Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Text |
 |
Fixed | e748 |
Wed Jul 5 15:30:03 2017 |
Freddy | OFFLINE | General | | MUST2 offline analysis of run 323 | Here is a plot of the MUST2 PID for telescope
3:
- dE - TOF with a veto on CsI_ to remove |
|
Fixed | e748 |
Wed Jul 5 18:36:49 2017 |
Freddy | OFFLINE | General | | PID from NUMEXO merged (partially) | Here is the PID(dE Vs E) plot obained using
the IC energy from NUMEXO Vs the plastic
energy coded in our acquisition for the long |
|
Fixed | e748 |
Thu Jul 6 01:00:21 2017 |
Freddy | MUST2 | Hardware | N/A | Problem with position of télescopes 6&7 | Due to a cabling problem telescope 6 was seen
as telescope 7 and inversly. |
|
Pinned | e744 |
Wed May 23 17:23:34 2018 |
Freddy | MUST2 | General | | Pedestals and alpha calibration analysis | Calibration coefficients for MUST2 telescopes
were extracted from run_0118 (acquired during
night from 13th to 14th of May). They are |
|
Fixed | e755 |
Thu Jun 28 10:38:58 2018 |
Freddy | MUST2 | General | N/A | T4 Comparison of calibration runs | Attached is a comparison of two calibrations
performed before the experiment (2 weeks
and one day before) for Telescope 4 (the |
 |
Fixed | e755 |
Thu Jun 28 08:34:30 2018 |
Fredd, Louis, Daisuke | RUN | General | Cryo-LH2 | Run 170 | [U][B]Run 170[/B][/U][LIST]
[*] start: 8h07
[*] start:
|
    |
Fixed | e755 |
Sun Jun 24 13:25:30 2018 |
Fred, valérian, daisuke | DAQ | Software | N/A | Scalers to be recorded | The U2M scaler data cannot be recorded to
the data in the current version of Narval.
So there were no scaler data during the measurement |
|
Fixed | e744 |
Wed May 30 07:06:58 2018 |
François, Louis, Valérie | RUN | General | CH2 | Run 2116 | Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69.
STOP at 8h33 (beam rate decreasing at the |
  |
Fixed | e744 |
Tue May 29 17:14:41 2018 |
François, Freddy, Valérie | BEAM | General | | Beam back in D6 | At 17pm Tuesday 29th we have beam coming back
in D6. Run (without storage)
NB: The current on T4 (with Hv set 60V) is |
 |
Pending | e744 |
Mon May 28 16:14:29 2018 |
François & Valérie | MUST2 | General | N/A | Cooling system | Monday 28th 16h10: we refill the cooling
system for MUST2. The level should be ok
for the rest of the experiment.
|
|
Ongoing | e744 |
Thu May 3 08:50:17 2018 |
François | VACUUM | General | | stop vacuum | turbo pumps stopped at 8H45
problem with the cooling system of the M2C |
|
Fixed | e748 |
Mon May 14 10:49:47 2018 |
François | DAQ | Software | | TDC problem | Problem :
TDC labels are 0. After the compilation of
action list the labels seem to appear (if |
|
Fixed | e744 |
Mon May 14 13:52:25 2018 |
François | BEAM | General | | Profileur |
|
|
Ongoing | e744 |
Fri May 25 15:10:23 2018 |
François | CATS | Hardware | | delay on CATS | CATS delay 500 ns was changed to 300 ns, in
order to get the stop signal on MUST2 TAC
well within the range of the TAC. |
|
Fixed | e744 |
Fri May 25 15:29:51 2018 |
François | OTHER | Hardware | | tac FAG_HF | A delay of 500 ns was put to the start signal
= FAG of the FAG_HF_validated TAC
and a range of 500 ns selected |
|
Pending | e744 |
Sun May 27 15:36:31 2018 |
François | BEAM | Social | | News updated | 19H
They succeeded to get 90 % transmission with
CSS1 but the energy at the exit was changed |
|
Fixed | e738 |
Thu Jul 12 16:22:43 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 363 | RUN 363
start: 16h09 stop: 18h10
|
10x |
Fixed | e738 |
Thu Jul 12 18:12:33 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 364 | RUN 364
start: 18h11 stop: 20h45
|
12x |
Fixed | e738 |
Thu Jul 12 20:47:32 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 365 | RUN 365
start: 20h46 stop: 22h43
|
10x |
Fixed | e738 |
Thu Jul 12 22:45:50 2018 |
Frank, Louis | RUN | General | Cryo-LH2 | RUN 366 | RUN 366
start: 22h44 stop: 00h42
|
15x |