Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e738 |
Sun Jul 8 17:36:47 2018 |
Daisuke, Didier, Valérie | RUN | General | Cryo-LH2 | RUN 294 |
Run 294 start 17h31 stop 17h50 due to the trip of CATS1.
748 Exxx 403M 8 juil. 17:50 run_0294.dat.08-07-18_17h31m47s
HV for CATS increased by 10V for Run 294
CATS1 HV = 650V I ~ 0.2 ľA ; CATS2 670V I ~ 0.14 ľA
Beam 10C around 10**5/s
Dead time between 6 and 13% |
Fixed | e738 |
Sun Jul 8 17:59:12 2018 |
Daisuke, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 295 |
Run 295 start 17h52 stop at 19h52
Beam stop occurred during 19h39 and 19h42 (alarm at the machine)
e748 Exxx 3,0G 8 juil. 19:53 run_0295.dat.08-07-18_17h52m05s
HV for CATS 1 put back at 640V. I ~ 0.12 to 0.14 ľA
CATS2 670V I ~ 0.12 ľA
Beam 10C around 10**5/s
Dead time between 6 and 13% |
Fixed | e738 |
Sun Jul 8 20:00:42 2018 |
Daisuke, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 296 +(on-line) eff of CATS |
Run 296 start 19h52 stop at 21h51
e748 Exxx 3,1G 8 juil. 21:51 run_0296.dat.08-07-18_19h52m46s
MISSING STRIP, Y12 of CATS1, during the run, see plots Run296_CATS_Qraw.png and Run296_CATS_Qcal.png.
CATS 1 640V I ~ 0.16 ľA
CATS2 670V I ~ 0.14 ľA
Beam 10C around 10**5/s
Dead time between 7 and 13%
Tests [V.lx) to be checked>>>] Online checkings of CATS efficiencies.
note that the Plast cannot be used directly for the control of CATS efficiencies in the online plots: Run296_plotPlastTcats.png
Plastics is counting nearly 65% more than CATS (cf Scalers +snapshot below zoomed on physical peaks). The Plastics also include secondary reactions and betas.
The correlation plots between the ionization chamber and the T_CATS_HF can be used, with suppression of the plot underflows. See plot examples.
In ICNumexo0_energy_Raw the integral is 8552. [Run296_ICenergyRawZoom.png]
The plot integrals are 7718 and 7841 for CATS1 and 2. [Run296_plotCorrelICCats.png]
The corresponding efficiencies are 90% and 92% for CATS1 and CATS2 (7718/8552 ~ 0.90 and 7841/8552 ~ 0.92) |
Pinned | e738 |
Sun Jul 8 21:05:50 2018 |
daisuke | OTHER | General | N/A | Phase space simulation: 10C(p,t)8C and 9C(p,d)8C |
|
Fixed | e738 |
Sun Jul 8 21:50:58 2018 |
Daisuke, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 297 |
Run 297 start 21h51 (8th July) stop at 0h (9th July)
e748 Exxx 3,0G 9 juil. 00:00 run_0297.dat.08-07-18_21h50m55s
MISSING STRIP, Y12 of CATS1 since run 296. see run297_CATSQRaw.png
CATS 1 640V I ~ 0.14 ľA
CATS2 670V I ~ 0.14 ľA
Beam 10C around 9. 10**4 and 10**5/s
Dead time between 7 and 13%
|
Fixed | e738 |
Mon Jul 9 00:03:24 2018 |
Benoit, Megumi, Takeshi, Valérie | RUN | General | Cryo-LH2 | RUN 298 |
Run 298 start 0h (9th July) stop at 02h02
e748 Exxx 2,9G 9 juil. 02:02 run_0298.dat.08-07-18_23h59m40s
Beam stop occurred from 01h06 to 01h09 (rotation speed failing of the LISE target)
MISSING STRIP, Y12 of CATS1 since run 296.
CATS 1 640V I ~ 0.14 ľA
CATS2 670V I ~ 0.14 ľA
Beam 10C around 8. 10**4 and 10**5/s
Dead time between 7 and 13% |
Fixed | e738 |
Mon Jul 9 00:25:30 2018 |
Nori | CATS | General | N/A | CATS tracking efficiency |
We noticed that the tracking efficiency was only 70% while the timing efficiencies were around 95%.
By lowering the thresholds (see Attachment 5-8) 89% tracking efficiency was achieved.
Note: analyzed run 293 (CATS1 640V, CATS2 670V), first 10000 events, only CATS trigger was selected. |
Fixed | e738 |
Mon Jul 9 02:16:19 2018 |
Benoit, Megumi | RUN | General | Cryo-LH2 | RUN 299 |
Run 299 start 02h01 (9th July) stop at 04h03
e748 Exxx 2,9G 9 juil. 04:03 run_0299.dat.09-07-18_02h01m29s
MISSING STRIP, Y12 of CATS1 since run 296.
