Ongoing, e744, Thu Apr 26 19:37:24 2018, Valerian and Freddy, MUST2, Hardware, N/A, Debug of Must2 telescopes debug_mm_telescopes.pdfProblem_on_T5_T6_cable_swap.pdf
Today we found different problems, no time on T4 and no signal on T5 and T6 CsI tripping. After changing cables and a lot of tests with the chamber open and only the BT ON, T4 and T5 problems seemed to be fixed.

The CsI of T6 is still tripping but it will have to be tested with the chamber closed.

For a more precise explanation see the pdf in attachment.
Fixed, e755, Fri Jun 22 11:14:01 2018, Valerian Pierre Adrien Fred Fairouz, MUST2, General, N/A, run 3061 Calimero T5-8X Calimero_T56X.png
run 3061 Calimero T5-8X
Fixed, e755, Sat Jun 23 18:01:58 2018, Valerian Maurycy, OFFLINE, General, Cryo-LH2, Kinematics Line ELab_Theta_2H.pdfELab_Theta_3H.pdfELab_Theta_3He.pdfELab_Theta_4He.pdf
Using Run 63-64 we drew Kinematics Lines.
Ongoing, e744, Thu May 3 19:11:14 2018, Valerian Marlene and Francois, MUST2, General, 3-alpha, run 3 alpha T5 
run #196
3 alpha source and pedestals supressed
Trigger T5 only
Fixed, e744, Thu May 24 21:05:05 2018, Valerian Iulian and Francois, TARGET, Hardware, , 14N - 187um target placement 20180524_210115.jpg
For resonant elastic scattering of 14N(pp)14N the 187um target is placed.
Pinned, e744, Fri May 25 04:02:29 2018, Valerian Iulian Pedja and Cristina, OTHER, General, N/A, General power cut of ganil 
Due to some water leaks, CSS1 CSS2 and CIME as the vacuum system of GANIL are down... Time loss could be considerable... They talked about beam possibility in the morning but it seems unlikely.
Ongoing, e744, Tue May 29 16:23:56 2018, Valerian Iulian Maurycy, OFFLINE, General, CH2, Hint of a 2p peaks  Two_proton_14Ovs12C.pdf
Pending, e744, Tue Apr 24 14:18:22 2018, Valerian Freddy and Adrien aka Cherry Mx Team, MUST2, Hardware, N/A, Current telescope-pcb layout 
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Telescope 4 : PCB 11 (ref on pcb: n°2834-9)

Telescope 5 : PCB 2 (ref on pcb: X2489-8) Backward angles
Telescope 6 : PCB 6 around 90d eg.
------------------------   ------------------------
                       /  \
                      /    \
        4            /      \            1
                    /        \
                   /          \ 
                  /            \
                 /              \
-----------------                -----------------
-----------------        x       -----------------
                 \     BEAM     /
                  \            /
                   \          /
        3           \        /         2
                     \      /
                      \    /
                       \  /
------------------------  ------------------------
Fixed, e755, Sat Jun 23 14:07:40 2018, Valerian Fairouz, RUN, General, N/A, Problem from Narval narval_crash_problem.png
Narval actors went crazy see joined images

run 75 must be trash as it created 18 files of 4Go in 10 minutes :

-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:54 run_0075.dat.23-06-18_12h56m41s
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:55 run_0075.dat.23-06-18_12h56m41s.1
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:55 run_0075.dat.23-06-18_12h56m41s.2
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:56 run_0075.dat.23-06-18_12h56m41s.3
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:57 run_0075.dat.23-06-18_12h56m41s.4
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:57 run_0075.dat.23-06-18_12h56m41s.5
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:58 run_0075.dat.23-06-18_12h56m41s.6
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:59 run_0075.dat.23-06-18_12h56m41s.7
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:59 run_0075.dat.23-06-18_12h56m41s.8
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:00 run_0075.dat.23-06-18_12h56m41s.9
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:00 run_0075.dat.23-06-18_12h56m41s.10
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:01 run_0075.dat.23-06-18_12h56m41s.11
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:02 run_0075.dat.23-06-18_12h56m41s.12
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:02 run_0075.dat.23-06-18_12h56m41s.13
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:04 run_0075.dat.23-06-18_12h56m41s.14
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:05 run_0075.dat.23-06-18_12h56m41s.15
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:06 run_0075.dat.23-06-18_12h56m41s.16
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:07 run_0075.dat.23-06-18_12h56m41s.17
-rw-r--r-- 1 e748 Exxx 4,0G 23 juin 2018 run_0075.dat.23-06-18_12h56m41s.18
Fixed, e744, Fri May 4 11:20:50 2018, Valerian, MUST2, General, 3-alpha, T5 : 0° telescope  StripX_vs_StripY_T5_100V.pdfSi_E_T5_100V.pdf
After increasing the voltage on T5 DSSD from 80V to 100V the resolution increased from ~40keV sigma to 20keV sigma.

