  MUST2, Page 19 of 48  Not logged in MUST2
Status ExpNbr Date Authordown Type Category Target-Source Subject
Fixede744 Tue Apr 24 16:22:08 2018 e744 Valérie L.RUNSoftware Narval Merger Parameters
Attachment 1: ConfigRunControlNArvalMerger.png
ConfigRunControlNArvalMerger.png
Fixede744 Wed Apr 25 20:47:59 2018 e744 ValérieMUST2General MUST2 mate Temperature on the DAS interface
tests
The plot:ConfigDASMuvi1Tel4mufeeX.png shows the situation on the Mufee card when the cooling system was blocked (ice in the tube! there was water inside instead of alcohol) on Wednesday 25th. cf there was 47°C on MufeeX mate of Telescope 4.
The voltages on Must2 tripped, due to the increase of temperature on the Mates. After fixing the problem, the Mate temperatures were decreasing from 40-47°C to 19°C when the system was running again in normal temperature conditions (cooling system running well again, at -10°C).

The second one ConfigDASMuvi1Tel5mufeeXokTemp.png (Telescope 5) shows Mate for Tel.5 with T around 19°C.

When the temperature is set at -10°C on the cooling machine, and when we run in normal conditions, after stabilizing the temperature inside the chamber, the standard conditions on the Mates are around 7-12°C (depending on the position of the telescope on the chain of cooling tubes, close or not to the entrance or exit tubes).
To read the temperatures on the Mate, we need to have the low voltages on, and the software Das online.
Attachment 1: ConfigDASMuvi1Tel4mufeeX.png
ConfigDASMuvi1Tel4mufeeX.png
Attachment 2: ConfigDASMuvi1Tel5mufeeXokTemp.png
ConfigDASMuvi1Tel5mufeeXokTemp.png
Fixede744 Mon Apr 23 11:33:53 2018 e744 ValerianOTHERHardwareN/AInspection signals
Inspection signals between D6 and LISE Acquisition room are connected as follow :

178: FAG

179: LT ADC 1
180: LI1 ADC 1
181: AI ADC 1

182: LT ADC 2
183: LI1 ADC 2
184: AI ADC 2

185: HF validated
186: CATS delayed
188: FAG delayed

201: IL1 MUVI 1
202: IA1 MUVI 1
203: IL1 MUVI 2
204: IA1 MUVI 2
Fixede744 Thu May 24 22:38:44 2018 e744 Must2+lise teams RUNGeneralCH2Run Beam Spiral 14N centered
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
Attachment 1: MM1234TY_14N_Centered.png
MM1234TY_14N_Centered.png
Attachment 2: MM1234TX_14N_Centered.png
MM1234TX_14N_Centered.png
Attachment 3: MM1234Y_14N_Centered.png
MM1234Y_14N_Centered.png
Attachment 4: MM1234_14N_Centered.png
MM1234_14N_Centered.png
Attachment 5: MM5_14N_Centered.png
MM5_14N_Centered.png
Attachment 6: TAC_14N_Centered.png
TAC_14N_Centered.png
Attachment 7: MM_IMPACT_MATRIX_14N_Centered.png
MM_IMPACT_MATRIX_14N_Centered.png
Fixede744 Thu May 24 22:45:36 2018 e744 Must2+lise teams RUNGeneralCH2Run 1001 Beam Spiral 14N centered
Run 1001, cible n°6: 183 um
start @ 21h55; Stop @ 22h36
Shift teams: François, Iulan, Freddy, Fairouz, Valérian, Valérie, Mihail
LISE teams during evening: Omar Kamalou, Luc Perrot, Pierre Delahaye
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6

see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
Attachment 1: scaler-run1001.png
scaler-run1001.png
Attachment 2: MMimpactsRun1001.png
MMimpactsRun1001.png
Fixede744 Fri May 25 22:46:26 2018 e744 Must2+LISE teams, edit ValérieRUNGeneralCH2RUN 2004

Run 2004 Date : 25/05/2018 22:45:58 25/05/2018 23:17:39
End of Run, error Narval see snapshot ProblemNarvalRCCEndRun2004.png

14O beam ; Target n°6 CH2
trig MUST2, CATS, EXL, PPT
T4 ON HT after trip>>>>>>>>>>cf PLOT HT ON
No Lise trigger; All trigger MUST2, CatsDiv, Div =3.10**4
EXL div 300; PPT div 100
CATS 2 10**5 pps

