Status |
ExpNbr |
Date |
Author |
Type |
Category |
Target-Source |
Subject |
Fixed | e744 |
Fri May 4 11:20:50 2018 |
Valerian | MUST2 | General | 3-alpha | T5 : 0° telescope |
After increasing the voltage on T5 DSSD from 80V to 100V the resolution increased from ~40keV sigma to 20keV sigma.
StripX vs StripY bidim and the 3 alpha peaks are joined to this entry. |
Attachment 1: StripX_vs_StripY_T5_100V.pdf
|
|
Attachment 2: Si_E_T5_100V.pdf
|
|
Fixed | e744 |
Fri May 4 23:58:07 2018 |
iulian | RUN | General | 3-alpha | Run #203 alfa source & 60co source |
run #203
alpha source & 60co source
start 23h56
stop 11h07 |
Attachment 1: run_203_ht.png
|
|
Attachment 2: run_203_ppt.png
|
|
Attachment 3: run_203_EXL.png
|
|
Attachment 4: run_203_must2.png
|
|
Fixed | e744 |
Sun May 6 17:52:21 2018 |
Valerian | RUN | General | 3-alpha | Run #205 T1 T2 T3 & T4 |
run #205
T1 T2 T3 & T4 T5 still in trigger but no HT/BT
start @15h43
stop @17h52 |
Fixed | e744 |
Mon May 7 10:42:58 2018 |
Valerian | OTHER | General | 60Co | Update on the cooling system and run gamma (signal problem on PPT) |
Today, both cooling system are working fine and their levels are OK.
The vacuum are 7e-6 mbar in M2C and 2e-5 in the 0 degree chamber.
I start a new gamma run :
run #207
trigger : EXL + PPT
start @10h44 07/05/18
stop @11h14 07/05/18
No signal on PPT. EXL OK.
I join to this entry a screenshot of EXL HT and EXL + PPT spectra
I start a new gamma run :
run #208
Bad run
run #209
trigger : EXL
start @11h21 07/05/18
stop @17h44 9/05/18 |
Attachment 1: HT_EXL.png
|
|
Attachment 2: EXL_spectra_run207.png
|
|
Attachment 3: PPT_spectra_run207.png
|
|
Attachment 4: EXL_spectra_run209.png
|
|
Fixed | e744 |
Thu May 10 14:38:41 2018 |
iulian | EXL-PPT | Hardware | N/A | Mesytech settings |
Tried unsuccessfully to change the gain on EXL energies.
Looking at the inspection lines noticed that all the EXL signals were inverted (negative) and we were coding only the pole zero part of the signals.
Looking into the manual find out how to change polarity of the signals. Did that and now the signals look normal with normal gain change after polarity change.
EXL polarity is negative so Mesytech modules have to be set to use negative input signals.
|
Fixed | e744 |
Thu May 10 15:06:44 2018 |
iulian & valerian | EXL-PPT | General | 60Co | Started run #211 & #212 #213 60Co source efficiency run |
Run #211 BAD Run no BT
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @15h05 10/05
stop @10h38 11/05
Run #212 BAD Run threshold changed
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @12h19 11/05
stop @13h14 11/05
Run #213
60Co source efficiency run EXL & PPT trigger. Gains and thresholds set
start @13h20 11/05
stop @8h20 12/05
QDCTDC_VOIE_0 -> PPT_E
This run used e744_12mai_founctione.das config (looks corrupted for must2 as no y energies) |
Attachment 1: PPT_spectra_run213.png
|
|
Attachment 2: EXL_spectra_run213.png
|
|
Fixed | e744 |
Sat May 12 08:54:42 2018 |
iulian | MUST2 | General | 3-alpha | Run #114 T1-T5 trigger 3alpha source calib run |
Run #214
Trigger T1-T5 & gamma
3 alpha run
start @8h15m55s 12/05
stop @20h01 12/05
This run use new das config copied from e744_save04mai_fonctionne.das, updated and then re-saved to e744_save12mai_fonctionne.das
The previous config , saved now under the name e744_save12mai.das, gives no Y energies in the spectras and an error on Muvi2 (some register different) |
Attachment 1: Must_spectra_start_run214.png
|
|
Attachment 2: Must_spectra_stop_run214.png
|
|
Fixed | e748 |
Mon May 14 10:49:47 2018 |
François | DAQ | Software | | TDC problem |
Problem :
TDC labels are 0. After the compilation of action list the labels seem to appear (if I remember correctly), but after a save/reload of the config they are gone, and in all cases no event coded (on the oscilloscope a validation point is visible, but do not know what this means in the case of a TDC – even after looking in GANIL wiki related doc).
