Fixed, e744, Wed May 23 10:57:13 2018, megumi, DAQ, General, , Photo of the circuit 15x
|
photo of the circuit area |
Fixed, e744, Wed May 23 13:15:47 2018, megumi, DAQ, General, N/A, Time calibration for TDC (EXL)
|
Time calibrator setting
Range 5.12 us
Period 160 ns
RUN #406 : Time calibration for TDC ch 1,2,3,4,5,6,7,8
ch2 is missing...
RUN #407 : Time calibration for TDC ch 9,10,11,12,13,14,15,16
RUN #408 : Time calibration for TDC ch 17, 31, 32 (PPT, EXL17, EXL18)
but i cannot find those entry in the basic_online...
The calib parameters for EXL detector (energy+time) are:
EXL_E1 -71.1150 0.668983
EXL_E2 132.36 0.519247
EXL_E3 71.2 0.5649
EXL_E4 -58.9582 0.600488
EXL_E5 72.8547 0.579928
EXL_E6 -56.2703 0.598377
EXL_E7 91.2014 0.540216
EXL_E8 95.1007 0.488096
EXL_E9 9.26351 0.610848
EXL_E10 -2.42136 0.560869
EXL_E11 86.8976 0.503247
EXL_E12 105.457 0.464832
EXL_E13 45.8667 0.848081
EXL_E14 68.9514 0.792648
EXL_E15 2.84729 0.799
EXL_E16 18.4952 0.426236
EXL_E17 18.7380 0.485055
EXL_E18 116.032 0.492694
EXL_T1 0 1.73118
EXL_T2 0 1
EXL_T3 0 1.72242
EXL_T4 0 1.7302
EXL_T5 0 1.74106
EXL_T6 0 1.71348
EXL_T7 0 1.73504
EXL_T8 0 1.73337
EXL_T9 0 1.72332
EXL_T10 0 1.75605
EXL_T11 0 1.7177
EXL_T12 0 1.74387
EXL_T13 0 1.74781
EXL_T14 0 1.72464
EXL_T15 0 1.72852
EXL_T16 0 1.72436
EXL_T17 0 1
EXL_T18 0 1 |
Fixed, e744, Wed May 23 15:40:58 2018, Charles Houarner Valérie, MUST2, Software, N/A, TESTS MUVI internal pulser T1-T4 strips X    
|
To check the signals and trigger on T4 we used the internal pulser on T4,
from the SYNCHROTEST pulser at 150 Hz.
The signal was set on the channel 5 of each Mate of the MufeeX card of the T4 telescope:
MM4_STRX_E5, E21, E37, E53, E69, E85, e101, E117.
Figure testGeneInterneT4plotCh5Mate.png
The signal of the pulser can be seen around 9400 to 9850 on the several channels (see the zooms). the pedestal is large, around 8085 to 8100.
on the other channels see for instance the zoom on Strx_E118.
Pulser on channel 5 of 4 Mate of MufeeX TestMust2tel4matePulserInt.png
With the pulser only on channel 5 of Mate-1 of T4,
see the thinner pedestals on the other channels, in the plots:
TestMust2tel4PulserIntMate5.png
Checking the pedestals on the other telescopes: TestMust2telT1toT3andT5mat5onT4.png |
Fixed, e744, Wed May 23 15:42:04 2018, Louis, Valérie, MUST2, General, N/A, CALIMERO run 409 - XT - T1 to T4    
|
Started run #409
GMT triggers: GecoCalimeroMuviGMT.png
HT on cf : HTtelescopesMustsWed23May.png
Calimero TC 640ns; period 20ns
XT for T1 to T4 ampli pulser 12MeV
thresholds for telescopes T1 to T3, 400 keV except T4: Threshold 1MeV
cf GecoCalimeroMuviTel4Thr1MeV.png
problem of configuration:
cf configCalim1.png trigger must be external on the calimero pulser interface.
cf good one on the configCalimOkexterne.png (to be done for the next runs) |
Fixed, e744, Wed May 23 18:20:59 2018, e744, MUST2, General, N/A, Test Calimero Run 425
|
Started run #425 Calimero NEW XT T1toT4
ampl Pulser 12MEV; thr for T4 1 MeV
problem on data taking |
Fixed, e744, Wed May 23 23:37:14 2018, Valérie L., MUST2, General, N/A, MUVI configuration DAS 13x
|
Configurations files of the MUVI 1 MufeeX and Y.
On MufeeX and Y configuration:
Note that the thresholds on Must2 T1 to T3 is at 400 keV on May 23th Midnight (same as before); and for T4, now it is set at 1 MeV (not 400 keV).
