MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 30 of 48  Not logged in MUST2
    Fixed, e744, Wed May 30 01:15:58 2018, Valérie, Louis, RUN, General, CH2, Run #2115 6x
Since 2h58 : WAITING FOR THE BEAM TO START THE RUN

RUN #2115 30 mai 2018 start @ 03h20; stop @ 4h56
END OF THE RUN because there is an alarm related to a potential water leakage in the D3-D6 equipments. see next entry.
PCP will make a survey and enter to check the Qpole all off. We put the Wien filter off.
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Night shift team: Louis, Valérie

Beam intensity recovered around 70k-90k pps at 3h37
Again down at 300 pps at 3h30 due to the loss of the "HyperPi" of the source (hummm we should ask experts about the meaning cf JCT)

cf current of T4 around 15 µA (at 3h15 without beam; same at 3h20 with beam), increasing during the run, 16 µA see Run2115_HVMust2At3h50.png

cf small rate at the beginning, cf Run2115_scalersInit.png
max around 91k pps at 3h27, cf Run2115_scalersAt3h27.png

------------------------------------------------------------------------------------------------------------------------------------------
Fixed, e744, Wed May 30 07:06:58 2018, François, Louis, Valérie, RUN, General, CH2, Run 2116 Run2116_initScalers.pngHT_MUST2_Wed30May_At7h05.pngRun2116_MMimpacts_At7h23.png
Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69. STOP at 8h33 (beam rate decreasing at the end of the run due to machine problems).

Around 6-6h40 Leakage alarm problem was solved by Sébastien Le Moal (see last entry) and Qpoles were set again.

Wien filter +/-0.8 kV.

target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Night morning shift team: Louis, Valérie; François arriving at 7h just on time to apply the values of the Qpoles in D6 and to check the beam profile on PR62Gaz.
See LISE notebook for the printed beam profile. The plot of MM impacts looks good.

Beam intensity around 100k pps at 7h15.

cf current of T4 around 15 µA at 7h15.
Fixed, e744, Wed May 30 08:34:51 2018, Valérie, RUN, General, CH2, Run 2117- low or no beam Run2117_scalersINIT.png
Wednesday 30th May.
Run 2117 started at 8h36 ; Stop at 8h45: BEAM STOP.
Beam decreased at the end of Run 2116, still very low at the beginning of run 2117, 300 pps then 3 pps.
PCP told us that it should take a few minutes to recover it, but it will take more time (maybe 1/2 hour) to recover the beam,
due to vacuum problems before the target. The operators have to enter in the vault to check the equipments.

target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions CATS1 3. 10**4. PPT 3000 ; EXL 10**4
Morning team: Louis, Phil, Marlete Valérie

cf current of T4 around 12 µA at 8h50 decreasing to 10 µA at 9h02 when there is no beam.
Fixed, e744, Wed May 30 11:42:41 2018, Freddy, Adrien, RUN, General, CH2, Run 2119 - Target 4 CH2 Run2119_initScalers.pngRun2119_MMimpacts_At11h25.pngRun2119_TAC.pngRun2119_Trigger.pngRun2119_HT.png
Run 2119

Start: 11h25m53s
Stop: 13h24
Beam 14O at: 1.6*10^5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions (Unchanged) CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Comments:
  • We realized that the pulser frequency for dead time measurement changed from 100 Hz to 50 Hz a few runs ago. It is not clear if someone changed it during an intervention in D6.
Fixed, e744, Wed May 30 13:25:57 2018, Phil, Freddy, RUN, General, CH2, Run 2020 - target number 4 Scalers_start_run2020.pngRun2020_leakages_13h35.png
Run 2020

Start: 13h24m
Stop: 13h41
Beam 14O at: 1.2*10^5 pps
target n°4. CH2 104 µm
All triggers, (no LISE)
Divisions (Unchanged) CATS1 3. 10**4. PPT 3000 ; EXL 10**4

Comments:

Pulser frequency is still at 48 Hz, i.e. lower than expected - expect 100ish Hz. Freddy is investigating.


