Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e744 |
Wed May 16 19:06:39 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #318 Calimero T1-T4 strips X |
Run #318
Calimero T1-T4 X |
Fixed | e744 |
Wed May 16 20:26:48 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #319 calimero T1-T4 Y strips |
run #319
calimero T1-T4 Y strips |
Fixed | e744 |
Wed May 16 20:36:40 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #320 Calimero T5 X |
run #320
Calimero T5 X |
Fixed | e744 |
Wed May 16 20:42:43 2018 |
Iulian Valerian | MUST2 | Software | N/A | Run #321 Calimero T5 Y strips |
Run #321
Calimero T5 Y strips |
Ongoing | e744 |
Wed May 16 21:27:55 2018 |
Iulian Valerian | MUST2 | Software | N/A | Run #322 Calimero T1-T4 X strips |
Run #322
Calimero T1-T4 X strips
1 channel per mate not done (Valerian too slow to cable start stop ) |
Ongoing | e744 |
Sat May 19 15:32:51 2018 |
Iulian Valerian | EXL-PPT | General | N/A | Started run #346 Room background PPT EXL |
run #346
Room background PPT EXL
start 15h32 19 Mai
stop 18h52 20 Mai |
Ongoing | e744 |
Wed May 23 20:52:01 2018 |
Iulian Valerian | RUN | General | | run #429 and #430 and config gmt |
Changed VAL from 2 us to 2.5 us
run #429 exl ppt triggers
run #430 exl ppt triggers. Changed val on gmtslave also
The correlation between MUST and PPT (run430_E_PPT_vs_T_PPT.pdf) is due to the beta decay of 138La (internal contamination in the LaBr crystal). PPT detects the beta energy with 100% eff, while the gamma rays - emitted in the beta decay process- interacted in MUST detectors. The EXL bidim shows only random events (no internal contamination). |
Fixed | e744 |
Thu May 24 01:11:26 2018 |
Iulian Valerian | RUN | General | N/A | run 434 Lise trigger |
Cats inserted
efficiency is around ~99% |
Ongoing | e744 |
Tue May 29 15:53:17 2018 |
Iulian Maurycy | OFFLINE | General | CH2 | Angular distribution per telescope 1-4 |
Angular distribution per telescope 1-4 |
Fixed | e744 |
Wed May 2 18:11:59 2018 |
Iulian Marlenne Louis | RUN | General | 3-alpha | 3 alpha test |
Run191 start 18h stop 18h10
Run ok, saved config DAS with good polarity on the thresholds CSI & piedestal allignement on MM1-MM5 |
Fixed | e744 |
Thu May 3 15:04:03 2018 |
Iulian Marlenne | MUST2 | Hardware | N/A | X and Y possitions on the detector |
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Telescope 4 : PCB 11 (ref on pcb: n°2834-9)
Telescope 5 : PCB 2 (ref on pcb: X2489-8) Placed in the 0° chamber
Telescope 6 : PCB 6 placed at 180° compared with the beam direction
------------------------ ------------------------
X1/Y1 X2 / \ Y2 Y1/X1
Y2 / \ X2
4 / \ 1
/ \
/ \
/ \
/ \
----------------- -----------------
----------------- x -----------------
\ BEAM /
\ /
\ /
3 \ / 2
\ /
X2 \ / Y2
X1/Y1 Y2 \ / X2 X1/Y1
------------------------ ------------------------
----------------------
| |
| | Detector 5
| |
| |
| x |
| Beam |
| Y3 |
| Y2 |
| X2 X1/Y1 |
---------------------- |
Fixed | e744 |
Thu May 3 15:20:16 2018 |
Iulian Marlenne | MUST2 | Hardware | N/A | X and Y possitions on the detector |
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Telescope 4 : PCB 11 (ref on pcb: n°2834-9)
Telescope 5 : PCB 2 (ref on pcb: X2489-8) Placed in the 0° chamber
Telescope 6 : PCB 6 placed at 180° compared with the beam direction
------------------------ ------------------------
X1/Y1 X2 / \ Y2 Y1/X1
Y2 / \ X2
4 / \ 1
/ \
/ \
/ \
/ \
----------------- -----------------
----------------- x -----------------
\ BEAM /
\ /
\ /
3 \ / 2
\ /
X2 \ / Y2
X1/Y1 Y2 \ / X2 X1/Y1
------------------------ ------------------------
----------------------
| |
| | Detector 5
| |
| |
| x |
| Beam |
| Y3 |
| Y2 |
| X2 X1/Y1 |
---------------------- |
Ongoing | e744 |
Sat May 5 11:14:33 2018 |
Iulian & Valerian | RUN | General | 3-alpha | run #204 alpha source |
run #204
alpha source
start @11h15 05/05
stop @15h16 06/05
Cooling stopped on T5, the cooling system was beeping with a LLL error, I started it again but it stopped with this error again... I stopped the BT and HT on T5.
One of the BT was tripping. I looked at the DAS, but the temperature seemed Ok... but I have no idea if they reflect well the reality...
I join to this entry screenshots :
- the CAEN 1527 terminal
- the das of MUVI2 channel 1 X&Y
- the vigru screen updated
- The LLL error
After calling Francois and Laurent Menager, I refilled it with alcool from the blue containers. It seemed to be working again. |
Ongoing | e744 |
Thu May 17 19:15:21 2018 |
Iulian | EXL-PPT | General | 60Co | Run #334 Last 60 co run for eficacity before experiment |
Run #334
start 19h15 |
Fixed | e744 |
Sat May 26 14:03:27 2018 |
Giuseppe, Dieter, J. Eric | RUN | General | CH2 | Run 2020 |
run 2020
start@ 14:02 26/05/2018
stop @ 15:20 26/05/2018
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3 |
Fixed | e744 |
Sat May 26 09:33:48 2018 |
Giuseppe, Dieter | RUN | General | CH2 | run 2015 |
Missing strips:
x
MM1 1
MM2 6
MM3 0
MM4 2
MM5 0
y:
MM1 3
MM2 1
MM3 0
MM4 7
MM5 3
 |
Fixed | e744 |
Sat May 26 10:03:37 2018 |
Giuseppe, Dieter | RUN | General | | run 2016& 2017 |
Problems with the ACQ (merger), they were solved by making Breakup and Init
run2016 start@9:45 stop @9:47 (bad run)
run2017 start@9:48 stop @9:49 (bad run) |
Ongoing | e744 |
Sat May 26 10:06:06 2018 |
Giuseppe, Dieter | RUN | General | CH2 | Run 2018 |
Run 2018
Start @ 09:56 26/05/2018
Stop @ 10:51 |
Fixed | e744 |
Sat May 26 11:19:37 2018 |
Giuseppe, Dieter | RUN | General | CH2 | interruption due to to waterleak ibn CSS1 |
10:50 h Water leak at CSS1
cryo pumps have to be regenerated
continuation until the expert intervention starts is possible
presently waiting for resubmission of the beam
11:40 h started new run (run2019 - see next entry)
11:43 h another leak occurred and it was decided to stop the beam, data taking continues |
Fixed | e744 |
Sat May 26 11:42:03 2018 |
Giuseppe, Dieter | RUN | General | CH2 | run 2019 |
Run 2019
start@ 11:40 26/05/2018
stop @ 11:52
the beam intensity dropped to 22 pps so we stopped |