Fixed, e755, Tue Jun 26 20:33:17 2018, daisuke, TARGET, Hardware, Cryo-LH2, Liquid hydrogen target logger
|
|
Fixed, e755, Wed Jun 27 09:26:32 2018, daisuke, TARGET, Hardware, Cryo-LH2, Liquid hydrogen target logger (end of 38Ca)
|
|
Ongoing, e738, Wed Jun 27 17:42:14 2018, daisuke, OTHER, General, N/A, Toward E738    
|
|
Fixed, e755, Thu Jun 28 01:26:34 2018, daisuke, TARGET, Hardware, Cryo-LH2, Liquid hydrogen target logger 6x
|
|
Fixed, e755, Fri Jun 29 17:43:46 2018, daisuke, TARGET, General, Cryo-LH2, liquid hydrogen target logger 10x
|
last update at 6 am on June 30 |
Fixed, e755, Mon Jul 2 01:01:15 2018, daisuke, TARGET, General, Cryo-LH2, cryogenic target logger  
|
|
Ongoing, e738, Mon Jul 2 01:29:58 2018, daisuke, OTHER, General, N/A, Q values 
|
Reaction : 9C(1H,3H)7C Q -29.5098 MeV Ex 0 MeV
9C Z 6 A 9 Mass excess 28911.0 keV
|
Fixed, e755, Tue Jul 3 18:19:30 2018, daisuke, OTHER, General, N/A, Data saved after experiment 7x
|
DAS: /home/e748/ganacq_manip/e755/das-save/2018-07-03_fin_e755
VIGRU: /home/e748/analysis/GRU/GRU_18_03_12/vigru_e755_final_2018-07-03_18h15.xml
Online: /home/e748/analysis/nptool/Projects/e755/online/2018-07-03_18h24
|
Pinned, e738, Wed Jul 4 17:10:28 2018, daisuke, DAQ, Software, N/A, Second VXI for CATS and syncrhonisation diagnosis 8x
|
Second VXI crate was addedd for CATS. If the synchronisation is not working, there will be error messages in the display of the chassis in trouble (Desktop
IOLAN).
|
Fixed, e738, Wed Jul 4 18:43:29 2018, daisuke, RUN, General, 3-alpha, RUN 244   
|
3 alpha source at 'off-beam-axis' position (right center view from upstream). FAG ~40 Hz (mostly from T1-4) |
Fixed, e738, Thu Jul 5 19:22:18 2018, daisuke, RUN, General, 3-alpha, RUN 256   
|
3 alpha measurement after merging CAVIAR vme to the DAQ |
Pinned, e738, Thu Jul 5 19:26:31 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT   
|
|
Pinned, e738, Fri Jul 6 09:40:04 2018, daisuke, OTHER, General, N/A, kinematics plots  
|
|
Fixed, e738, Fri Jul 6 17:14:50 2018, daisuke, ONLINE, Software, N/A, Online analysis code: e755.detector  
|
The file e755.detector was updated to include the following parameters to ModularLeaf.
|
Fixed, e738, Sat Jul 7 08:16:50 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT   
|
|
Pinned, e738, Sat Jul 7 08:29:53 2018, daisuke, OTHER, Social, N/A, Shift table
|
https://docs.google.com/spreadsheets/d/1jyfw2LT3RGfDY4bcN-9zepZoe2uE89b5CnF4tXzqzj8/edit#gid=716299251 |
Fixed, e738, Sat Jul 7 19:47:21 2018, daisuke, MUST2, Hardware, N/A, MUST2 BT/HT    
|
|
Pinned, e738, Sun Jul 8 21:05:50 2018, daisuke, OTHER, General, N/A, Phase space simulation: 10C(p,t)8C and 9C(p,d)8C 
|
|
Fixed, e738, Tue Jul 10 16:28:53 2018, daisuke, OTHER, Social, N/A, 6Li(p,d)5Li   
|
The peak near 16 MeV was observed in a measurement in the 1960s. The resonance is close to the 3He-d threshold. The narrow width indicates a binary cluster
of 3He and d formed in 5Li.
|
Fixed, e738, Tue Jul 10 18:23:01 2018, daisuke, OTHER, Social, N/A, mirror reaction of 7Be(p,d)6Be 
|
|
|