Fixed, e755, Tue Jul 3 18:19:30 2018, daisuke, OTHER, General, N/A, Data saved after experiment 7x
|
DAS: /home/e748/ganacq_manip/e755/das-save/2018-07-03_fin_e755
VIGRU: /home/e748/analysis/GRU/GRU_18_03_12/vigru_e755_final_2018-07-03_18h15.xml
Online: /home/e748/analysis/nptool/Projects/e755/online/2018-07-03_18h24
|
Fixed, e755, Tue Jul 3 18:48:52 2018, takeshi, TARGET, Hardware, Cryo-LH2, temperature log of the target 
|
Here is the temperature log of the liquid hydrogen target,
We kept it about 6 days. |
Fixed, e755, Wed Jul 4 15:34:34 2018, Nori, BEAM, General, N/A, 37Ca PID at D6
|
A particle identification plot of 37Ca from LISE run 332. |
Pinned, e738, Wed Jul 4 17:10:28 2018, daisuke, DAQ, Software, N/A, Second VXI for CATS and syncrhonisation diagnosis 8x
|
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop
IOLAN).
|
Fixed, e738, Wed Jul 4 18:11:44 2018, louis, daisuke, RUN, General, 3-alpha, RUN 243   
|
MUST2 data taking with the 3 alpha source (positioned downstream of the target to shoot T1 to T8). |
Fixed, e738, Wed Jul 4 18:43:29 2018, daisuke, RUN, General, 3-alpha, RUN 244   
|
3 alpha source at 'off-beam-axis' position (right center view from upstream). FAG ~40 Hz (mostly from T1-4) |
Fixed, e738, Thu Jul 5 10:47:42 2018, louis, serge, pierre, daisuke, RUN, General, 3-alpha, RUn 245    
|
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment) |
Fixed, e738, Thu Jul 5 10:49:40 2018, louis, serge, pierre, daisuke, RUN, General, 3-alpha, RUn 245    
|
3 alpha source, off beam, low down position . FAG 40 Hz. Likely due to beta rays (see the attachment) |
Fixed, e738, Thu Jul 5 11:08:04 2018, pierre, louis daisuke, RUN, General, N/A, RUN 249 
|
cats 1 pulser calibration. trigger cats1%1 |
Fixed, e738, Thu Jul 5 14:12:18 2018, Louis, MUST2, General, 3-alpha, RUN 253 calib alpha    
|
|
Pinned, e738, Thu Jul 5 18:33:54 2018, gilles,fred,J-C,daisuke, DAQ, Hardware, N/A, Caviar DAQ merged.    
|
The VME crate of CAVIAR was integraded to the DAQ controlled by the GMT master of MUST2.
One caution. The visual scaler will not refresh if the TGV module of CAVIAR is listed in the configuration files
|
Fixed, e738, Thu Jul 5 19:22:18 2018, daisuke, RUN, General, 3-alpha, RUN 256   
|
3 alpha measurement after merging CAVIAR vme to the DAQ |
Pinned, e738, Thu Jul 5 19:26:31 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT   
|
|
Pinned, e738, Fri Jul 6 09:40:04 2018, daisuke, OTHER, General, N/A, kinematics plots  
|
|
Fixed, e738, Fri Jul 6 17:14:50 2018, daisuke, ONLINE, Software, N/A, Online analysis code: e755.detector  
|
The file e755.detector was updated to include the following parameters to ModularLeaf.
|
Fixed, e738, Fri Jul 6 18:43:39 2018, Nori, ONLINE, Software, N/A, Online analysis code: e755.detector
|
The modular label file has to be modified.
lpcgrit:/home/e748/analysis/nptool/Projects/e755 $ cat ModularLabel_new.txt
|
Fixed, e738, Sat Jul 7 08:16:50 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT   
|
|
Pinned, e738, Sat Jul 7 08:26:27 2018, Nori, BEAM, General, N/A, Beam production procedure
|
|
Pinned, e738, Sat Jul 7 08:29:53 2018, daisuke, OTHER, Social, N/A, Shift table
|
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251 |
Fixed, e738, Sat Jul 7 14:33:45 2018, shumpei takeshi megumi, TARGET, Hardware, Cryo-LH2, Liquid H2 status
|
We start liquifying H2 at 14:09 and seems to be filled at 14:29. |
Fixed, e738, Sat Jul 7 19:47:21 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT    
|
|
|