MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 42 of 48  Not logged in MUST2
Fixed, e748, Thu Jul 6 01:26:15 2017, Franck et Valérian, CHIO, Hardware, N/A, UPDATE : CHIO's electronic scheme (valid from run 293) Schema_electronique_CHIO.pdf
Since Run 293 inspection line of NUMEXO 2 has been used as input signal of CAEN digitizer.
Fixed, e748, Wed Jun 7 18:03:02 2017, Franck, OTHER, Hardware, , LPC electronics 
Caen N568B: 509, 490
Ortec TAC: 1102, 1479, 1480, 1481
Lecroy GDG222: E2557, 01175C, 831
Fixed, e748, Mon Jul 3 19:43:16 2017, Franck, CHIO, Hardware, N/A, CHIO logic signals for TAC and CAEN digitizer 
STOP of CHIO CAEN digitizer = VAL AND Delayed CHIO (Delay = 700 ns). Before run 217, the CHIO was not delayed.
STOP of TAC PLASTval-CHIO = CHIO without delay. Before run 217 it was delayed CHIO.
Fixed, e755, Sun Jun 24 19:51:09 2018, Faďrouz, daisuke, MUST2, Software, N/A, MUST2 threshold from 1 MeV to 0.4 MeV das_2018-06-24_19h33m36s.pngdas_2018-06-24_19h49m33s.png
It was found that the energy threshold of the strips was as high as 1 MeV. This threshold setting was chosen for the calibration and was never set back
to the nominal threshold (0.4 MeV) for experiments.
Fixed, e744, Tue May 22 19:36:50 2018, Fairouz, Valérie, MUST2, Software, N/A, Run #359 Calimero T1-T4 strips X 8x
Run #359
amplitude of the gene is now set to 10 MeV
Time Calibrator Calimero stripsX  T1to T4 640ns period 20ns
Fixed, e744, Tue May 22 20:06:15 2018, Fairouz, Valerie, edited by Iulian Megumi, MUST2, Software, N/A, Run #360 Calimero T1-T4 strips Y Calimero_GMTproblem.png
Started run #360
calimero stripsYT T1 to T4 640 ns; period 20 ns
amplitude pulser 10 MeV
Fixed, e744, Tue May 22 13:40:03 2018, Fairouz Valerie, MUST2, Software, N/A, Run #356 Calimero T1-T4 strips Y 
Run #356 
Time Calibrator Calimero stripYT T1to T4 640ns period 20ns
Fixed, e744, Mon May 28 20:33:39 2018, E744- evening shift LISE+e744 teams (edit Iulan, Valérie), RUN, General, CH2, BEAM AGAIN RUN 2100 Tuning beam_spot_2100_end.png
  See plot of the Must2 impacts, Wien filter set at +/-0.8kV  
Beam on CATS 1.2 10**5 pps
CH2 183 µm
Fixed, e744, Mon May 28 20:38:21 2018, E744- evening shift LISE+MUST2 teams (edit Valérie), RUN, General, CH2, RUN 2101 DATA target 4 12x
[U][B]run #2101[/B][/U]
start @20h27
stop  @22h20
Fixed, e744, Mon May 28 16:32:38 2018, E744- Valérie, DAQ, General, N/A, DAS configuration files-References 15x
 
Fixed, e744, Mon May 28 18:27:45 2018, E744- Valérie, DAQ, General, N/A, High Voltages and intensities on MUST2 HT_MUST2withoutBeam28may18.png
 Check regularly the HT on the MUST2.
NB: without beam the current on Telescope 4 is high, between 9 and 11 µA. see snapshot.
NB: The Ioset was increased at 20 µA on Friday 25th (cf Id entry=490) to avoid trips on this telescope due to strong intensity fluctuations due to the
Fixed, e738, Wed Jul 11 20:00:01 2018, Didier, Valérie, Louis, RUN, General, Cryo-LH2, RUN 352 7x
Run 352

Start 19h57 Stop 21h51
Fixed, e738, Wed Jul 11 23:36:27 2018, Didier, Louis, Freddy, Shumpei, RUN, General, Cryo-LH2, RUN 354 scaler_2018-07-11_23h42m26s.pngvisu_2018-07-11_23h40m27s.pngvisu_2018-07-11_23h42m12s.pngvisu_2018-07-11_23h42m15s.pngvisu_2018-07-11_23h43m02s.png
Run 354

Start 23h33 Stop 1h37
Fixed, e738, Wed Jul 11 19:08:40 2018, Didier, Louis, RUN, General, Cryo-LH2, RUN 350 10x
Run 350

Start 19h00 Stop 19h11
Fixed, e738, Wed Jul 11 19:17:20 2018, Didier, Louis, RUN, General, Cryo-LH2, RUN 351 scaler_2018-07-11_19h20m33s.pngvisu_2018-07-11_19h21m57s.pngvisu_2018-07-11_19h22m00s.pngvisu_2018-07-11_19h22m58s.pngscaler_STOP_2018-07-11_19h57m00s.png
Run 351

Start 19h14 Stop 19h53
Fixed, e738, Wed Jul 11 13:24:34 2018, Daisuke,CATS team: Séb, Thom ; Franck, Pierre, Valérie, RUN, General, Cryo-LH2, Runs 344-345 12x
Wed 11 July 2018
run 344 start 12h43 ; stop 13h03
e748 Exxx 900M 11 juil. 13:03 /data/e748X/e755/acquisition/run/run_0344.dat.11-07-18_12h43m33s
Fixed, e755, Tue Jun 26 09:01:23 2018, Daisuke, Takeshi, Yorick, Valérie, RUN, General, Cryo-LH2, RUN 140 21x
Run 140 start: 8h55 ;  stop: 9h59
748 Exxx 3348489513 26 juin  09:59 /data/e748X/e755/acquisition/run/run_0140.dat.26-06-18_08h55m32s
 The Csi Mate were put on the trigger again "ENABLE" in the DAS. see snapshot DAS_MUVIenableMateCsI.png
Fixed, e738, Sun Jul 8 21:50:58 2018, Daisuke, Takeshi, Valérie, RUN, General, Cryo-LH2, RUN 297 15x
Run 297 start 21h51 (8th July)  stop at 0h (9th July)
e748 Exxx 3,0G  9 juil. 00:00 run_0297.dat.08-07-18_21h50m55s
MISSING STRIP, Y12 of CATS1 since run 296. see run297_CATSQRaw.png
Fixed, e738, Sun Jul 8 17:59:12 2018, Daisuke, Takeshi, Valérie, RUN, General, Cryo-LH2, RUN 295 26x
Run 295 start 17h52 stop at 19h52
Beam stop occurred during 19h39 and 19h42 (alarm at the machine)
Fixed, e738, Sun Jul 8 20:00:42 2018, Daisuke, Takeshi, Valérie, RUN, General, Cryo-LH2, RUN 296 +(on-line) eff of CATS 11x
Run 296 start 19h52 stop at 21h51

e748 Exxx 3,1G  8 juil. 21:51 run_0296.dat.08-07-18_19h52m46s

ELOG Home Page