!!! Beam intensity is dropping a lot so run stopped at 13h41. !!!
Fixed, , Fri Jun 1 11:11:13 2018, e748, EXL-PPT, General, 60Co, run #3002 ppt trigger scaler_start_run3003.png
run #3002 ppt trigger

start 11h11
Fixed, e744, Fri Jun 1 12:06:47 2018, Valerian, EXL-PPT, General, 60Co, run #3002 Calib PPT scaler_start_run3002.pngscaler_stop_run3002.png
run #3002
start @11h09
stop @12h04
Fixed, e744, Fri Jun 1 13:12:16 2018, Valérian, EXL-PPT, General, 60Co, run #3003 Calib EXL scaler_start_run3003_ok.pngscaler_stop_run3003_ok.png
run #3003
start @12h06
stop @13h08
Fixed, e744, Fri Jun 1 19:19:20 2018, Valerian, MUST2, General, N/A, Calimero end 
For the end of e744 the calimero runs are the following ones :

run 3009 X T1-4
run 3010 Y T1-4
run 3011 X T5
run 3013 Y T5
Fixed, e744, Fri Jun 1 19:29:17 2018, Valérian, EXL-PPT, General, 60Co, EXL efficiency 
To test EXL efficiency I start a long run with the source in front of it.
run 3014
start @19h25
stop @ 17H10 3 June.
Fixed, e744, Mon Jun 4 18:45:15 2018, shumpei, MUST2, Hardware, N/A, No data for two CsIs of MUST2 csin.pdfcsip.pdf
During E744 experiment, two CsI crystals (number 1 & 10) of MM2 had no data as attached.
When the M2C chamber was opened today, I found at least connection for CsI number 1 of MM2 has a problem.
It takes some time to fix the connection for CsI, so it may be going to be fixed after some hardware problems are found in this week.
Fixed, e755, Thu Jun 7 09:46:47 2018, Louis, MUST2, Hardware, 3-alpha, MUST2 test MMYE1_4_3alpha_06062022.pngMMYE1_4_3alpha_06062021.pngMMYE1_4_3alpha_06062020.pngMMYE1_4_3alpha_06062019.png
The 8 MUST2 telescopes have been installed and pluged in final configuration. Energy signal have been tested with 2 3-alphas sources, one in front of T5-T6 and one in front of the others.
Energy signal for all telescopes looks ok exept for telescopes 5. Concidering their position with respect to the source T5 and T6 should have the same count. In fact, T5X see signal at the good energy but with two times less count than T6X. T5Y see 10 times less count than T6Y.
One can also see some noise on the middle part of T8X
Fixed, e755, Thu Jun 7 12:19:18 2018, Louis, MUST2, Hardware, N/A, MUST2 configuration, X1Y1 and PCB numbers  Config_MUST2.jpgConfig_MUST2_T56.jpg
Pictures showing the MUST2 configuration.
X and Y positions and PCB numbers are as folow are as follow:
T1, PCB5: 

Y128.......X128Y1
    .     . 
    .     .
    .......X1 



T2, PCB4:  

    .......Y128 
    .     .
    .     .
X1.......X128Y1 



T3, PCB7: 

X1....... 
    .     .
    .     .
X128Y1.......Y128 




T4, PCB10: 

X128Y1.......X1 
    .     .
    .     .
Y128....... 




T5, PCB6: 

X128Y1.......X1 
    .     .
    .     .
Y128....... 



T6, PCB2:  

    .......Y128 
    .     .
    .     .
X1.......X128Y1 



T7, PCB8: 

X128Y1.......X1 
    .     .
    .     .
Y128....... 



