Fixed, e748, Mon Jul 3 18:45:41 2017, Valérie L, DAQ, General, N/A, Checking ALL RUNS with Ganil_Tape  GanilTapeRun207.pngMessageRunControlNArval.pngRunControlOnNarvalAllWatcher.png
The problems with the runs which could not be converted during the night was due
to a double header buffers of the runs with an odd number.
Now it affects sometimes also runs with even numbers cf 206 below.
Fixed, e748, Mon Jul 3 19:59:02 2017, Valérie L, RUN, General, CD2, Series of runs - afternoon/evening 3rd July 

Series of runs during the afternoon with the tuning of the ChIo and the tuning of the line
-------------------------------------------------------------------------------------------------------
Fixed, e748, Mon Jul 3 20:29:56 2017, Valérie L, RUN, General, CD2, Data runs after LISE tuning ScalersRun222trigPlastCATS1.png
The beam was tuned by the LISE team.
Beam conditions during the run 222 were changed to increase the beam at 1ľA.
Beam rate on CATS: 9000/s; Plastic 24000/s FAG ~300/s.
Fixed, e748, Mon Jul 3 21:41:57 2017, Valérie L, RUN, General, CD2, Runs 225-227 Run225l3julyScalerAnalyzer3ľA.png
---------------------------------------------------------------------------------
3 ľA at 21h25 ; CAVIAR D6 28000/s
CATS 20000/s
Fixed, , Mon Jul 3 22:10:28 2017, Valérie L, CATS, Hardware, CD2, VXI CATS crate problem solved  VisuCATproblemTerm.pngVXICATSreset.png
We had problems with CATS VME/VXI crate.
It was idle and it was not possible to restart it by breakup and init. 
We enter in the room to reset the ganlx7 of CATS.
Fixed, e748, Mon Jul 3 22:24:05 2017, Valérie L, RUN, General, CD2, Run series of problems 3rd July  
The daq was unstable with several problems of the merge from LISE.
We did tk kna (kill narval process) and na.
but the next run was starting still unstable with Error from the merge
Fixed, e748, Mon Jul 3 23:06:24 2017, Valérie L, RUN, General, CD2, Problem during Run 230-231 with CATS ResetEventCounterAfterRun230Centrum.pngPRoblemRun230.pngScalersRUn230.png
r-- 1 e748 Exxx   34013184  3 juil. 22:52 run_0230.dat.03-07-17_22h46m03s
-rw-r--r-- 1 e748 Exxx   97910784  3 juil. 23:09 run_0231.dat.03-07-17_22h54m42s
Fixed, e748, Mon Jul 3 23:16:33 2017, Valérie L, DAQ, General, CD2, Change of TAC RANGES (from run 230) 
TAC range changed after run 229.
NB: Change applied for Runs 230 and 231 
BUT these runs are not working due to problems of Merger
Fixed, , Tue Jul 4 00:53:18 2017, Valérie L, RUN, General, CD2, Runs with merge and time out problems 
-r--r--r-- 1 e748 Exxx     720896  3 juil. 21:55 run_0226.dat.03-07-17_21h54m51s
-rw-r--r-- 1 e748 Exxx     786432  3 juil. 21:56 run_0227.dat.03-07-17_21h55m56s
-r--r--r-- 1 e748 Exxx   57016320  3 juil. 22:16 run_0228.dat.03-07-17_22h12m59s
Fixed, , Tue Jul 4 00:54:41 2017, Valérie L, RUN, General, CD2, Runs after reset of VXI 

VXI CHIO was offline --> reset of ganlx9  (entering in D6) on the VXI crate 
Fixed, e748, Tue Jul 4 01:00:26 2017, Valérie L, RUN, General, CD2, Run 239 test with trigger MUST2 
Started run #239 4JULY start 00h59 stop 1h15
PROBLEM junk header checked with Ganil Tape
triggers only MUST2 IN1 to IN8
Fixed, e748, Tue Jul 4 01:17:35 2017, Valérie L, RUN, General, CD2, Run 240 
Run #240 4JULY start  1h17
(run ok checked with Ganil_Tape)
 All triggers   MUST2 IN1 to IN8, 
Fixed, e748, Wed Jul 5 00:29:06 2017, Valérie L, RUN, General, CD2, Summary of the evening runs 322(e748chio)-323 (e748) RunControlChIoRun322.pngRunControlRun323.png
============================================================================================================
[e748'@ganp616 run]$ cd /data/e748chioX/e748chio/acquisition/run
-r--r--r-- 1 e748chio Exxx 4194288609  4 juil. 20:33 run_0322.dat.04-07-17_19h26m13s
Fixed, e748, Wed Jul 5 00:40:36 2017, Valérie L, RUN, General, CD2, Overview of the evening config 322(e748chio)-323 (e748) ScalersRun323e748at0h48.pngConfigCEntrumE748.pngPulserChIoForScalerDAQ.png
BEAM conditions
CAVIAR LISE 35k
GMT TRiggers:
Fixed, e748, Wed Jul 5 00:58:43 2017, Valérie L, RUN, General, CD2, Overview of the evening plots Run323-e748 (Run 322 chio) 19x
Run 323 DAQ E748; Run 322 DAQ CHIO see plots below.

Run 323 
Fixed, e748, Wed Jul 5 03:35:53 2017, Valérie L, RUN, General, CD2, SiLi 1/T5 trip 
AT 3h30 we saw that the SiLi1 of T5 has tripped during the run run_0323.dat.04-07-17_19h25m59s.2 (run started at 2h22)

We put it On again. HV 400V I~ 6.5 ľA
Fixed, e748, Wed Jul 5 04:55:06 2017, Valérie L, RUN, General, CD2, Scalers and summary of Run 323 at 4h55-7h30 ScalersRun323AT4h54.pngRunControlBuffer5julyAt6h.png
E748 Runs (around 3h30 for 1Go)

Run 323_2  started at 2h22 stop 5h56
Fixed, e748, Wed Jul 5 08:10:03 2017, Valérie L, RUN, General, CD2, Run 325 DAQ 748- run 325 DAQ ChIo Run325DAQE748daqChIo.pngRun325ChioDigET.pngScalerAnalyserRun325at8h30.pngGMTtriggerAllRun325.png
We stopped the run 323 (DAQ E748) and run 322 (ChIo) when the beam was stopped by the machine during 10 minutes to check the beam intensity.

The run numbers for DAQ E748 and DAQ ChIo were realigned to 325 for both.
Fixed, e748, Wed Jul 5 09:22:16 2017, Valérie L, RUN, General, CD2, Run 326DAQ- Run 326Chio Run326controlBuffer.pngScalerAnalyzerRun326.pngProblemCaviarEndOfRun326.png
Run 325 start at 9h19
We are running again after some change -switching on- of the power supply of the ChIo cathode).
End of run problem with the Caviar VME CPU seen offline.
Fixed, e748, Wed Jul 5 10:54:09 2017, Valérie L, RUN, General, CD2, SiLi 1/T5 trip 
AT 10h50 we saw that the SiLi1 of T5 has tripped during the run run_0328.dat.  (run started at 10h15 )

We put it On again. HV 400V I~ 10 ľA increasing to 24-25ľA