Fixede748 Wed Jul 5 15:30:03 2017 FreddyOFFLINEGeneral MUST2 offline analysis of run 323
Here is a plot of the MUST2 PID for telescope 3:
- dE - TOF with a veto on CsI_ to remove direct 12Be hitting the detector.
- dE - E ungated for a given crystal close to the beam axis

It concerns only 1 million events.
Attachment 1: PID_M2_run332.png
PID_M2_run332.png
Fixede748 Wed Jul 5 18:36:49 2017 FreddyOFFLINEGeneral PID from NUMEXO merged (partially)
Here is the PID(dE Vs E) plot obained using the IC energy from NUMEXO Vs the plastic energy coded in our acquisition for the long run of last night (323)

The resolution is indeed about 10% (estimated on the 12Be spot.

One can see another line around channel 185 in IC.

By looking at the merger code in more details, it seems obvious that we do not do the merge properly. Size of the file after the merge is much smaller than the input file and some event seems to be duplicated.
It has to be investigated and modified.
Attachment 1: DeE_CHIO_NUMEXO_run323.png
DeE_CHIO_NUMEXO_run323.png
Fixede748 Thu Jul 6 01:00:21 2017 FreddyMUST2HardwareN/AProblem with position of télescopes 6&7
Due to a cabling problem telescope 6 was seen as telescope 7 and inversly.
Attachment 1: Nouveau_document_2017-07-06.pdf
Nouveau_document_2017-07-06.pdf
Pinnede744 Wed May 23 17:23:34 2018 FreddyMUST2General Pedestals and alpha calibration analysis
Calibration coefficients for MUST2 telescopes were extracted from run_0118 (acquired during night from 13th to 14th of May). They are now located in the folder:

/home/e748/analysis/nptool/Projects/e744/Calibration/Energy/Calibration/Summary_run_0118

Based on the analysis of this run we realized that:
  • T4_StripX had pedestal normalization issue (for MATE 1,3,5,7) and alpha peaks were enlarged or doubled.
  • Pedestals used until today (23rd of May) were based on the pedestal measurement of the 28th of April !
Due to that, we remeasured the raw values of the pedestals today and compared them with the one used up to now.
The differences (in channels) between these two pedestal values for each telescope are plotted on the attached figure (X from 1-128 and Y after).
The drifts can be partially understood by the fact that the conditions evolved a lot during one month (cooling system temperature, etc).

For the online analysis, calibration of run_0118 (13/05) will be used but they somewhat lie in time between the two pedestal measurement (28/04 and 23/05).

However it is important right after the experiment to perform a new alpha calibration in conditions much closer to the measurement.
Attachment 1: Plot_DiffPedestals.png
Plot_DiffPedestals.png
Fixede755 Thu Jun 28 10:38:58 2018 FreddyMUST2GeneralN/AT4 Comparison of calibration runs
Attached is a comparison of two calibrations performed before the experiment (2 weeks and one day before) for Telescope 4 (the one having a degraded resolution in Ex on the offline).
One can see that:
  • The T4 resolution for strips X has been degraded between the two source runs.
  • The T4 resolution for strips Y remains ok and should be used for the analysis (slightly degraded only)
  • From the pedestal extrapolation, it also seems that there was a global drift for some channels.
Attachment 1: Comparison_T4X_calibbeforeexp.png
Comparison_T4X_calibbeforeexp.png
Attachment 2: Comparison_T4Y_calibbeforeexp.png
Comparison_T4Y_calibbeforeexp.png
Fixede755 Thu Jun 28 08:34:30 2018 Fredd, Louis, DaisukeRUNGeneralCryo-LH2Run 170
Run 170
  • start: 8h07
  • start:
  • T_CATS_HF back to normal. Problem for run before remains unidentified. There was no change at all from our side.
Attachment 1: Run170_TCATSHF.png
Run170_TCATSHF.png
Attachment 2: screenshot_2018-06-28_08h15m27s.png
screenshot_2018-06-28_08h15m27s.png
Attachment 3: Run170_Target.png
Run170_Target.png
Attachment 4: Run170_CATSRAWt.png
Run170_CATSRAWt.png
Attachment 5: Run171_M2Energy.png
Run171_M2Energy.png
Fixede755 Sun Jun 24 13:25:30 2018 Fred, valérian, daisukeDAQSoftwareN/AScalers to be recorded
The U2M scaler data cannot be recorded to the data in the current version of Narval. So there were no scaler data during the measurement of 40Ca.

