Ongoing, e744, Tue May 29 05:07:33 2018, Valerian, OFFLINE, General, CH2, Fusion evaporation background and physics data 
|
Comparison between the fusion evaporation background and the data for the telescope 5 ~0degree angles and rough subtraction of this background. |
Ongoing, e744, Tue May 29 05:24:34 2018, Valerian, EXL-PPT, General, CH2, Comparison of background and physics data for gamma ray detectors 
|
Gamma ray spectrum for both targets seem extremely close. Subtraction is then made but no gamma show. More statistic is needed |
Ongoing, e744, Tue May 29 18:49:21 2018, Valerian, OFFLINE, General, CH2, Comparison of gamma prompt spectrum for EXL and PPT 
|
Quick note, there is less data seen in EXL prompt. This should be investigated |
Ongoing, e744, Wed May 30 01:30:34 2018, Valerian, OFFLINE, General, CH2, Checking the T4
|
After checking every telescope, it seems that the calibration of T4 is very off, I think that for now, it might be a good thing to consider this telescope
out of the analysis ? |
Fixed, e744, Fri Jun 1 12:06:47 2018, Valerian, EXL-PPT, General, 60Co, run #3002 Calib PPT 
|
run #3002
start @11h09
stop @12h04 |
Fixed, e744, Fri Jun 1 19:19:20 2018, Valerian, MUST2, General, N/A, Calimero end
|
For the end of e744 the calimero runs are the following ones :
run 3009 X T1-4
|
Fixed, e755, Thu Jun 21 16:08:32 2018, Valerian, MUST2, Hardware, N/A, Run 3045 : Calimero T1-4 X
|
[U][B]run 3045 :[/B][/U]
start @ 15h35
stop @ 15h59
|
Pinned, e755, Thu Jun 21 17:07:14 2018, Valerian, MUST2, General, N/A, run 3046 : Calimero T1-4Y
|
[U]run 3046 :[/U] Calimero T1-4Y
start @ 16h28
stop @ 16h53 |
Fixed, e755, Sat Jun 23 19:41:49 2018, Valerian, OFFLINE, General, Cryo-LH2, De_E plot
|
|
Pinned, e755, Tue Jun 26 18:43:35 2018, Valerian, DAQ, General, N/A, In case of a data acqusition crash
|
[CODE]If the acquisition crash :
In the acquisition terminal :
|
Fixed, e755, Wed Jun 27 16:03:26 2018, Valerian, OFFLINE, General, Cryo-LH2, Status on 38Ca pt
|
|
Fixed, e748, Thu Jul 6 21:35:29 2017, Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) , RUN, General, CD2, Run 346 e748+e748chio 6x
|
Run 346 started at 21h37
Beam around 7µA CATS 2 46k
|
Fixed, e748, Thu Jul 6 20:46:15 2017, Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) , RUN, General, CD2, Run 345 DAQ+344 chio after chio problem
|
The HV on cathode is now set again at 2900V. At 20h50 we get back the beam for the run.
(Grid still ok at 920V)
Beam problem cf the scalers. Losing beam somewhere.
|
Fixed, e748, Thu Jul 6 21:27:52 2017, Thomas R + shift U (Valérie L) +S (Daisuke, Marlène, Shumpei) , RUN, General, CD2, Run 345 beam intensity loss
|
The beam rate was low after intervention with the CHIO HV.
Thomas contacted Jean-Charles and PCP. It turned out that some quadrupoles (Q31, Q34, Q21) of LISE were turned off. Thomas put correct parameters and turned |
Fixed, e748, Wed Jun 28 15:07:43 2017, Thomas, CHIO, Software, N/A, Trapezoidal filter for CHIO
|
const int nCHIO=200; // nb samples. sera ajuste en manip
float SIG[nCHIO];
|
Fixed, e744, Mon May 28 22:27:14 2018, Simon et Louis, RUN, General, CH2, RUN 2102 DATA target 4 
|
run #2102
start @22h20
stop @23h30
|
Fixed, e744, Mon May 28 23:52:19 2018, Simon and Louis (start), Franck (stop), RUN, General, Carbon, RUN 2103 DATA target 1 Carbon 
|
run #2103
start @23h49
stop @1h51
|
Fixed, e738, Tue Jul 10 00:46:26 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 323 + Brho line settings  
|
Run 323 start: 0h20 stop: 2h45
e748 Exxx 3,5G 10 juil. 02:45 run_0323.dat.10-07-18_00h20m04s
Beam: 9C
|
Fixed, e738, Tue Jul 10 02:47:10 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 324 24x
|
Run 324 start: 2h45 stop 5h10
e748 Exxx 3,8G 10 juil. 05:10 run_0324.dat.10-07-18_02h44m52s
Beam: 9C
|
Fixed, e738, Tue Jul 10 05:12:31 2018, Shumpei, Valérie, RUN, General, Cryo-LH2, RUN 325  
|
Run 325 start: 5h10 stop 6h53 due to CATS1 -->tripping
e748 Exxx 2,5G 10 juil. 06:53 run_0325.dat.10-07-18_05h09m53s
Beam: 9C
|
|