  MUST2, Page 30 of 48  Not logged in MUST2
    Fixed, e744, Wed May 30 01:15:58 2018, Valérie, Louis, RUN, General, CH2, Run #2115 6x
[B]Since 2h58 : WAITING FOR THE BEAM TO START THE RUN[/B]

[B]RUN #2115 30 mai 2018 start @ 03h20; stop  @ 4h56[/B] 
Fixed, e744, Wed May 30 07:06:58 2018, François, Louis, Valérie, RUN, General, CH2, Run 2116 Run2116_initScalers.pngHT_MUST2_Wed30May_At7h05.pngRun2116_MMimpacts_At7h23.png
Wednesday 30th May.
Beam back at 6h59. Run 2116 started at 6h69. STOP at 8h33 (beam rate decreasing at the end of the run due to machine problems).
Fixed, e744, Wed May 30 08:34:51 2018, Valérie, RUN, General, CH2, Run 2117- low or no beam Run2117_scalersINIT.png
Wednesday 30th May.
Run 2117 started at 8h36 ; Stop at 8h45:   BEAM STOP.  
Beam decreased at the end of Run 2116, still very low at the beginning of run 2117, 300 pps then 3 pps.
Fixed, e744, Wed May 30 11:42:41 2018, Freddy, Adrien, RUN, General, CH2, Run 2119 - Target 4 CH2 Run2119_initScalers.pngRun2119_MMimpacts_At11h25.pngRun2119_TAC.pngRun2119_Trigger.pngRun2119_HT.png
[U][B]Run 2119[/B][/U]

Start: 11h25m53s  
Fixed, e744, Wed May 30 13:25:57 2018, Phil, Freddy, RUN, General, CH2, Run 2020 - target number 4 Scalers_start_run2020.pngRun2020_leakages_13h35.png
Run 2020

Start: 13h24m
Fixed, , Fri Jun 1 11:11:13 2018, e748, EXL-PPT, General, 60Co, run #3002 ppt trigger scaler_start_run3003.png
run #3002 ppt trigger

start 11h11
Fixed, e744, Fri Jun 1 12:06:47 2018, Valerian, EXL-PPT, General, 60Co, run #3002 Calib PPT scaler_start_run3002.pngscaler_stop_run3002.png
run #3002
start @11h09
stop  @12h04
Fixed, e744, Fri Jun 1 13:12:16 2018, Valérian, EXL-PPT, General, 60Co, run #3003 Calib EXL scaler_start_run3003_ok.pngscaler_stop_run3003_ok.png
run #3003
start @12h06
stop @13h08
Fixed, e744, Fri Jun 1 19:19:20 2018, Valerian, MUST2, General, N/A, Calimero end 
For the end of e744 the calimero runs are the following ones :

run 3009 X T1-4
Fixed, e744, Fri Jun 1 19:29:17 2018, Valérian, EXL-PPT, General, 60Co, EXL efficiency 
To test EXL efficiency I start a long run with the source in front of it.
run 3014
start @19h25
Fixed, e744, Mon Jun 4 18:45:15 2018, shumpei, MUST2, Hardware, N/A, No data for two CsIs of MUST2 csin.pdfcsip.pdf
During E744 experiment, two CsI crystals (number 1 & 10) of MM2 had no data as attached.
When the M2C chamber was opened today, I found at least connection for CsI number 1 of MM2 has a problem.
It takes some time to fix the connection for CsI, so it may be going to be fixed after some hardware problems are found in this week.
Fixed, e755, Thu Jun 7 09:46:47 2018, Louis, MUST2, Hardware, 3-alpha, MUST2 test MMYE1_4_3alpha_06062022.pngMMYE1_4_3alpha_06062021.pngMMYE1_4_3alpha_06062020.pngMMYE1_4_3alpha_06062019.png
The 8 MUST2 telescopes have been installed and pluged in final configuration. Energy signal have been tested with 2 3-alphas sources, one in front of T5-T6
and one in front of the others. 
Energy signal for all telescopes looks ok exept for telescopes 5. Concidering their position with respect to the source T5 and T6 should have the same
Fixed, e755, Thu Jun 7 12:19:18 2018, Louis, MUST2, Hardware, N/A, MUST2 configuration, X1Y1 and PCB numbers  Config_MUST2.jpgConfig_MUST2_T56.jpg
Pictures showing the MUST2 configuration. 
X and Y positions and PCB numbers are as folow are as follow: 
Fixed, e755, Thu Jun 7 13:54:59 2018, Louis, MUST2, Hardware, N/A, MUST2 Time MMXT1_4_07062018.pngMMYT1_4_07062018.pngMMYT5_8_07062018.pngMMXT5_8_07062018.png
MUST2 time have been tested for T1 to T8 for X and Y. FAG has been delayed with 150ns and 500ns and sent as stop in MUVI 1 and 2. One can see two pics in
all spectrum. All scales of TAC have been setted to 600ns.
Fixed, e755, Thu Jun 7 17:12:38 2018, Louis, MUST2, Hardware, 3-alpha, Calib Alpha MMYE1_4_08062020.pngMMYE5_8_08062020.pngMMXE1_4_08062019.pngMMXE5_8_08062019.png
Run 3028: Calib 3 alpha started at 17h05
Run3029:Calib 3 alpha started at 17h54
Fixed, e755, Sun Jun 10 19:51:52 2018, Louis, MUST2, Hardware, 3-alpha, Calibration run MMYE1_4_11062020.pngMMYE5_8_11062020.pngMMXE1_4_11062020.pngMMXE5_8_projection_11062020.png
Run3031:Calib 3 alpha started at 19h49
stoped at 9h15
Fixed, e755, Mon Jun 11 12:50:56 2018, Louis, MUST2, Hardware, 3-alpha, Impact matrix 8x
Impact matrix for Telescope 1 to 8 from the run 3029 calibrated
Fixed, e755, Mon Jun 11 13:28:21 2018, Louis, ONLINE, Hardware, 3-alpha, Energy resolution MUST2 
Energy resolution of the 8 MUST2 telescopes from central pic of run 3029 calibrated with 3 alpha source.

T1: mean = 5.389MeV  ,  sigma = 15.0keV
Fixed, e755, Wed Jun 13 11:40:18 2018, Adrien Valérian Louis, MUST2, Hardware, 3-alpha, RUN Source 4 Alpha EY_T1_4_13062020.pngEY_T5_8_13062020.pngEX_T1_4_13062020.pngEX_T5_8_13062020.png
run 1: 4 alpha source, without heat shield, 1 bar air inside the target cell.

Data has been taken with a 4 alpha source: 3 alpha around 5Mev plus one around 8.7MeV
Fixed, e755, Wed Jun 13 18:20:02 2018, linda, Daisuke, Louis, MUST2, Hardware, 3-alpha, Run test with heat shield EX_T5_8_14062021.pngEX_T1_4_14062021.pngEY_T1_4_14062021.pngEY_T5_8_14062021.png
Run 9: heat shield added with two MYLAR foil of 2um, vacuum has been made inside target cell. 4 alpha source