attachment 24: visu_2018-07-13_15h28m24s.png
visu_2018-07-13_15h28m24s.png
Attachment 25: visu_2018-07-13_15h28m28s.png
visu_2018-07-13_15h28m28s.png
Attachment 26: visu_2018-07-13_15h28m34s.png
visu_2018-07-13_15h28m34s.png
Attachment 27: visu_2018-07-13_15h28m37s.png
visu_2018-07-13_15h28m37s.png
Attachment 28: visu_2018-07-13_15h28m40s.png
visu_2018-07-13_15h28m40s.png
Attachment 29: visu_2018-07-13_15h28m42s.png
visu_2018-07-13_15h28m42s.png
Attachment 30: visu_2018-07-13_15h28m45s.png
visu_2018-07-13_15h28m45s.png
Attachment 31: visu_2018-07-13_15h28m48s.png
visu_2018-07-13_15h28m48s.png
Attachment 32: visu_2018-07-13_15h28m51s.png
visu_2018-07-13_15h28m51s.png
Fixede738 Mon Jul 9 20:28:09 2018 Daisuke, Freddy, Louis, ValérieRUNGeneralCryo-LH2RUNS 318 to 320
From RUN 318 to RUN 320:
initial problem was that the stop process was not correctly taken into account on Narval. Geco acor was still running.
We killed Narval.
It was impossible to initialize or start run correctly.We did Several kna, kall.
Bugs on the run control server (ps -edf |grep narval or start_acq showed several on-going processes. We removed them). Then the CATS1 crate was not initialized correctly, it remained Offline.
see ProblemDAQcrateCATS1RCAt20h.png ProblemDAQcrateCATS1iolan.png
We rebooted (software mode on Iolan) CATS1 VXI crate, then init..;breakup...init then tried to start but stopped because because we noted merger problems.
See ProblemMergerCATSbranch.png
Then we needed to reinitialize a third time the Narval run control bto recover a correct Run control operation.

Fred S. came to check that we worked well... and that everything was working well.
Attachment 1: ProblemDAQcrateCATS1RCAt20h.png
ProblemDAQcrateCATS1RCAt20h.png
Attachment 2: ProblemDAQcrateCATS1iolan.png
ProblemDAQcrateCATS1iolan.png
Attachment 3: ProblemMergerCATSbranch.png
ProblemMergerCATSbranch.png

ELOG Home Page