StripX vs StripY bidim and the 3 alpha peaks are joined to this entry.
Fixed, e744, Sun May 6 17:52:21 2018, Valerian, RUN, General, 3-alpha, Run #205 T1 T2 T3 & T4 
run #205
T1 T2 T3 & T4 T5 still in trigger but no HT/BT
start @15h43
stop @17h52
Ongoing, e744, Sun May 6 17:55:05 2018, Valerian, OTHER, General, 3-alpha, Update on the cooling system problem 6x
After waiting for 1-2 hours. I started the BT again on T5 no tripping BT anymore. While writing hardware with DAS T5 responded well.

After starting the HT, i started a new run :

run #206
start @18h02
stop @18h15

the spectrum seem OK.

In both cooling systems the levels are still good, did we refilled the 0 degree cooling system since the beginning?

The vacuum is @ 9.1e-6 in M2C and 2e-5 in 0 degree chamber.

I then left the cooling ON, but stopped both HT and BT on every telescopes.

I join with this entry screenshots of :

- T5 spectra
- BT&HT current before stopping
- DAS window for X&Y
Fixed, e744, Mon May 7 10:42:58 2018, Valerian, OTHER, General, 60Co, Update on the cooling system and run gamma (signal problem on PPT) HT_EXL.pngEXL_spectra_run207.pngPPT_spectra_run207.pngEXL_spectra_run209.png
Today, both cooling system are working fine and their levels are OK.
The vacuum are 7e-6 mbar in M2C and 2e-5 in the 0 degree chamber.

I start a new gamma run :

run #207
trigger : EXL + PPT
start @10h44 07/05/18
stop @11h14 07/05/18
No signal on PPT. EXL OK.

I join to this entry a screenshot of EXL HT and EXL + PPT spectra

I start a new gamma run :

run #208
Bad run

run #209
trigger : EXL
start @11h21 07/05/18
stop @17h44 9/05/18
Fixed, e744, Thu May 24 01:02:19 2018, Valerian, OTHER, General, N/A, run #431 ED4_TD4_23-05-18_00-58.png
run #431
Trigger LISE
Beam in D4
start @ 00h36
stop @ 1h34
Pinned, e744, Thu May 24 21:13:29 2018, Valerian, TARGET, General, N/A, List of target present in M2C 
The list of target present in M2C chamber are the following :

6 -> CH2 : 187 um / 17.391 mg/cm2 (Georges) -> Full resonance spectra
5 -> CH2 : 100 um / 9.3 mg/cm2 (GoodFellow) -> On 1/2- resonance // ERROR THIS SEEMS TO BE THE SANDWICH TARGET
4 -> CH2 : 104 um / 9.672mg/cm2 (Georges) -> On 1/2- resonance
3 -> CH2 : 63 um / 5.859mg/cm2 (GoodFellow) -> Off 1/2- resonance
2 -> CH2 : 63 um / 5.859mg/cm2 (Georges) -> Off 1/2- resonance
1 -> C : 75 um / 16.9mg/cm2 (GoodFellow) -> Fusion evaporation background
Ongoing, e744, Fri May 25 23:15:57 2018, Valerian, OFFLINE, General, CH2, Oxygen 15 excitation function Exc_15O.pdf
After a quick analysis, we can conclude that MUST2 is working for resonant elastic scattering. We find a resolution of 125 keV which will improve with a better analysis, as we are using a basic calibration for CsI Energy.
Ongoing, e744, Sat May 26 03:23:46 2018, Valerian, OFFLINE, General, CH2, 15O excitation function as a function of ThetaLab Ex_15O.pdf
Ongoing, e744, Sat May 26 05:02:42 2018, Valerian, TARGET, General, CH2, Problem with the target for run 2004 and 2010 Target_Issue_2004_2010.pngtargets.jpg
The target seems identical between the two runs... We will have to investigate to understand what is going on.

The decision is to change the target 5 for the target 4 104um from georges.
The two spectras from run 2003 (target nr6) and 2010 (target nr 5) are identical. The peak at low energy correspond to the first excited state in 15F.


In the picture, target N°4 is written 104 µm
N°5 100 µm GoodFellow
N°6 187µm
Ongoing, e744, Sat May 26 20:20:55 2018, Valerian, OFFLINE, General, CH2, 15F observations for target 4 (100um) Ecm_Thetacm_target4_notes.pdfEx_15F_proj_0_4deg_Ecm_target4.pdfEx_0to40degEcm_15F.pdf
Analysis offline permits us to conclude that the current target has the good size to observe our resonances.
Ongoing, e744, Mon May 28 02:07:41 2018, Valerian, OFFLINE, General, CH2, New improved resolution for 14N et 15F Exc_15O_newpos.pdfExc_15F_newpos.pdf
After correcting position for the Must2 detectors by taking into account the real hit position on the target that was (0,15cm,0) and not (0,0,0). The way to do it was to artificially move every detector 15cm lower.

Joined are the results at 0deg, for 14N the resolution increases from 125keV to 102keV.