To resolve the situation, we added register parameters for specified channels of U2M. This allows us to record the counts of a given channel at each event.

Here is the procedure by Fred
---
dans l'onglet Parametres de l'U2M, créer un "parametre sur registre" en choisissant le registre U2M_SCALERS et l'item correspondant à la voie désirée (item 0 pour la première voie, item 1 pour la deuxième voie...).

Sauver la config DAS (donc attention à ce qu'elle soit entièrement correcte, notamment pour les MUVI ...).

Ouvrir le fichier action, ajouter "READ/PARAM=nom_du_parametre"

Suaver le fichier action puis le compiler.

INIT dans le Run Control.

Relanceer le online.
---
Notes:
- the parameter name should be 15 characters or shorter. If not, the compilation will take forever.
- More registers, more dead time. So we included only CATS, CAVIAR, Plastic, DT and 100 Hz clock.
Attachment 1: run_0092_scaler_record_check.png
run_0092_scaler_record_check.png
Fixede744 Wed May 30 07:06:58 2018 François, Louis, ValérieRUNGeneralCH2Run 2116
Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69. STOP at 8h33 (beam rate decreasing at the end of the run due to machine problems).

Around 6-6h40 Leakage alarm problem was solved by Sébastien Le Moal (see last entry) and Qpoles were set again.

Wien filter +/-0.8 kV.

target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Night morning shift team: Louis, Valérie; François arriving at 7h just on time to apply the values of the Qpoles in D6 and to check the beam profile on PR62Gaz.
See LISE notebook for the printed beam profile. The plot of MM impacts looks good.

Beam intensity around 100k pps at 7h15.

cf current of T4 around 15 µA at 7h15.
Attachment 1: Run2116_initScalers.png
Run2116_initScalers.png
Attachment 2: HT_MUST2_Wed30May_At7h05.png
HT_MUST2_Wed30May_At7h05.png
Attachment 3: Run2116_MMimpacts_At7h23.png
Run2116_MMimpacts_At7h23.png
Fixede744 Tue May 29 17:14:41 2018 François, Freddy, ValérieBEAMGeneral Beam back in D6
At 17pm Tuesday 29th we have beam coming back in D6. Run (without storage)
NB: The current on T4 (with Hv set 60V) is fluctuating between 4 and 6.5 µA.
Attachment 1: HV_MUST2_29mayAt17h20.png
HV_MUST2_29mayAt17h20.png
Attachment 2: HV_EXL_29mayAt17h21.png
HV_EXL_29mayAt17h21.png
Pendinge744 Mon May 28 16:14:29 2018 François & ValérieMUST2GeneralN/ACooling system
Monday 28th 16h10: we refill the cooling system for MUST2. The level should be ok for the rest of the experiment.
(Around 4 days).
Ongoinge744 Thu May 3 08:50:17 2018 FrançoisVACUUMGeneral stop vacuum
turbo pumps stopped at 8H45

problem with the cooling system of the M2C chamber, the liquid was in the pipe but it was stopped, no flow, with a lot of "dusts" (vert de gris) => decision = we purge the pipes and the cooling system, once again !
Fixede748 Mon May 14 10:49:47 2018 FrançoisDAQSoftware TDC problem
Problem :
TDC labels are 0. After the compilation of action list the labels seem to appear (if I remember correctly), but after a save/reload of the config they are gone, and in all cases no event coded (on the oscilloscope a validation point is visible, but do not know what this means in the case of a TDC – even after looking in GANIL wiki related doc).


