Ongoing, e744, Thu Apr 26 19:37:24 2018, Valerian and Freddy, MUST2, Hardware, N/A, Debug of Must2 telescopes 
|
Today we found different problems, no time on T4 and no signal on T5 and T6 CsI tripping. After changing cables and a lot of tests with the chamber open
and only the BT ON, T4 and T5 problems seemed to be fixed.
|
Fixed, e755, Fri Jun 22 11:14:01 2018, Valerian Pierre Adrien Fred Fairouz, MUST2, General, N/A, run 3061 Calimero T5-8X
|
[U][B]run 3061[/B][/U] Calimero T5-8X |
Fixed, e755, Sat Jun 23 18:01:58 2018, Valerian Maurycy, OFFLINE, General, Cryo-LH2, Kinematics Line   
|
Using Run 63-64 we drew Kinematics Lines. |
Ongoing, e744, Thu May 3 19:11:14 2018, Valerian Marlene and Francois, MUST2, General, 3-alpha, run 3 alpha T5
|
[U][B]run #196[/B][/U]
3 alpha source and pedestals supressed
Trigger T5 only |
Fixed, e744, Thu May 24 21:05:05 2018, Valerian Iulian and Francois, TARGET, Hardware, , 14N - 187um target placement
|
For resonant elastic scattering of 14N(pp)14N the 187um target is placed. |
Pinned, e744, Fri May 25 04:02:29 2018, Valerian Iulian Pedja and Cristina, OTHER, General, N/A, General power cut of ganil
|
Due to some water leaks, CSS1 CSS2 and CIME as the vacuum system of GANIL are down... Time loss could be considerable... They talked about beam possibility
in the morning but it seems unlikely. |
Ongoing, e744, Tue May 29 16:23:56 2018, Valerian Iulian Maurycy, OFFLINE, General, CH2, Hint of a 2p peaks
|
|
Pending, e744, Tue Apr 24 14:18:22 2018, Valerian Freddy and Adrien aka Cherry Mx Team, MUST2, Hardware, N/A, Current telescope-pcb layout
|
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
|
Fixed, e755, Sat Jun 23 14:07:40 2018, Valerian Fairouz, RUN, General, N/A, Problem from Narval
|
Narval actors went crazy see joined images
run 75 must be trash as it created 18 files of 4Go in 10 minutes :
|
Fixed, e744, Fri May 4 11:20:50 2018, Valerian, MUST2, General, 3-alpha, T5 : 0° telescope 
|
After increasing the voltage on T5 DSSD from 80V to 100V the resolution increased from ~40keV sigma to 20keV sigma.
StripX vs StripY bidim and the 3 alpha peaks are joined to this entry. |
Fixed, e744, Sun May 6 17:52:21 2018, Valerian, RUN, General, 3-alpha, Run #205 T1 T2 T3 & T4
|
[U][B]run #205[/B][/U]
T1 T2 T3 & T4 T5 still in trigger but no HT/BT
start @15h43
|
Ongoing, e744, Sun May 6 17:55:05 2018, Valerian, OTHER, General, 3-alpha, Update on the cooling system problem 6x
|
After waiting for 1-2 hours. I started the BT again on T5 no tripping BT anymore. While writing hardware with DAS T5 responded well.
After starting the HT, i started a new run :
|
Fixed, e744, Mon May 7 10:42:58 2018, Valerian, OTHER, General, 60Co, Update on the cooling system and run gamma (signal problem on PPT)   
|
Today, both cooling system are working fine and their levels are OK.
The vacuum are 7e-6 mbar in M2C and 2e-5 in the 0 degree chamber.
|
Fixed, e744, Thu May 24 01:02:19 2018, Valerian, OTHER, General, N/A, run #431
|
[U][B]run #431[/B][/U]
Trigger LISE
Beam in D4
|
Pinned, e744, Thu May 24 21:13:29 2018, Valerian, TARGET, General, N/A, List of target present in M2C
|
The list of target present in M2C chamber are the following :
6 -> [B]CH2 : 187 um[/B] / 17.391 mg/cm2 (Georges) -> Full resonance spectra
|
Ongoing, e744, Fri May 25 23:15:57 2018, Valerian, OFFLINE, General, CH2, Oxygen 15 excitation function
|
After a quick analysis, we can conclude that MUST2 is working for resonant elastic scattering. We find a resolution of 125 keV which will improve with a
better analysis, as we are using a basic calibration for CsI Energy. |
Ongoing, e744, Sat May 26 03:23:46 2018, Valerian, OFFLINE, General, CH2, 15O excitation function as a function of ThetaLab
|
|
Ongoing, e744, Sat May 26 05:02:42 2018, Valerian, TARGET, General, CH2, Problem with the target for run 2004 and 2010 
|
The target seems identical between the two runs... We will have to investigate to understand what is going on.
The decision is to change the target 5 for the target 4 104um from georges.
|
Ongoing, e744, Sat May 26 20:20:55 2018, Valerian, OFFLINE, General, CH2, 15F observations for target 4 (100um)  
|
Analysis offline permits us to conclude that the current target has the good size to observe our resonances. |
Ongoing, e744, Mon May 28 02:07:41 2018, Valerian, OFFLINE, General, CH2, New improved resolution for 14N et 15F 
|
After correcting position for the Must2 detectors by taking into account the real hit position on the target that was (0,15cm,0) and not (0,0,0). The way
to do it was to artificially move every detector 15cm lower.
|
|