Fixed | e744 |
Wed May 30 01:15:58 2018 |
Valérie, Louis | RUN | General | CH2 | Run #2115 | [B]Since 2h58 : WAITING FOR THE BEAM TO START
THE RUN[/B]
|
6x |
Fixed | e744 |
Wed May 30 07:06:58 2018 |
François, Louis, Valérie | RUN | General | CH2 | Run 2116 | Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69.
STOP at 8h33 (beam rate decreasing at the |
  |
Fixed | e744 |
Wed May 30 08:34:51 2018 |
Valérie | RUN | General | CH2 | Run 2117- low or no beam | Wednesday 30th May.
Run 2117 started at 8h36 ; Stop at 8h45:
BEAM STOP.
|
|
Fixed | e744 |
Wed May 30 11:42:41 2018 |
Freddy, Adrien | RUN | General | CH2 | Run 2119 - Target 4 CH2 | [U][B]Run 2119[/B][/U]
Start: 11h25m53s
|
    |
Fixed | e744 |
Wed May 30 13:25:57 2018 |
Phil, Freddy | RUN | General | CH2 | Run 2020 - target number 4 | Run 2020
Start: 13h24m
|
 |
Fixed | |
Fri Jun 1 11:11:13 2018 |
e748 | EXL-PPT | General | 60Co | run #3002 ppt trigger | run #3002 ppt trigger
start 11h11 |
|
Fixed | e744 |
Fri Jun 1 12:06:47 2018 |
Valerian | EXL-PPT | General | 60Co | run #3002 Calib PPT | run #3002
start @11h09
stop @12h04 |
 |
Fixed | e744 |
Fri Jun 1 13:12:16 2018 |
Valérian | EXL-PPT | General | 60Co | run #3003 Calib EXL | run #3003
start @12h06
stop @13h08 |
 |
Fixed | e744 |
Fri Jun 1 19:19:20 2018 |
Valerian | MUST2 | General | N/A | Calimero end | For the end of e744 the calimero runs are
the following ones :
|
|
Fixed | e744 |
Fri Jun 1 19:29:17 2018 |
Valérian | EXL-PPT | General | 60Co | EXL efficiency | To test EXL efficiency I start a long run
with the source in front of it.
run 3014
|
|
Fixed | e744 |
Mon Jun 4 18:45:15 2018 |
shumpei | MUST2 | Hardware | N/A | No data for two CsIs of MUST2 | During E744 experiment, two CsI crystals (number
1 & 10) of MM2 had no data as attached.
When the M2C chamber was opened today, I |
 |
Fixed | e755 |
Thu Jun 7 09:46:47 2018 |
Louis | MUST2 | Hardware | 3-alpha | MUST2 test | The 8 MUST2 telescopes have been installed
and pluged in final configuration. Energy
signal have been tested with 2 3-alphas sources, |
   |
Fixed | e755 |
Thu Jun 7 12:19:18 2018 |
Louis | MUST2 | Hardware | N/A | MUST2 configuration, X1Y1 and PCB numbers | Pictures showing the MUST2 configuration.
X and Y positions and PCB numbers are as |
 |
Fixed | e755 |
Thu Jun 7 13:54:59 2018 |
Louis | MUST2 | Hardware | N/A | MUST2 Time | MUST2 time have been tested for T1 to T8 for
X and Y. FAG has been delayed with 150ns
and 500ns and sent as stop in MUVI 1 and |
   |
Fixed | e755 |
Thu Jun 7 17:12:38 2018 |
Louis | MUST2 | Hardware | 3-alpha | Calib Alpha | Run 3028: Calib 3 alpha started at 17h05
Run3029:Calib 3 alpha started at 17h54
|
   |
Fixed | e755 |
Sun Jun 10 19:51:52 2018 |
Louis | MUST2 | Hardware | 3-alpha | Calibration run | Run3031:Calib 3 alpha started at 19h49
stoped at 9h15
|
   |
Fixed | e755 |
Mon Jun 11 12:50:56 2018 |
Louis | MUST2 | Hardware | 3-alpha | Impact matrix | Impact matrix for Telescope 1 to 8 from the
run 3029 calibrated |
8x |
Fixed | e755 |
Mon Jun 11 13:28:21 2018 |
Louis | ONLINE | Hardware | 3-alpha | Energy resolution MUST2 | Energy resolution of the 8 MUST2 telescopes
from central pic of run 3029 calibrated with
3 alpha source.
|
|
Fixed | e755 |
Wed Jun 13 11:40:18 2018 |
Adrien Valérian Louis | MUST2 | Hardware | 3-alpha | RUN Source 4 Alpha | run 1: 4 alpha source, without heat shield,
1 bar air inside the target cell.
|
   |
Fixed | e755 |
Wed Jun 13 18:20:02 2018 |
linda, Daisuke, Louis | MUST2 | Hardware | 3-alpha | Run test with heat shield | Run 9: heat shield added with two MYLAR foil
of 2um, vacuum has been made inside target
cell. 4 alpha source |
   |