Fixed, e744, Sat May 26 00:38:38 2018, e744 all night shift teams, (edit) Valérie, RUN, General, CH2, Run 2010 20x
|
RUN 2010
Date : 26/05/2018 00:37:44
Target n°5 CH2 100 µm
|
Fixed, e744, Sat May 26 01:41:19 2018, e744 night shift team, edit valérie, DAQ, General, CH2, summary GMT, DAS config since run2005   
|
Triggers: all except LISE
IN1 to IN5 : MM1 to MM5;
|
Fixed, e744, Sat May 26 02:39:18 2018, Mihai, Pedja, RUN, General, CH2, Run 2011, Target n°5 9x
|
RUN 2011
Date : 26/05/2018
Beam used: 14O
|
Ongoing, e744, Sat May 26 03:23:46 2018, Valerian, OFFLINE, General, CH2, 15O excitation function as a function of ThetaLab
|
|
Fixed, e744, Sat May 26 04:24:16 2018, Mihai, Pedja, RUN, General, CH2, Run 2012, Target n°5
|
RUN 2012
Date : 26/05/2018
Beam used: 14O
|
Ongoing, e744, Sat May 26 05:02:42 2018, Valerian, TARGET, General, CH2, Problem with the target for run 2004 and 2010 
|
The target seems identical between the two runs... We will have to investigate to understand what is going on.
The decision is to change the target 5 for the target 4 104um from georges.
|
Fixed, e744, Sat May 26 05:16:12 2018, Iulian Valerian, pedja, mihai, TARGET, General, CH2, Target change
|
Target No 4 is placed in-beam 5h15. |
Fixed, e744, Sat May 26 05:23:12 2018, Mihai, Pedja, RUN, General, CH2, Run 2013, Target n°4 
|
RUN 2013
Date : 26/05/2018
Beam used: 14O
|
Fixed, e744, Sat May 26 05:51:00 2018, Mihai, Pedja, RUN, General, CH2, Run 2014, Target n°4 9x
|
[U][B]RUN 2014[/B][/U]
Date : 26/05/2018
Beam used: 14O
|
Fixed, e744, Sat May 26 06:05:13 2018, Iulian Valerian Pedjia, TARGET, General, CH2, Target issue No5
|
In the attached figure it could be seen that with the target No5 (run 2010) lower energy resonances were visible (lower part of the figure), which is not
the case with the target No4 (upper part)from run 2013.
|
Ongoing, e744, Sat May 26 07:03:12 2018, Valerian and Iulian and Francois, OFFLINE, General, CH2, First picture for 15F from runs 2010-2013 
|
Target -> Thick target (Sandwich target ??)
The predictions are different....
|
, , Sat May 26 07:20:03 2018, , , , ,
|
|
Ongoing, e744, Sat May 26 07:32:17 2018, Valerian, pedja, mihai, RUN, General, CH2, Run 2015 after vacuum problem of Css1 target 4
|
[U][B]Run 2015[/B][/U]
26/05/18
start @7h29
|
Fixed, e744, Sat May 26 09:33:48 2018, Giuseppe, Dieter, RUN, General, CH2, run 2015  
|
Missing strips:
x
MM1 1
|
Fixed, e744, Sat May 26 10:03:37 2018, Giuseppe, Dieter, RUN, General, , run 2016& 2017
|
Problems with the ACQ (merger), they were solved by making Breakup and Init
|
Ongoing, e744, Sat May 26 10:06:06 2018, Giuseppe, Dieter, RUN, General, CH2, Run 2018  
|
Run 2018
Start @ 09:56 26/05/2018
Stop @ 10:51 |
Fixed, e744, Sat May 26 11:19:37 2018, Giuseppe, Dieter, RUN, General, CH2, interruption due to to waterleak ibn CSS1
|
10:50 h Water leak at CSS1
cryo pumps have to be regenerated
continuation until the expert intervention starts is possible
|
Fixed, e744, Sat May 26 11:42:03 2018, Giuseppe, Dieter, RUN, General, CH2, run 2019 
|
Run 2019
|
Pending, e744, Sat May 26 13:22:08 2018, Francois, BEAM, General, , problem with CSS1
|
There is a leakage of water in cavity north of cyclotron CSS1. I discussed with Alain Savale.
[B]There are 2 options:[/B]
|
Fixed, e744, Sat May 26 14:03:27 2018, Giuseppe, Dieter, J. Eric, RUN, General, CH2, Run 2020 9x
|
run 2020
|
|