MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 29 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Ongoinge744 Thu Apr 26 19:37:24 2018 Valerian and FreddyMUST2HardwareN/ADebug of Must2 telescopes
Today we found different problems, no time on T4 and no signal on T5 and T6 CsI tripping. After changing cables and a lot of tests with the chamber open and only the BT ON, T4 and T5 problems seemed to be fixed.

The CsI of T6 is still tripping but it will have to be tested with the chamber closed.

For a more precise explanation see the pdf in attachment.
Attachment 1: debug_mm_telescopes.pdf
debug_mm_telescopes.pdf debug_mm_telescopes.pdf debug_mm_telescopes.pdf
Attachment 2: Problem_on_T5_T6_cable_swap.pdf
Problem_on_T5_T6_cable_swap.pdf
Fixede755 Fri Jun 22 11:14:01 2018 Valerian Pierre Adrien Fred FairouzMUST2GeneralN/Arun 3061 Calimero T5-8X
run 3061 Calimero T5-8X
Attachment 1: Calimero_T56X.png
Calimero_T56X.png
Fixede755 Sat Jun 23 18:01:58 2018 Valerian MaurycyOFFLINEGeneralCryo-LH2Kinematics Line
Using Run 63-64 we drew Kinematics Lines.
Attachment 1: ELab_Theta_2H.pdf
ELab_Theta_2H.pdf
Attachment 2: ELab_Theta_3H.pdf
ELab_Theta_3H.pdf
Attachment 3: ELab_Theta_3He.pdf
ELab_Theta_3He.pdf
Attachment 4: ELab_Theta_4He.pdf
ELab_Theta_4He.pdf
Ongoinge744 Thu May 3 19:11:14 2018 Valerian Marlene and FrancoisMUST2General3-alpharun 3 alpha T5
run #196
3 alpha source and pedestals supressed
Trigger T5 only
Fixede744 Thu May 24 21:05:05 2018 Valerian Iulian and FrancoisTARGETHardware 14N - 187um target placement
For resonant elastic scattering of 14N(pp)14N the 187um target is placed.
Attachment 1: 20180524_210115.jpg
20180524_210115.jpg
Pinnede744 Fri May 25 04:02:29 2018 Valerian Iulian Pedja and CristinaOTHERGeneralN/AGeneral power cut of ganil
Due to some water leaks, CSS1 CSS2 and CIME as the vacuum system of GANIL are down... Time loss could be considerable... They talked about beam possibility in the morning but it seems unlikely.
Ongoinge744 Tue May 29 16:23:56 2018 Valerian Iulian MaurycyOFFLINEGeneralCH2Hint of a 2p peaks
Attachment 1: Two_proton_14Ovs12C.pdf
Two_proton_14Ovs12C.pdf
Pendinge744 Tue Apr 24 14:18:22 2018 Valerian Freddy and Adrien aka Cherry Mx TeamMUST2HardwareN/ACurrent telescope-pcb layout
Telescope 1 : PCB 5 (ref on pcb: 2274)
Telescope 2 : PCB 4
Telescope 3 : PCB 7
Telescope 4 : PCB 11 (ref on pcb: n°2834-9)

Telescope 5 : PCB 2 (ref on pcb: X2489-8) Backward angles
Telescope 6 : PCB 6 around 90d eg.
------------------------   ------------------------
                       /  \
                      /    \
        4            /      \            1
                    /        \
                   /          \ 
                  /            \
                 /              \
-----------------                -----------------
-----------------        x       -----------------
                 \     BEAM     /
                  \            /
                   \          /
        3           \        /         2
                     \      /
                      \    /
                       \  /
------------------------  ------------------------
Fixede755 Sat Jun 23 14:07:40 2018 Valerian FairouzRUNGeneralN/AProblem from Narval
Narval actors went crazy see joined images

run 75 must be trash as it created 18 files of 4Go in 10 minutes :

