Fixed, e744, Wed May 16 19:06:39 2018, Iulian Valerian, MUST2, Software, N/A, run #318 Calimero T1-T4 strips X Calimerro_run318.pngCalimerro_T4_X_strip2_run319.pngCalimerro_T2_X_strip12_run319.png
[U][B]Run #318[/B][/U]

Calimero T1-T4 X
Fixed, e744, Wed May 16 20:26:48 2018, Iulian Valerian, MUST2, Software, N/A, run #319 calimero T1-T4 Y strips  Calimerro_run319.png
[U][B]run #319[/B][/U] 
calimero T1-T4 Y strips 
Fixed, e744, Wed May 16 20:36:40 2018, Iulian Valerian, MUST2, Software, N/A, run #320 Calimero T5 X Calimerro_run320.png
[U][B]run #320[/B][/U] 

Calimero T5 X
Fixed, e744, Wed May 16 20:42:43 2018, Iulian Valerian, MUST2, Software, N/A, Run #321 Calimero T5 Y strips  Calimerro_run321.png
[U][B]Run #321[/B][/U] 

Calimero T5 Y strips 
Ongoing, e744, Wed May 16 21:27:55 2018, Iulian Valerian, MUST2, Software, N/A, Run #322 Calimero T1-T4 X strips Calimerro_run322.png
Run #322 
Calimero T1-T4 X strips
 1 channel per mate not done (Valerian too slow to cable start stop ;) )
Ongoing, e744, Sat May 19 15:32:51 2018, Iulian Valerian, EXL-PPT, General, N/A, Started run #346 Room background PPT EXL 
[U][B]run #346[/B][/U]

Room background PPT EXL
Ongoing, e744, Wed May 23 20:52:01 2018, Iulian Valerian, RUN, General, , run #429 and #430 and config gmt config_gmt.pngconfig_gmtslave.pngrun430_E_PPT_vs_T_PPT.pdfrun430_E_PPT_proj.pdfrun430_E_EXL_vs_T_EXLor.pdf
Changed VAL from 2 us to 2.5 us

run #429 exl ppt triggers
Fixed, e744, Thu May 24 01:11:26 2018, Iulian Valerian, RUN, General, N/A, run 434 Lise trigger ED4_TCATSHF_23-05-18_1-18.pngED4_TCATSHF_23-05-18_1-18_efficiency.png
Cats inserted

efficiency is around ~99%
Ongoing, e744, Tue May 29 15:53:17 2018, Iulian Maurycy, OFFLINE, General, CH2, Angular distribution per telescope 1-4 ang_dist.pdf
Angular distribution per telescope 1-4
Fixed, e744, Wed May 2 18:11:59 2018, Iulian Marlenne Louis, RUN, General, 3-alpha, 3 alpha test run_191.png
Run191 start 18h stop 18h10 
Run ok, saved config DAS with good polarity on the thresholds CSI & piedestal allignement on MM1-MM5
Fixed, e744, Thu May 3 15:04:03 2018, Iulian Marlenne, MUST2, Hardware, N/A, X and Y possitions on the detector 
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Fixed, e744, Thu May 3 15:20:16 2018, Iulian Marlenne, MUST2, Hardware, N/A, X and Y possitions on the detector 
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Ongoing, e744, Sat May 5 11:14:33 2018, Iulian & Valerian, RUN, General, 3-alpha, run #204 alpha source BT_tripped_T5.pngT5_das_no_cooling.pngT5_das_no_cooling2.pngT5_vigru_no_cooling.png20180506_152338.jpg
[U][B]run #204[/B][/U]
alpha source
start @11h15 05/05
Ongoing, e744, Thu May 17 19:15:21 2018, Iulian , EXL-PPT, General, 60Co, Run #334 Last 60 co run for eficacity before experiment 
[U][B]Run #334[/B][/U]

start 19h15
Fixed, e744, Sat May 26 14:03:27 2018, Giuseppe, Dieter, J. Eric, RUN, General, CH2, Run 2020 9x
run 2020

Fixed, e744, Sat May 26 09:33:48 2018, Giuseppe, Dieter, RUN, General, CH2, run 2015 MUST2_end_run2016.pngScalers_stop_run2015.pngMUST2_y_ongoing_run2018.png
Missing strips:
x
MM1 1
Fixed, e744, Sat May 26 10:03:37 2018, Giuseppe, Dieter, RUN, General, , run 2016& 2017 


Problems with the ACQ (merger), they were solved by making Breakup and Init
Ongoing, e744, Sat May 26 10:06:06 2018, Giuseppe, Dieter, RUN, General, CH2, Run 2018 Scalers_start_run2018.pngScalers_stop_run2018.pngMM_IMPACT_stop_run2018.png
Run 2018 
Start @ 09:56 26/05/2018
Stop @ 10:51
Fixed, e744, Sat May 26 11:19:37 2018, Giuseppe, Dieter, RUN, General, CH2, interruption due to to waterleak ibn CSS1 
10:50 h Water leak at CSS1
        cryo pumps have to be regenerated
        continuation until the expert intervention starts is possible
Fixed, e744, Sat May 26 11:42:03 2018, Giuseppe, Dieter, RUN, General, CH2, run 2019 scalers_start_run2019.pngscalers_stop_run2019.png
Run 2019