T8, PCB3: 

Y128.......X128Y1
    .     . 
    .     .
    .......X1
Fixed, e755, Thu Jun 7 13:54:59 2018, Louis, MUST2, Hardware, N/A, MUST2 Time MMXT1_4_07062018.pngMMYT1_4_07062018.pngMMYT5_8_07062018.pngMMXT5_8_07062018.png
MUST2 time have been tested for T1 to T8 for X and Y. FAG has been delayed with 150ns and 500ns and sent as stop in MUVI 1 and 2. One can see two pics in all spectrum. All scales of TAC have been setted to 600ns.
Fixed, e755, Thu Jun 7 17:12:38 2018, Louis, MUST2, Hardware, 3-alpha, Calib Alpha MMYE1_4_08062020.pngMMYE5_8_08062020.pngMMXE1_4_08062019.pngMMXE5_8_08062019.png
Run 3028: Calib 3 alpha started at 17h05
Run3029:Calib 3 alpha started at 17h54

Config pedestals aligned. Saved in files:
E755_Tx_07062018

Temperature on ASIC:
T1X: 7 deg
T1Y: 4
T2X: 7
T2Y: 4
T3X: 6
T3Y: 3
T4X: 5
T4Y: 3
T5X: 8
T5Y: 6
T6X: 12
T6Y: 5
T7X: 5
T7Y: 1
T8X: 10
T8Y: 8


Telescopes 1 to 8 are ok for X and Y Energy and Time signal
Fixed, e755, Sun Jun 10 19:51:52 2018, Louis, MUST2, Hardware, 3-alpha, Calibration run MMYE1_4_11062020.pngMMYE5_8_11062020.pngMMXE1_4_11062020.pngMMXE5_8_projection_11062020.png
Run3031:Calib 3 alpha started at 19h49
stoped at 9h15

Temperature on ASIC:
T1X: 7 deg
T1Y: 4
T2X: 7
T2Y: 4
T3X: 6
T3Y: 3
T4X: 5
T4Y: 3
T5X: 8
T5Y: 5
T6X: 12
T6Y: 4
T7X: 5
T7Y: 1
T8X: 10
T8Y: 8


energy resolution in X telescope 5 seems a little bit worst than for the other telescopes but cannot see some double pics effect
Fixed, e755, Mon Jun 11 12:50:56 2018, Louis, MUST2, Hardware, 3-alpha, Impact matrix 8x
Impact matrix for Telescope 1 to 8 from the run 3029 calibrated
Fixed, e755, Mon Jun 11 13:28:21 2018, Louis, ONLINE, Hardware, 3-alpha, Energy resolution MUST2 
Energy resolution of the 8 MUST2 telescopes from central pic of run 3029 calibrated with 3 alpha source.

T1: mean = 5.389MeV , sigma = 15.0keV
T2: mean = 5.385MeV , sigma = 15.7keV
T3: mean = 5.391MeV , sigma = 15.2keV
T4: mean = 5.418MeV , sigma = 14.0keV
T5: mean = 5.390MeV , sigma = 16.3keV
T6: mean = 5.391MeV , sigma = 14.6keV
T7: mean = 5.389MeV , sigma = 17.5keV
T8: mean = 5.386MeV , sigma = 14.7keV
Total: mean = 5.391MeV , sigma = 17.7keV
Fixed, e755, Wed Jun 13 11:40:18 2018, Adrien Valérian Louis, MUST2, Hardware, 3-alpha, RUN Source 4 Alpha EY_T1_4_13062020.pngEY_T5_8_13062020.pngEX_T1_4_13062020.pngEX_T5_8_13062020.png
run 1: 4 alpha source, without heat shield, 1 bar air inside the target cell.

Data has been taken with a 4 alpha source: 3 alpha around 5Mev plus one around 8.7MeV
On telescope 7 and 8, one can see the four alpha which are not intercepted by the heat shield. Telescope 1 to 4 see only one alpha around 2.5Mev on the border of the strips. T5 and T6 see the alpha at 2.5Mev in the center of stripX.

Fixed, e755, Wed Jun 13 18:20:02 2018, linda, Daisuke, Louis, MUST2, Hardware, 3-alpha, Run test with heat shield EX_T5_8_14062021.pngEX_T1_4_14062021.pngEY_T1_4_14062021.pngEY_T5_8_14062021.png
Run 9: heat shield added with two MYLAR foil of 2um, vacuum has been made inside target cell. 4 alpha source

ELOG Home Page