-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:54 run_0075.dat.23-06-18_12h56m41s
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:55 run_0075.dat.23-06-18_12h56m41s.1
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:55 run_0075.dat.23-06-18_12h56m41s.2
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:56 run_0075.dat.23-06-18_12h56m41s.3
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:57 run_0075.dat.23-06-18_12h56m41s.4
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:57 run_0075.dat.23-06-18_12h56m41s.5
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:58 run_0075.dat.23-06-18_12h56m41s.6
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:59 run_0075.dat.23-06-18_12h56m41s.7
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 13:59 run_0075.dat.23-06-18_12h56m41s.8
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:00 run_0075.dat.23-06-18_12h56m41s.9
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:00 run_0075.dat.23-06-18_12h56m41s.10
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:01 run_0075.dat.23-06-18_12h56m41s.11
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:02 run_0075.dat.23-06-18_12h56m41s.12
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:02 run_0075.dat.23-06-18_12h56m41s.13
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:04 run_0075.dat.23-06-18_12h56m41s.14
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:05 run_0075.dat.23-06-18_12h56m41s.15
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:06 run_0075.dat.23-06-18_12h56m41s.16
-r--r--r-- 1 e748 Exxx 4,0G 23 juin 14:07 run_0075.dat.23-06-18_12h56m41s.17
-rw-r--r-- 1 e748 Exxx 4,0G 23 juin 2018 run_0075.dat.23-06-18_12h56m41s.18
Attachment 1: narval_crash_problem.png
narval_crash_problem.png
Fixede744 Fri May 4 11:20:50 2018 ValerianMUST2General3-alphaT5 : 0° telescope
After increasing the voltage on T5 DSSD from 80V to 100V the resolution increased from ~40keV sigma to 20keV sigma.

StripX vs StripY bidim and the 3 alpha peaks are joined to this entry.
Attachment 1: StripX_vs_StripY_T5_100V.pdf
StripX_vs_StripY_T5_100V.pdf
Attachment 2: Si_E_T5_100V.pdf
Si_E_T5_100V.pdf
Fixede744 Sun May 6 17:52:21 2018 ValerianRUNGeneral3-alphaRun #205 T1 T2 T3 & T4
run #205
T1 T2 T3 & T4 T5 still in trigger but no HT/BT
start @15h43
stop @17h52
Ongoinge744 Sun May 6 17:55:05 2018 ValerianOTHERGeneral3-alphaUpdate on the cooling system problem
After waiting for 1-2 hours. I started the BT again on T5 no tripping BT anymore. While writing hardware with DAS T5 responded well.

After starting the HT, i started a new run :

run #206
start @18h02
stop @18h15

the spectrum seem OK.

In both cooling systems the levels are still good, did we refilled the 0 degree cooling system since the beginning?

The vacuum is @ 9.1e-6 in M2C and 2e-5 in 0 degree chamber.

I then left the cooling ON, but stopped both HT and BT on every telescopes.

I join with this entry screenshots of :

- T5 spectra
- BT&HT current before stopping
- DAS window for X&Y
Attachment 1: T5_vigru_after_cooling_issue.png
T5_vigru_after_cooling_issue.png
Attachment 2: BT_HT_part1.png
BT_HT_part1.png
Attachment 3: BT_HT_part2.png
BT_HT_part2.png
Attachment 4: BT_HT_part3.png
BT_HT_part3.png
Attachment 5: T5_das_after_cooling_issue_X.png
T5_das_after_cooling_issue_X.png
Attachment 6: T5_das_after_cooling_issue_Y.png
T5_das_after_cooling_issue_Y.png
Fixede744 Mon May 7 10:42:58 2018 ValerianOTHERGeneral60CoUpdate on the cooling system and run gamma (signal problem on PPT)
Today, both cooling system are working fine and their levels are OK.
The vacuum are 7e-6 mbar in M2C and 2e-5 in the 0 degree chamber.

I start a new gamma run :

run #207
trigger : EXL + PPT
start @10h44 07/05/18
stop @11h14 07/05/18
No signal on PPT. EXL OK.