CATS 1 640V I ~ 0.12 ľA
CATS2 670V I ~ 0.12 ľA
Beam 10C around 8. 10**4 and 10**5/s
Dead time between 7 and 13% |
Fixed | e738 |
Mon Jul 9 04:22:21 2018 |
Benoit, Megumi | RUN | General | Cryo-LH2 | RUN 300 |
Run 300 start 04h02 (9th July) stop at 06h04
e748 Exxx 2,8G 9 juil. 06:05 run_0300.dat.09-07-18_04h02m08s
MISSING STRIP, Y12 of CATS1 since run 296.
CATS 1 640V I ~ 0.12 ľA
CATS2 670V I ~ 0.12 ľA
Beam 10C around 8. 10**4 and 10**5/s
Dead time between 7 and 13% |
Fixed | e738 |
Mon Jul 9 06:21:54 2018 |
Benoit, Megumi | RUN | General | Cryo-LH2 | RUN 301 |
Run 301 start 06h04 (9th July) stop at 7h51
MISSING STRIP, Y12 of CATS1 since run 296.
CATS 1 640V I ~ 0.12 ľA
CATS2 670V I ~ 0.12 ľA
Beam 10C around 8. 10**4 and 10**5/s
Dead time between 7 and 13% |
Fixed | e738 |
Mon Jul 9 07:55:05 2018 |
Pierre | RUN | General | Cryo-LH2 | Run 302 |
start: 07h53
stop: 08h19
We stop the run to warm up the target |
Fixed | e738 |
Mon Jul 9 08:00:11 2018 |
takeshi | TARGET | Hardware | Cryo-LH2 | temperature log of the target |
Here are the temperature log of the cyo H2 target during the 10C setting. |
Fixed | e738 |
Mon Jul 9 08:55:13 2018 |
Pierre Daisuke | RUN | General | Empty | Run 303 |
start: 08h27
stop: 08h50
Run for background with no beam |
Fixed | e738 |
Mon Jul 9 08:56:50 2018 |
Pierre Daisuke | RUN | General | Cryo-empty | Run 304 |
start: 08h54
stop: 10h00
Run with same trigger but empty target
TRIGGER: MMi, CATS1DIV, CATS2DIV, PLASTIC% |
Fixed | e738 |
Mon Jul 9 15:43:50 2018 |
Pierre Valérie | RUN | General | Cryo-empty | Run 309 |
start: 15h36
stop: 16h10
Trigger: OR MM, CATS1 DIV and PLASTIC%
large beam interuption between 15h40 and 16h06 |
Fixed | e738 |
Mon Jul 9 17:18:55 2018 |
e748 | RUN | General | Cryo-empty | RUN 311 |
Run 311
Beam/Detectors Tuning
start: 17h04 stop: 17h16
Beam: 9C
target: empty
Trigger: T1 to T8, CATS1%, PLASTIC%
I=1.5*10⁵pps in CATS1
Purity = 6.3%
HV of plastic has been changed to 2100V |
Fixed | e738 |
Mon Jul 9 18:03:48 2018 |
Valérie Louis | RUN | General | Cryo-LH2 | RUN 312 |
Run 312
First RUN of 9C on filled LH2 target
start: 17h36 stop: 18h56
Beam: 9C
target: filled
Trigger: T1 to T8, CATS1%3*10⁴, CATS2%3*10⁴, PLASTIC%1*10⁴
I=1.4*10pps in CATS1
Purity = 5.1%
HV of DC wire has been changed from 500V to 530V
Plastic threshold has been changed from 180mV to 70mV
Target has been succefully filled |
Fixed | e738 |
Mon Jul 9 19:16:13 2018 |
Freddy Louis | RUN | General | Cryo-LH2 | RUN 313 to 316 |
From RUN 313 to RUN 316:
Tuning dor the Drift Chamber:
- threshold changed
- CFD discriminator has been tuned in GECO
- Buffer size has been change to match with the new setting
DC now works as well as th online visualisation
Acquisition is stable |
Fixed | e738 |
Mon Jul 9 19:24:06 2018 |
Freddy Valérie Louis | RUN | General | Cryo-LH2 | RUN 317 |
Run 317
start: 19h08 stop: 19h30
Beam: 9C
target: filled
Trigger: T1 to T8, CATS1%3*104, CATS2%3*10⁴;, PLASTIC%1*10⁴
I=1.8*10pps in CATS1
Purity = 5.1% |
Fixed | e738 |
Mon Jul 9 20:28:09 2018 |
Daisuke, Freddy, Louis, Valérie | RUN | General | Cryo-LH2 | RUNS 318 to 320 |
From RUN 318 to RUN 320:
initial problem was that the stop process was not correctly taken into account on Narval. Geco acor was still running.
We killed Narval.
It was impossible to initialize or start run correctly.We did Several kna, kall.
Bugs on the run control server (ps -edf |grep narval or start_acq showed several on-going processes. We removed them). Then the CATS1 crate was not initialized correctly, it remained Offline.
see ProblemDAQcrateCATS1RCAt20h.png ProblemDAQcrateCATS1iolan.png
We rebooted (software mode on Iolan) CATS1 VXI crate, then init..;breakup...init then tried to start but stopped because because we noted merger problems.
See ProblemMergerCATSbranch.png
Then we needed to reinitialize a third time the Narval run control bto recover a correct Run control operation.
Fred S. came to check that we worked well... and that everything was working well. |