Solution :
Solved by Fred. He made "init" at the VME MUST2MASTER in the RCC. |
Fixed | e744 |
Mon May 14 13:52:25 2018 |
François | BEAM | General | | Profileur |
Normalement, les profileurs devraient voir le faisceau.
En général, la fenêtre d’entrée est de 12µm de titane et il y a une plaque d’alu de 3mm en sortie.
Donc il y a une plaque d’arrêt sur le dernier profileur.
Mais même si c’est une feuille d’inox en sortie, le faisceau ne devrait pas sortir.
(Antony Dubois) |
Attachment 1: Sans_titre.jpg
|
|
Fixed | e744 |
Tue May 15 19:42:40 2018 |
Valérian | EXL-PPT | General | 60Co | Calibration of EXL from e748 data |
The EXL calibration program is ready. Join is the result with previous data from e748. |
Attachment 1: EXL_Sum_e748_Calib.png
|
|
Fixed | e744 |
Wed May 16 11:30:21 2018 |
iulian | EXL-PPT | General | 60Co | run 302 60Co source |
Run #302
60 Co source PPT & EXL trigger
1start 21h46m40s 15/05
stop 10h 16/05 |
Fixed | e744 |
Wed May 16 16:27:29 2018 |
e744, lama, beyhan | OTHER | Hardware | | TACS from LISE to the exp DAQ |
The following TACs signals from LISE have been cabled and send to the experimental acquisition (->D6)
TED4_HF (cable physically labeled 29 of the ADC)
TE2D6_HF (cable physically labeled 30 of the ADC)
--> They should be added to the DAS when possible
NOTE that TE1D6_HF (cable physically labeled 31 of the ADC) was already cabled |
Fixed | e744 |
Wed May 16 17:03:18 2018 |
Ruxandra | EXL-PPT | Software | | calibration |
Calibration coefficients for the PPT detector using the 60Co and 40K lines: E=0.5514*ch - 83.322. Internal radioactivity at 1444 keV, not separated from 40K
Efficiency: During the run (21h46min40s) the number of gammas emitted from the 60Co source is 66796800; for the Co pics the integrals are: 2.71e05 for the 1173.2 and 1.87e05 for the 1333, respectively (0.4% and 0.3%) without geometrical factor |
Fixed | e744 |
Wed May 16 17:14:20 2018 |
e744, lama, beyhan | OTHER | Hardware | | setting of signals from LISE to exp. DAQ |
We put the following signals from LISE on DAQ :
(counting channels from 1)
E_D4 channel 17
E1_D6 channel 18
E2_D6 channel 19
T_D4 channel 20
T1_D6 channel 21
T2_D6 channel 22
tomorrow : set individual triggers of the ADC (OR of T_D4, T1_D6 and T2_D6)
(need to build a cable...) |
Fixed | e744 |
Wed May 16 18:01:47 2018 |
Iulian Valerian | MUST2 | Software | N/A | First successful Calimero run on T1 voie X run 316 |
First successful Calimero run on T1 voie X run 316 |
Attachment 1: Calimerro_run316.png
|
|
Fixed | e744 |
Wed May 16 19:06:39 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #318 Calimero T1-T4 strips X |
Run #318
Calimero T1-T4 X |
Attachment 1: Calimerro_run318.png
|
|
Attachment 2: Calimerro_T4_X_strip2_run319.png
|
|
Attachment 3: Calimerro_T2_X_strip12_run319.png
|
|
Fixed | e744 |
Wed May 16 20:26:48 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #319 calimero T1-T4 Y strips |
run #319
calimero T1-T4 Y strips |
Attachment 1: Calimerro_run319.png
|
|
Fixed | e744 |
Wed May 16 20:36:40 2018 |
Iulian Valerian | MUST2 | Software | N/A | run #320 Calimero T5 X |
run #320
Calimero T5 X |
Attachment 1: Calimerro_run320.png
|
|
Fixed | e744 |
Wed May 16 20:42:43 2018 |
Iulian Valerian | MUST2 | Software | N/A | Run #321 Calimero T5 Y strips |
Run #321
Calimero T5 Y strips |
Attachment 1: Calimerro_run321.png
|
|
Fixed | e744 |
Fri May 18 10:47:37 2018 |
Ruxandra | EXL-PPT | Hardware | 60Co | Co60 caliibration |
Thu May 17 . run 339
60Co calibration
start @19h26 17/05/18
stop @7h39 18/05/18
EXL + PPT trigger |