On Muvi/CAS configuration :
+ suppression of Energy and time pedestals, see the page in two snapshot files, ConfigMANIPMUVI2CASTel1A.png ; ConfigMANIPMUVI1CASTelB.png
(all green; in contrast with time calib configuration :red squares cf for instance : configCalimMUVI2CASTel8.png)
+ ORDi
checking temperature on the Mufee MUST2 cards:
example of good temperature on card (around 4 to 8°C when the cooling sytem is set at -4°C) : ConfigDASMuvi1Tel5mufeeXokTemp.png
Example of temperature problem on card (cooling system not running correctly, bad situation on April 25th) : Problem25AprilTemptTel4mufeeX.png
Configuration of the modules of the second Slave crate which includes MUVI2, GMT slave and Centrum slave:
Must2Crate2GMTslave.png ; MUVIcrate2ConfigCentrumSlave.png |
Fixed, e744, Thu May 24 01:02:19 2018, Valerian, OTHER, General, N/A, run #431
|
run #431
Trigger LISE
Beam in D4
start @ 00h36
stop @ 1h34 |
Fixed, e744, Thu May 24 01:10:30 2018, iuliqn, RUN, General, , run 433 Lise trigger
|
Should be ql foil in front of the si detector.... |
Fixed, e744, Thu May 24 01:11:26 2018, Iulian Valerian, RUN, General, N/A, run 434 Lise trigger 
|
Cats inserted
efficiency is around ~99% |
Fixed, e744, Thu May 24 01:53:28 2018, iulian, RUN, General, N/A, run 438 Lise trigger 
|
run 438 D4 in
run 439 d6 in.
D4 D6 transmision with CATS in:
83425./106149.=7.85923560278476430e-01 |
Fixed, e744, Thu May 24 03:21:37 2018, iulian, OTHER, Hardware, N/A, Position measurements Must2/PPT/EXL
|
|
Fixed, e744, Thu May 24 03:57:34 2018, iulian, RUN, General, N/A, run 442 Lise trigger d6
|
|
Fixed, e744, Thu May 24 04:20:34 2018, iulian, RUN, General, N/A, run 443 T1-t5 triggers   
|
run 443
T1-T5 triggers
still problems to recover the counting on must2. Cats: 5000 pps , T5: 50 pps max
Below changes in tuning with little change in counting...
The energy for 14N7+ at the entrance of must2 should be 28.44 meV if the beam dump thickness is correct (34 um). If a dead layer of 0.5 um of Al is included, the energy became 27.849. This looks very close to what we see on X strip, and about 1 MeV off on Y strips. |
Fixed, e744, Thu May 24 12:01:54 2018, Valérie for Calimero team - Valérian, Fairouz, MUST2, General, , Bug server Calimero Run #447-449 12x
|
Calimero on ganp161
Telscopes T1 to T4 thresholds for T1 to T3 400 keV ; T4 : 1 MeV
ampli pulser 12 MeV
problem: stop calimero at 6%
Bad connection. |
Fixed, e744, Thu May 24 17:18:58 2018, Valérie for Calimero team : Valérian, Louis, MUST2, General, N/A, CALIMERO Tests Runs 451 to 452 (done in D6)  
|
Test runs for telescopes T1 to t4
Nb: The applied threshold is now 1 MeV but it seems to be not the case when we look at the spectra.
Maybe a problem of the read configuration in GECO.
Run 451 XT Pulser amplitude 9 MeV
Run 452 YT
NB: good configuration files are given in the next entry
See Notes signed by Valérie, checked by the team ! |
Fixed, e744, Thu May 24 17:23:57 2018, Valérie for Calimero team: Valérian, Louis, MUST2, General, N/A, CALIMERO Runs 453-457 OK 16x
|
Calimero on ganp1074 in D6
Time Calibrator Range: 640 ns; Period 20 ns Amplitude of pulser (test generator) 9MeV
Run 453 Telescope T5 (MUVI2-slave) XT see plot
Run 454 Telescope T5 (MUVI2-slave) YT blocked at 6% -->
NB: stop calimero, stop run, stop geco, load das (to have good config for Mate), reload Geco
(usual steps: Restart Calimero programs, start Run control, start Calimero in geco)
Run 455 Telescope T5 (MUVI2-slave) YT ok
Then stop Run, exit from Geco, load DAS, change configuration for T1 to T4.
Change configuration of Port in RCC Narval. see plot
Run 456 Telescopes T1 to T4 (MUVI1-Master) XT ok see plot
Run 457 Telescopes T1 to T4 (MUVI1-Master) YT ok see plot |
Fixed, e744, Thu May 24 19:05:41 2018, e744 team (shift Valérie), RUN, General, N/A, Runs 458 and 459  
|
Run 458
focalisation on D4 LISE
100Hz on Si Lise triggers: Cats1div (3 10**4) LISE
see scalers end of run
Run 459
same triggers as for Run458
focalisation on D6 |
Fixed, e744, Thu May 24 19:20:40 2018, e744 Must2 + Lise teams (edit: Valérie), RUN, General, N/A, Run 460-Spiral 14N test  
|
Run 460
Triggers Must2 Telescopes T1 to T5
( MM1 to MM5)
checking beam focalisation and centering on Must5
see plot
cf scalers during Run |
Fixed, e744, Thu May 24 19:32:31 2018, e744 Must2 + Lise teams (edit: Valérie), RUN, General, N/A, Run 461-Spiral 14N test 
|
Run 461
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
after retuning of the beam (on PR62)
checking beam focalisation and centering on Must5
see plot
cf scalers during Run |
Fixed, e744, Thu May 24 19:34:40 2018, e744 Must2 + Lise teams, RUN, General, N/A, tuning Wien-Spiral 14N test
|
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
see plot of beam impact Wien filter +0.4 kV, +0.4 kV