e755
Sat Jun 23 21:52:01 2018
takeshi
TARGET
Hardware
N/A
evaporation of the H2 target
Here is the temperature log when we evaporate
the liquid H2 by heater.
The black line is what we call sensor A,
Fixed
e755
Sat Jun 23 22:03:17 2018
takeshi
TARGET
Hardware
temperasure log of the target
I would report the temperature log of the
liquid hydrogen target.
We consider it was liquid during the beam
Fixed
e755
Sat Jun 23 23:38:32 2018
takeshi
RUN
Social
Cryo-LH2
run summary for 40Ca beam
run 63-85, total 15.4 hours data was taken
start stop
Fixed
e755
Sun Jun 24 12:10:35 2018
takeshi
TARGET
Hardware
target temperature during warming up
I would share the temperature log of the target
cell during warming it up.
The thick line is the heat shield and the
Fixed
e755
Sun Jun 24 13:20:51 2018
takeshi
TARGET
Hardware
N/A
start target cooling
We started cooling the target cell at 13h03.
It would take 4 - 5 hours to cooling the
cell enough low for liquifying hydrogen.
Fixed
e755
Sun Jun 24 22:13:29 2018
takeshi
TARGET
Hardware
N/A
temperature log of the target
We liquefied the hydrogen target around 22:00.
I would share the temperature log of the
Fixed
e755
Tue Jun 26 09:28:10 2018
takeshi
TARGET
Hardware
N/A
temperature of the target
<p>Here is the temperature log of the target
up to now. The black lines are today, The
thicker line is the cell window this time,
Fixed
e755
Wed Jun 27 01:14:54 2018
takeshi
RUN
General
N/A
online run summary
I made a run summary up to now in the google
spreadsheet.
You can see it on
Fixed
e755
Wed Jun 27 05:57:49 2018
takeshi
TARGET
General
Cryo-LH2
liquid hydrogen target temperature log
It seems stable.
We liquified H2 around 22:00 24th (10 hours
in the plot), so the target kept liquefying
Fixed
e755
Wed Jun 27 10:15:36 2018
takeshi
RUN
General
Cryo-LH2
run summary for 38Ca + liq. H2
Here is the summary of the measurement of
38Ca + liq H2 setting.
We obtain 49.45-hour data acquisition time,
Fixed
e755
Fri Jun 29 07:04:35 2018
takeshi
TARGET
Hardware
Cryo-LH2
target temperature
Fixed
e755
Fri Jun 29 14:00:51 2018
takeshi
RUN
General
Cryo-LH2
summary for 38Ca + liq. H2, updated
I would summarize the statistics of 38Ca +
liq H2 target measurement.
We have obtained the data of 49.5 hours until
Ongoing
e755
Sat Jun 30 20:12:33 2018
takeshi
TARGET
Hardware
Cryo-LH2
target temperature
Latest update at 12:15 pm on July 1
Here are the temperature logs up to 7:00pm
30/6.
Ongoing
e755
Mon Jul 2 16:16:40 2018
takeshi
TARGET
Hardware
Cryo-LH2
temperature log of the target
Fixed
e755
Mon Jul 2 22:07:27 2018
takeshi
RUN
General
Cryo-LH2
run summary for 37Ca
Here is the run summary for the 37Ca beam
+ liq. H2 target setting.
We have obtained totally 65.7 hours data
Fixed
e755
Tue Jul 3 17:55:01 2018
takeshi
RUN
General
Cryo-LH2
run summary for 40Ca + liq. H2
We have obtained 6 hours data for the 40Ca
+ liq. hydogen setting today.
Note that we have already taken 15.6 hours
Fixed
e755
Tue Jul 3 18:48:52 2018
takeshi
TARGET
Hardware
Cryo-LH2
temperature log of the target
Here is the temperature log of the liquid
hydrogen target,
We kept it about 6 days.
Fixed
e738
Sun Jul 8 00:45:44 2018
takeshi
RUN
General
N/A
run summary
The runsummary for this E738 experiment is
available at the same place as previous e755
experiment.
Ongoing
e738
Sun Jul 8 08:53:44 2018
takeshi
TARGET
Hardware
Cryo-LH2
temperature log of the target
Fixed
e738
Mon Jul 9 08:00:11 2018
takeshi
TARGET
Hardware
Cryo-LH2
temperature log of the target
Here are the temperature log of the cyo H2
target during the 10C setting.