I join to this entry a screenshot of EXL HT and EXL + PPT spectra

I start a new gamma run :

run #208
Bad run

run #209
trigger : EXL
start @11h21 07/05/18
stop @17h44 9/05/18
Attachment 1: HT_EXL.png
HT_EXL.png
Attachment 2: EXL_spectra_run207.png
EXL_spectra_run207.png
Attachment 3: PPT_spectra_run207.png
PPT_spectra_run207.png
Attachment 4: EXL_spectra_run209.png
EXL_spectra_run209.png
Fixede744 Thu May 24 01:02:19 2018 ValerianOTHERGeneralN/Arun #431
run #431
Trigger LISE
Beam in D4
start @ 00h36
stop @ 1h34
Attachment 1: ED4_TD4_23-05-18_00-58.png
ED4_TD4_23-05-18_00-58.png
Pinnede744 Thu May 24 21:13:29 2018 ValerianTARGETGeneralN/AList of target present in M2C
The list of target present in M2C chamber are the following :

6 -> CH2 : 187 um / 17.391 mg/cm2 (Georges) -> Full resonance spectra
5 -> CH2 : 100 um / 9.3 mg/cm2 (GoodFellow) -> On 1/2- resonance // ERROR THIS SEEMS TO BE THE SANDWICH TARGET
4 -> CH2 : 104 um / 9.672mg/cm2 (Georges) -> On 1/2- resonance
3 -> CH2 : 63 um / 5.859mg/cm2 (GoodFellow) -> Off 1/2- resonance
2 -> CH2 : 63 um / 5.859mg/cm2 (Georges) -> Off 1/2- resonance
1 -> C : 75 um / 16.9mg/cm2 (GoodFellow) -> Fusion evaporation background
Ongoinge744 Fri May 25 23:15:57 2018 ValerianOFFLINEGeneralCH2Oxygen 15 excitation function
After a quick analysis, we can conclude that MUST2 is working for resonant elastic scattering. We find a resolution of 125 keV which will improve with a better analysis, as we are using a basic calibration for CsI Energy.
Attachment 1: Exc_15O.pdf
Exc_15O.pdf
Ongoinge744 Sat May 26 03:23:46 2018 ValerianOFFLINEGeneralCH215O excitation function as a function of ThetaLab
Attachment 1: Ex_15O.pdf
Ex_15O.pdf
Ongoinge744 Sat May 26 05:02:42 2018 ValerianTARGETGeneralCH2Problem with the target for run 2004 and 2010
The target seems identical between the two runs... We will have to investigate to understand what is going on.

The decision is to change the target 5 for the target 4 104um from georges.
The two spectras from run 2003 (target nr6) and 2010 (target nr 5) are identical. The peak at low energy correspond to the first excited state in 15F.


In the picture, target N°4 is written 104 µm
N°5 100 µm GoodFellow
N°6 187µm
Attachment 1: Target_Issue_2004_2010.png
Target_Issue_2004_2010.png
Attachment 2: targets.jpg
targets.jpg
Ongoinge744 Sat May 26 20:20:55 2018 ValerianOFFLINEGeneralCH215F observations for target 4 (100um)
Analysis offline permits us to conclude that the current target has the good size to observe our resonances.
Attachment 1: Ecm_Thetacm_target4_notes.pdf
Ecm_Thetacm_target4_notes.pdf
Attachment 2: Ex_15F_proj_0_4deg_Ecm_target4.pdf
Ex_15F_proj_0_4deg_Ecm_target4.pdf
Attachment 3: Ex_0to40degEcm_15F.pdf
Ex_0to40degEcm_15F.pdf
Ongoinge744 Mon May 28 02:07:41 2018 ValerianOFFLINEGeneralCH2New improved resolution for 14N et 15F
After correcting position for the Must2 detectors by taking into account the real hit position on the target that was (0,15cm,0) and not (0,0,0). The way to do it was to artificially move every detector 15cm lower.

Joined are the results at 0deg, for 14N the resolution increases from 125keV to 102keV.
Attachment 1: Exc_15O_newpos.pdf
Exc_15O_newpos.pdf
Attachment 2: Exc_15F_newpos.pdf
Exc_15F_newpos.pdf

ELOG Home Page