Solution :
Solved by Fred. He made "init" at the VME MUST2MASTER in the RCC.
Fixede744 Mon May 14 13:52:25 2018 FrançoisBEAMGeneral Profileur



Normalement, les profileurs devraient voir le faisceau.
En général, la fenêtre d’entrée est de 12µm de titane et il y a une plaque d’alu de 3mm en sortie.
Donc il y a une plaque d’arrêt sur le dernier profileur.
Mais même si c’est une feuille d’inox en sortie, le faisceau ne devrait pas sortir.
(Antony Dubois)
Attachment 1: Sans_titre.jpg
Sans_titre.jpg
Ongoinge744 Fri May 25 15:10:23 2018 FrançoisCATSHardware delay on CATS
CATS delay 500 ns was changed to 300 ns, in order to get the stop signal on MUST2 TAC well within the range of the TAC.
Fixede744 Fri May 25 15:29:51 2018 FrançoisOTHERHardware tac FAG_HF
A delay of 500 ns was put to the start signal = FAG of the FAG_HF_validated TAC
and a range of 500 ns selected
Pendinge744 Sun May 27 15:36:31 2018 FrançoisBEAMSocial News updated
19H
They succeeded to get 90 % transmission with CSS1 but the energy at the exit was changed by 4%, that is not compatible with the CSS2 limit of 1 %. After fitting the CSS1 energy they obtained 70-80 % transmission only, but it is enough. The problem with the HF of CSS2 was solved. They are trying to accelerate with CSS2. They are now at midway inside CSS2. They still need several hours to finish the work.


15H
The problem with CSS1 is not yet solved. They want 90% transmission of the beam in CSS1, they have 75%.
There is another problem, the HF of CSS2 has dysfonctionnements.
They don't expect beam before 20H.
Fixede738 Thu Jul 12 16:22:43 2018 Frank, LouisRUNGeneralCryo-LH2RUN 363
RUN 363

start: 16h09 stop: 18h10
12C primary I : between 1.7 and 1.8 uA
CATS1: 194 kHz ; CATS2: 170 kHz
Plast : 170 kHz
FAG ~ 650/s

CATS1 670 V I ~ 0.12 µA ; CATS2 650V I ~ 0.10V sometimes up Ovc to 0.38 µA but rather stable.
Attachment 1: Run363_scalersAt16h19.png
Run363_scalersAt16h19.png
Attachment 2: visu_2018-07-12_16h42m27s.png
visu_2018-07-12_16h42m27s.png
Attachment 3: visu_2018-07-12_16h42m31s.png
visu_2018-07-12_16h42m31s.png
Attachment 4: visu_2018-07-12_16h42m36s.png
visu_2018-07-12_16h42m36s.png
Attachment 5: visu_2018-07-12_16h53m56s.png
visu_2018-07-12_16h53m56s.png
Attachment 6: visu_2018-07-12_16h54m06s.png
visu_2018-07-12_16h54m06s.png
Attachment 7: visu_2018-07-12_16h54m13s.png
visu_2018-07-12_16h54m13s.png
Attachment 8: scaler_2018-07-12_17h32m17s.png
scaler_2018-07-12_17h32m17s.png
Attachment 9: screenshot_2018-07-12_17h32m25s.png
screenshot_2018-07-12_17h32m25s.png
Attachment 10: scaler_STOP_2018-07-12_18h11m25s.png
scaler_STOP_2018-07-12_18h11m25s.png
Fixede738 Thu Jul 12 18:12:33 2018 Frank, LouisRUNGeneralCryo-LH2RUN 364
RUN 364

start: 18h11 stop: 20h45

12C primary I : 1.8 uA
CATS1: 215 kHz ; CATS2: 171 kHz
Plast : 190 kHz
FAG ~ 730/s

CATS1 670 V I ~ 0.14 µA ; CATS2 650V I ~ 0.10V
Attachment 1: scaler_2018-07-12_18h14m17s.png
scaler_2018-07-12_18h14m17s.png
Attachment 2: visu_2018-07-12_18h33m37s.png
visu_2018-07-12_18h33m37s.png
Attachment 3: visu_2018-07-12_18h33m48s.png
visu_2018-07-12_18h33m48s.png
Attachment 4: visu_2018-07-12_18h34m00s.png
visu_2018-07-12_18h34m00s.png
Attachment 5: visu_2018-07-12_18h34m40s.png
visu_2018-07-12_18h34m40s.png
Attachment 6: visu_2018-07-12_18h35m46s.png
visu_2018-07-12_18h35m46s.png
Attachment 7: visu_2018-07-12_18h36m22s.png
visu_2018-07-12_18h36m22s.png
Attachment 8: visu_2018-07-12_18h38m33s.png
visu_2018-07-12_18h38m33s.png
Attachment 9: visu_2018-07-12_20h43m43s.png
visu_2018-07-12_20h43m43s.png
Attachment 10: visu_2018-07-12_20h43m32s.png
visu_2018-07-12_20h43m32s.png
Attachment 11: scaler_2018-07-12_20h43m31s.png
scaler_2018-07-12_20h43m31s.png
Attachment 12: scaler_STOP_2018-07-12_20h45m36s.png
scaler_STOP_2018-07-12_20h45m36s.png
Fixede738 Thu Jul 12 20:47:32 2018 Frank, LouisRUNGeneralCryo-LH2RUN 365
RUN 365

