MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 36 of 48  Not logged in MUST2
Ongoing, e738, Wed Jul 11 17:25:11 2018, Louis, Daisuke, Nori, Valérie, RUN, General, Cryo-LH2, Run 348 run348_scalersAt17h26.pngvisu_2018-07-11_17h39m20s.pngvisu_2018-07-11_17h39m25s.pngscaler_STOP_2018-07-11_18h09m53s.png
Run 348 Start 17h17

Beam: 9C at 2.3*10⁵pps in CATS1, 2uA of intensity of the primary beam
Fixed, e755, Mon Jul 2 23:29:32 2018, Louis Pierre, OTHER, Hardware, N/A, New division for CATS and plastic 
Division for CATS and Plastic: 3x10^4

Plastic => Chanel 16 of GMT
Fixed, e755, Thu Jun 7 09:46:47 2018, Louis, MUST2, Hardware, 3-alpha, MUST2 test MMYE1_4_3alpha_06062022.pngMMYE1_4_3alpha_06062021.pngMMYE1_4_3alpha_06062020.pngMMYE1_4_3alpha_06062019.png
The 8 MUST2 telescopes have been installed and pluged in final configuration. Energy signal have been tested with 2 3-alphas sources, one in front of T5-T6
and one in front of the others. 
Energy signal for all telescopes looks ok exept for telescopes 5. Concidering their position with respect to the source T5 and T6 should have the same
Fixed, e755, Thu Jun 7 12:19:18 2018, Louis, MUST2, Hardware, N/A, MUST2 configuration, X1Y1 and PCB numbers  Config_MUST2.jpgConfig_MUST2_T56.jpg
Pictures showing the MUST2 configuration. 
X and Y positions and PCB numbers are as folow are as follow: 
Fixed, e755, Thu Jun 7 13:54:59 2018, Louis, MUST2, Hardware, N/A, MUST2 Time MMXT1_4_07062018.pngMMYT1_4_07062018.pngMMYT5_8_07062018.pngMMXT5_8_07062018.png
MUST2 time have been tested for T1 to T8 for X and Y. FAG has been delayed with 150ns and 500ns and sent as stop in MUVI 1 and 2. One can see two pics in
all spectrum. All scales of TAC have been setted to 600ns.
Fixed, e755, Thu Jun 7 17:12:38 2018, Louis, MUST2, Hardware, 3-alpha, Calib Alpha MMYE1_4_08062020.pngMMYE5_8_08062020.pngMMXE1_4_08062019.pngMMXE5_8_08062019.png
Run 3028: Calib 3 alpha started at 17h05
Run3029:Calib 3 alpha started at 17h54
Fixed, e755, Sun Jun 10 19:51:52 2018, Louis, MUST2, Hardware, 3-alpha, Calibration run MMYE1_4_11062020.pngMMYE5_8_11062020.pngMMXE1_4_11062020.pngMMXE5_8_projection_11062020.png
Run3031:Calib 3 alpha started at 19h49
stoped at 9h15
Fixed, e755, Mon Jun 11 12:50:56 2018, Louis, MUST2, Hardware, 3-alpha, Impact matrix 8x
Impact matrix for Telescope 1 to 8 from the run 3029 calibrated
Fixed, e755, Mon Jun 11 13:28:21 2018, Louis, ONLINE, Hardware, 3-alpha, Energy resolution MUST2 
Energy resolution of the 8 MUST2 telescopes from central pic of run 3029 calibrated with 3 alpha source.

T1: mean = 5.389MeV  ,  sigma = 15.0keV
Fixed, e755, Sat Jun 23 01:55:34 2018, Louis, BEAM, General, CH2, Beam tunning  beam_tunnig23_06_1h_24m.png
Beam was tunned around 1am to center the beam on the target. On the picture, up is after tunning and down is before tunning
Fixed, e755, Sat Jun 23 04:16:03 2018, Louis, OFFLINE, General, CH2, deltaE E dEE_noCalib_run0063.jpg
here a plot of energy loss in DSSD in function of energy in CsI. One can distinguish proton and alpha. Energy calibration of the CsI is needed to identify
clearly the tritons
, e755, Sat Jun 23 06:16:25 2018, Louis, OFFLINE, , ,  
 
Fixed, e755, Tue Jun 26 13:37:44 2018, Louis, RUN, General, Cryo-LH2, RUN 145 run_145_CATScal.pngrun_145_CATSpos.pngrun_145_scalers.png
Run 145 -- 26th June start@ 13h07 ; stop @ 13h53
e748 Exxx 2239017281 26 juin  13:53 /data/e748X/e755/acquisition/run/run_0145.dat.26-06-18_13h06m30s
Trigger: all MM + CATS DIV
Fixed, e755, Thu Jun 28 08:29:08 2018, Louis, CATS, General, Cryo-LH2, CATS-HF time shift during the night  6x
noticed that the time between CATS and HF shifted during the night.
run 164 to 169
Fixed, e755, Fri Jun 29 00:59:15 2018, Louis, OFFLINE, General, Cryo-LH2, Analysis of run 63 to 89 in 40Ca(p,t)38ca reaction Chek_cuts_40Capt.pngKinematics_40Ca.pngTelescope_Ex_40Capt.pngKinematics_38Capt_withoutCutZero.png
Here are some plot summarizing the analysis status on the [B]40Ca(p,t)38Ca[/B] channel.

Run concerned: 63-89 
Fixed, e755, Fri Jun 29 12:39:34 2018, Louis, OFFLINE, General, Cryo-LH2, Analysis 38Ar(p,t)36Ar run 128 to 156 Kinematics_36Arpt_FIT1Ex.pngKinematics_36Arpt_FITGS.pngTelescope_Ex_36Arpt.pngTelescope_Ex_36Arpt_fit_exited.png36Ar_level_list.png
Here are some plot summarizing the analysis status on the [B]36Ar(p,t)34Ar[/B] channel.

Run concerned: 128-156 
Fixed, e755, Sat Jun 30 09:17:25 2018, Louis, OFFLINE, General, Cryo-LH2, Offline analysis of 37Ca(p,d)36Ca reaction 7x
Here are some plot summarizing the analysis status on the [B]37Ca(p,d)36Ca[/B] channel. Plots shows performance of the setup in optimal conditions and preli;inary
results.
Fixed, e755, Sun Jul 1 21:21:18 2018, Louis, RUN, General, Cryo-LH2, RUN 217 scaler_2018-07-01_21h22m54s.pngvisu_2018-07-01_21h24m16s.pngvisu_2018-07-01_21h24m33s.pngvisu_2018-07-01_21h24m48s.png
RUN 217

37Ca beam at 2.104pps
Fixed, e755, Mon Jul 2 00:53:49 2018, Louis, OFFLINE, General, Cryo-LH2, Update offline analysis on 37Ca(p,d)36Ca 37Capd_All_192_0277.pdf37Capd_Z19_FIT_192_0277.pdf37Capd_Z20_192_0277.pdf
Update of offline Analysis of the [B]37Ca(p,d)36Ca[/B] reaction:

Run 192 to 207
Fixed, e755, Mon Jul 2 07:23:34 2018, Louis, OFFLINE, General, Cryo-LH2, 36Ca and 37Ca(p,t)35Ca reaction Ex_all_pd_192to222.pngKinematics_pt_192to222_Z20.pngpt36Ca_Ex_all_192_222.pngKinematics_pt_192to222_Z20_without_line.png
RUN 192 to 222
Beam time: 62h

ELOG Home Page