MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 40 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject Text Attachments
Fixede748 Wed Jul 5 15:30:03 2017 FreddyOFFLINEGeneral MUST2 offline analysis of run 323Here is a plot of the MUST2 PID for telescope
3:
- dE - TOF with a veto on CsI_ to remove
 PID_M2_run332.png 
Fixede748 Wed Jul 5 18:36:49 2017 FreddyOFFLINEGeneral PID from NUMEXO merged (partially)Here is the PID(dE Vs E)  plot obained using
the IC energy from NUMEXO Vs the plastic
energy coded in our acquisition for the long
 DeE_CHIO_NUMEXO_run323.png 
Fixede748 Thu Jul 6 01:00:21 2017 FreddyMUST2HardwareN/AProblem with position of télescopes 6&7Due to a cabling problem telescope 6 was seen
as telescope 7 and inversly.
 Nouveau_document_2017-07-06.pdf 
Pinnede744 Wed May 23 17:23:34 2018 FreddyMUST2General Pedestals and alpha calibration analysisCalibration coefficients for MUST2 telescopes
were extracted from run_0118 (acquired during
night from 13th to 14th of May). They are
 Plot_DiffPedestals.png 
Fixede755 Thu Jun 28 10:38:58 2018 FreddyMUST2GeneralN/AT4 Comparison of calibration runsAttached is a comparison of two calibrations
performed before the experiment (2 weeks
and one day before) for Telescope 4 (the
 Comparison_T4X_calibbeforeexp.pngComparison_T4Y_calibbeforeexp.png 
Fixede755 Thu Jun 28 08:34:30 2018 Fredd, Louis, DaisukeRUNGeneralCryo-LH2Run 170[U][B]Run 170[/B][/U][LIST]
[*] start: 8h07
[*] start: 
 Run170_TCATSHF.pngscreenshot_2018-06-28_08h15m27s.pngRun170_Target.pngRun170_CATSRAWt.pngRun171_M2Energy.png 
Fixede755 Sun Jun 24 13:25:30 2018 Fred, valérian, daisukeDAQSoftwareN/AScalers to be recordedThe U2M scaler data cannot be recorded to
the data in the current version of Narval.
So there were no scaler data during the measurement
 run_0092_scaler_record_check.png 
Fixede744 Wed May 30 07:06:58 2018 François, Louis, ValérieRUNGeneralCH2Run 2116Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69.
STOP at 8h33 (beam rate decreasing at the
 Run2116_initScalers.pngHT_MUST2_Wed30May_At7h05.pngRun2116_MMimpacts_At7h23.png 
Fixede744 Tue May 29 17:14:41 2018 François, Freddy, ValérieBEAMGeneral Beam back in D6At 17pm Tuesday 29th we have beam coming back
in D6. Run (without storage)
NB: The current on T4 (with Hv set 60V) is
 HV_MUST2_29mayAt17h20.pngHV_EXL_29mayAt17h21.png 
Pendinge744 Mon May 28 16:14:29 2018 François & ValérieMUST2GeneralN/ACooling system Monday 28th 16h10: we refill the cooling
system for MUST2. The level should be ok
for the rest of the experiment.
  
Ongoinge744 Thu May 3 08:50:17 2018 FrançoisVACUUMGeneral stop vacuumturbo pumps stopped at 8H45

problem with the cooling system of the M2C
  
Fixede748 Mon May 14 10:49:47 2018 FrançoisDAQSoftware TDC problemProblem :
TDC labels are 0. After the compilation of
action list the labels seem to appear (if
  
Fixede744 Mon May 14 13:52:25 2018 FrançoisBEAMGeneral Profileur

 Sans_titre.jpg 
Ongoinge744 Fri May 25 15:10:23 2018 FrançoisCATSHardware delay on CATSCATS delay 500 ns was changed to 300 ns, in
order to get the stop signal on MUST2 TAC
well within the range of the TAC. 
  
Fixede744 Fri May 25 15:29:51 2018 FrançoisOTHERHardware tac FAG_HFA delay of 500 ns was put to the start signal
= FAG of the FAG_HF_validated TAC
and a range of 500 ns selected
  
Pendinge744 Sun May 27 15:36:31 2018 FrançoisBEAMSocial News updated19H
They succeeded to get 90 % transmission with
CSS1 but the energy at the exit was changed
  
Fixede738 Thu Jul 12 16:22:43 2018 Frank, LouisRUNGeneralCryo-LH2RUN 363RUN 363
 
start: 16h09  stop: 18h10
 10x 
Fixede738 Thu Jul 12 18:12:33 2018 Frank, LouisRUNGeneralCryo-LH2RUN 364RUN 364
 
start: 18h11  stop: 20h45
 12x 
Fixede738 Thu Jul 12 20:47:32 2018 Frank, LouisRUNGeneralCryo-LH2RUN 365RUN 365
 
start: 20h46  stop: 22h43
 10x 
Fixede738 Thu Jul 12 22:45:50 2018 Frank, LouisRUNGeneralCryo-LH2RUN 366RUN 366
 
start: 22h44  stop: 00h42
 15x 

ELOG Home Page