Fixed, e744, Sat May 26 00:38:38 2018, e744 all night shift teams, (edit) Valérie, RUN, General, CH2, Run 2010 20x
RUN 2010
Date : 26/05/2018 00:37:44
 Target n°5  CH2 100 µm 
Fixed, e744, Sat May 26 01:41:19 2018, e744 night shift team, edit valérie, DAQ, General, CH2, summary GMT, DAS config since run2005 chronoGMTmasterRun14O.pngchronogramGMTslave_Run14O.pngConfigDASThresMUST2at1MeV.pngConfigTDCTestParamInpectch0.png
 Triggers: all except LISE

IN1 to IN5 : MM1 to MM5;
Fixed, e744, Sat May 26 02:39:18 2018, Mihai, Pedja, RUN, General, CH2, Run 2011, Target n°5 9x
RUN 2011
Date : 26/05/2018 
Beam used: 14O
Ongoing, e744, Sat May 26 03:23:46 2018, Valerian, OFFLINE, General, CH2, 15O excitation function as a function of ThetaLab Ex_15O.pdf
 
Fixed, e744, Sat May 26 04:24:16 2018, Mihai, Pedja, RUN, General, CH2, Run 2012, Target n°5 Scalers_start_run2012.png
RUN 2012
Date : 26/05/2018 
Beam used: 14O
Ongoing, e744, Sat May 26 05:02:42 2018, Valerian, TARGET, General, CH2, Problem with the target for run 2004 and 2010 Target_Issue_2004_2010.pngtargets.jpg
The target seems identical between the two runs... We will have to investigate to understand what is going on.

The decision is to change the target 5 for the target 4 104um from georges.
Fixed, e744, Sat May 26 05:16:12 2018, Iulian Valerian, pedja, mihai, TARGET, General, CH2, Target change 
Target No 4 is placed in-beam 5h15.
Fixed, e744, Sat May 26 05:23:12 2018, Mihai, Pedja, RUN, General, CH2, Run 2013, Target n°4 Scalers_start_run2013.pngRun2014MM_IMPACT5h53.png
RUN 2013
Date : 26/05/2018 
Beam used: 14O
Fixed, e744, Sat May 26 05:51:00 2018, Mihai, Pedja, RUN, General, CH2, Run 2014, Target n°4 9x
[U][B]RUN 2014[/B][/U]
Date : 26/05/2018 
Beam used: 14O
Fixed, e744, Sat May 26 06:05:13 2018, Iulian Valerian Pedjia, TARGET, General, CH2, Target issue No5 Target_Issue_2004_2010_corrected_withGeorgesTarget.png
In the attached figure it could be seen that with the target No5 (run 2010) lower energy resonances were visible (lower part of the figure), which is not
the case with the target No4 (upper part)from run 2013.
Ongoing, e744, Sat May 26 07:03:12 2018, Valerian and Iulian and Francois, OFFLINE, General, CH2, First picture for 15F from runs 2010-2013 Ex_15F_proj_0_8deg_17_27.pdfsig_theo.jpg
Target -> Thick target (Sandwich target ??)

The predictions are different....  
, , Sat May 26 07:20:03 2018, , , , ,  
 
Ongoing, e744, Sat May 26 07:32:17 2018, Valerian, pedja, mihai, RUN, General, CH2, Run 2015 after vacuum problem of Css1 target 4 Scalers_start_run2015.png
[U][B]Run 2015[/B][/U] 
26/05/18
start @7h29
Fixed, e744, Sat May 26 09:33:48 2018, Giuseppe, Dieter, RUN, General, CH2, run 2015 MUST2_end_run2016.pngScalers_stop_run2015.pngMUST2_y_ongoing_run2018.png
Missing strips:
x
MM1 1
Fixed, e744, Sat May 26 10:03:37 2018, Giuseppe, Dieter, RUN, General, , run 2016& 2017 


Problems with the ACQ (merger), they were solved by making Breakup and Init
Ongoing, e744, Sat May 26 10:06:06 2018, Giuseppe, Dieter, RUN, General, CH2, Run 2018 Scalers_start_run2018.pngScalers_stop_run2018.pngMM_IMPACT_stop_run2018.png
Run 2018 
Start @ 09:56 26/05/2018
Stop @ 10:51
Fixed, e744, Sat May 26 11:19:37 2018, Giuseppe, Dieter, RUN, General, CH2, interruption due to to waterleak ibn CSS1 
10:50 h Water leak at CSS1
        cryo pumps have to be regenerated
        continuation until the expert intervention starts is possible
Fixed, e744, Sat May 26 11:42:03 2018, Giuseppe, Dieter, RUN, General, CH2, run 2019 scalers_start_run2019.pngscalers_stop_run2019.png
Run 2019

Pending, e744, Sat May 26 13:22:08 2018, Francois, BEAM, General, , problem with CSS1 
There is a leakage of water in cavity north of cyclotron CSS1. I discussed with Alain Savale. 

[B]There are 2 options:[/B]
Fixed, e744, Sat May 26 14:03:27 2018, Giuseppe, Dieter, J. Eric, RUN, General, CH2, Run 2020 9x
run 2020