start: 20h46 stop: 22h43

12C primary I : 1.8 uA
CATS1: 200 kHz ; CATS2: 185 kHz
Plast : 177 kHz
FAG ~ 755/s

CATS1 670 V I ~ 0.14 µA ; CATS2 650V I ~ 0.10V
Attachment 1: scaler_2018-07-12_20h49m56s.png
scaler_2018-07-12_20h49m56s.png
Attachment 2: visu_2018-07-12_21h13m38s.png
visu_2018-07-12_21h13m38s.png
Attachment 3: visu_2018-07-12_21h13m45s.png
visu_2018-07-12_21h13m45s.png
Attachment 4: visu_2018-07-12_21h14m15s.png
visu_2018-07-12_21h14m15s.png
Attachment 5: visu_2018-07-12_21h14m30s.png
visu_2018-07-12_21h14m30s.png
Attachment 6: visu_2018-07-12_21h15m44s.png
visu_2018-07-12_21h15m44s.png
Attachment 7: visu_2018-07-12_21h16m05s.png
visu_2018-07-12_21h16m05s.png
Attachment 8: visu_2018-07-12_21h17m18s.png
visu_2018-07-12_21h17m18s.png
Attachment 9: visu_2018-07-12_21h18m39s.png
visu_2018-07-12_21h18m39s.png
Attachment 10: scaler_2018-07-12_22h43m32s.png
scaler_2018-07-12_22h43m32s.png
Fixede738 Thu Jul 12 22:45:50 2018 Frank, LouisRUNGeneralCryo-LH2RUN 366
RUN 366

start: 22h44 stop: 00h42

12C primary I : 1.8 uA
CATS1: 200 kHz ; CATS2: 185 kHz
Plast : 177 kHz
FAG ~ 755/s

CATS1 670 V I ~ 0.14 µA ; CATS2 650V I ~ 0.10V
Attachment 1: scaler_2018-07-12_23h02m30s.png
scaler_2018-07-12_23h02m30s.png
Attachment 2: screenshot_2018-07-12_23h08m36s.png
screenshot_2018-07-12_23h08m36s.png
Attachment 3: visu_2018-07-12_23h02m37s.png
visu_2018-07-12_23h02m37s.png
Attachment 4: visu_2018-07-12_23h07m33s.png
visu_2018-07-12_23h07m33s.png
Attachment 5: visu_2018-07-12_23h07m37s.png
visu_2018-07-12_23h07m37s.png
Attachment 6: visu_2018-07-12_23h07m40s.png
visu_2018-07-12_23h07m40s.png
Attachment 7: visu_2018-07-12_23h07m43s.png
visu_2018-07-12_23h07m43s.png
Attachment 8: visu_2018-07-12_23h07m52s.png
visu_2018-07-12_23h07m52s.png
Attachment 9: visu_2018-07-12_23h07m56s.png
visu_2018-07-12_23h07m56s.png
Attachment 10: visu_2018-07-12_23h08m00s.png
visu_2018-07-12_23h08m00s.png
Attachment 11: visu_2018-07-12_23h08m06s.png
visu_2018-07-12_23h08m06s.png
Attachment 12: visu_2018-07-12_23h08m13s.png
visu_2018-07-12_23h08m13s.png
Attachment 13: visu_2018-07-12_23h08m18s.png
visu_2018-07-12_23h08m18s.png
Attachment 14: visu_2018-07-12_23h08m22s.png
visu_2018-07-12_23h08m22s.png
Attachment 15: visu_2018-07-12_23h08m30s.png
visu_2018-07-12_23h08m30s.png