MUST2 thresholds at 1 MeV for all Telescopes
ConfigDASThresTel5at1MeV.png ConfigDASThresMUST2at1MeV.png
NB: problem on EXL ch17 and ch18 cf EXLCsIRawPROBLEMCh17and18Run2004.png

signed by the LISE Jean-Charles, Luc, and MUST2 teams, Iulan, Valérian, Fairouz, Nicolas, Valérie, Valdir

Attachment 1: ConfigDASThresTel5at1MeV.png
ConfigDASThresTel5at1MeV.png
Attachment 2: ConfigDASThresMUST2at1MeV.png
ConfigDASThresMUST2at1MeV.png
Attachment 3: scalersDuringRun2004.png
scalersDuringRun2004.png
Attachment 4: EXLCsIRawPROBLEMCh17and18Run2004.png
EXLCsIRawPROBLEMCh17and18Run2004.png
Attachment 5: ProblemNarvalRCCEndRun2004.png
ProblemNarvalRCCEndRun2004.png
Attachment 6: HT_MUST2afterSettingT4ON.png
HT_MUST2afterSettingT4ON.png
Fixede744 Fri May 25 23:26:23 2018 e744 Must2+LISE teams, edit ValérieRUNGeneralCH2START NARVAL, new version
the NARVAL version is now reinstalled by Fred Saillant.
see plot ResolProblemNarvalEndofRun25may23h.png
Attachment 1: ResolProblemNarvalEndofRun25may23h.png
ResolProblemNarvalEndofRun25may23h.png
Fixede744 Fri May 25 22:03:12 2018 e744 Must2+LISE teamsRUNGeneralCH2RUNS 2000, 2001
Beam 14O
Run 2000 start with all triggers, including LISE trigger, during 1 minute for tests.
start 22:00:58; stop

Run 2001 start 25-05-18_22h01m19s ; stop 22h15
Run 2002 start 25-05-18_22h16m01s ;stop 22h30 problem
Run 2003 start at 22:16 stop 22:30 DAQ blocked
No Lise trigger; All trigger MUST2, CatsDiv, Div =3.10**4
EXL div 300; PPT div 100
CATS from 440-500 pps
opening FH31 slits

Target n°6 CH2

signed by the LISE Jean-Charles, Luc, and MUST2 teams, Iulan, Valérian, Fairouz, Nicolas, Valérie, Valdir

NB the MMimpact plot showed that T4 was not counting. Ord 4 was not counting in the scalers.
>>>>>>>>>>>>>>>Telescope T4 Dssd has tripped during run 2002-2003 cf MMimpactRun2003.png
Thne HT on T4 was put on for next runs, see Run 2005,... in the next entries.
Attachment 1: ProblemStartStop2002Narval.png
ProblemStartStop2002Narval.png
Attachment 2: MMimpactRun2003.png
MMimpactRun2003.png
Attachment 3: Run2001_MMimpact14O.png
Run2001_MMimpact14O.png
Attachment 4: Scalers_duringRun2002.png
Scalers_duringRun2002.png
Attachment 5: Scalers_duringRun2003.png
Scalers_duringRun2003.png
Attachment 6: HT_MUST2afterSettingT4ON.png
HT_MUST2afterSettingT4ON.png
Fixede744 Thu May 24 19:20:40 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralN/ARun 460-Spiral 14N test
Run 460
Triggers Must2 Telescopes T1 to T5
( MM1 to MM5)
checking beam focalisation and centering on Must5
see plot
cf scalers during Run
Attachment 1: Run460plotMM5impact.png
Run460plotMM5impact.png
Attachment 2: ScalersDuringRun460.png
ScalersDuringRun460.png
Attachment 3: MM5impactendofRun460beam.png
MM5impactendofRun460beam.png
Fixede744 Thu May 24 19:32:31 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralN/ARun 461-Spiral 14N test
Run 461
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)
after retuning of the beam (on PR62)
checking beam focalisation and centering on Must5
see plot
cf scalers during Run
Attachment 1: ScalersDuringRun461.png
ScalersDuringRun461.png
Attachment 2: MM5impactDuringRun461.png
MM5impactDuringRun461.png
Fixede744 Thu May 24 20:31:30 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralN/ARun 463 Beam Spiral 14N test
Run 463 focalisation on Must2 24May at 20h30pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact
cf scalers end of run.

NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns).
Attachment 1: scalersendOfRun463.png
scalersendOfRun463.png
Attachment 2: MM5stripsXYERun463.png
MM5stripsXYERun463.png
Attachment 3: MM5ImpactsRun463.png
MM5ImpactsRun463.png
Fixede744 Thu May 24 21:05:19 2018 e744 Must2 + Lise teams (edit: Valérie)MUST2HardwareN/Achange of STOP MUST2
The STOP of MUST2 with CATS is now directly the CATS "delayed signal".
No coincidence with FAG.
NB: the CATS "delayed signal"is the fast time signal from CATS in D4, which is sent to the DAQ area of D6, then delayed.
The delay is at present 50 ns, it was changed during the run 463 (previous value was 500 ns).

Total time to go between exp area to DAQ room then back to exp area is measured to be 780ns.
-->approximately we have the time of 390 to 400 ns to go between DAQ room and D6 exp area.
Fixede744 Thu May 24 21:28:45 2018 e744 Must2 + Lise teams (edit: Valérie)RUNGeneralCH2Run 464 Beam Spiral 14N test
Run 464 focalisation on Must2 24May at 21h25m storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

focalisation on target ; Target CH2 187µm position num6
see plot of beam impact
cf scalers end of run.
14N 7.6791 MeV/n 14N7+ Brho = 0.79679 T.m measured at CIME
!!!NOTE THAT The delay is at present 50 ns on the Cats signal "CATS delayed"
it was changed during the run 463 (the previous value was 500 ns).
Attachment 1: TAcrefGAGmmCatsHFRun464.png
TAcrefGAGmmCatsHFRun464.png
Attachment 2: ScalersDuringRun464at21h30.png
ScalersDuringRun464at21h30.png
Attachment 3: MM5ImpactsRun464.png
MM5ImpactsRun464.png
Attachment 4: MM5ImpactsRun464zoom.png
MM5ImpactsRun464zoom.png
Attachment 5: MM5StrXYRun464.png
MM5StrXYRun464.png
Fixede744 Thu May 24 19:34:40 2018 e744 Must2 + Lise teamsRUNGeneralN/Atuning Wien-Spiral 14N test
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact Wien filter +0.4 kV, +0.4 kV
cf scalers during Run
Fixede744 Thu May 24 20:18:00 2018 e744 Must2 + Lise teamsRUNGeneralN/Atuning Wien-Spiral 14N test
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact Wien filter +0.4 kV, +0.4 kV
cf scalers during Run
Attachment 1: MM5impactWien2kV.png
MM5impactWien2kV.png
Attachment 2: MM5stripsXYWien0.4et0.4kV.png
MM5stripsXYWien0.4et0.4kV.png
Attachment 3: MM5impactXYWien0.4et0.4kV.png
MM5impactXYWien0.4et0.4kV.png
Attachment 4: scalersduringTuningwithWienfilter.png
scalersduringTuningwithWienfilter.png
Fixede744 Thu May 24 20:19:19 2018 e744 Must2 + Lise teamsRUNGeneralN/ABeam centering on MM5-Spiral 14N test
Run 24May at 19h50-20pm no storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact when the beam is centered
cf scalers during Run
Attachment 1: MM5strXYWienCenter.png
MM5strXYWienCenter.png
Attachment 2: MM5impactXYWienCenter.png
MM5impactXYWienCenter.png
Attachment 3: ScalersTuningWienCenterMM5.png
ScalersTuningWienCenterMM5.png
Fixede744 Thu May 24 20:21:57 2018 e744 Must2 + Lise teamsRUNGeneralN/ARun 462 Beam centering on MM5-Spiral 14N test
Run 462 focalisation on target 24May at 20h15pm storage
Triggers Must2 Telescopes T1 to T5
(MM1 to MM5)

see plot of beam impact the beam is centered
cf scalers during Run and end of run.
Attachment 1: MM5ImpactsRun462.png
MM5ImpactsRun462.png
Attachment 2: BeamOnMM5stripsXYRun462.png
BeamOnMM5stripsXYRun462.png
Attachment 3: ScalersduringRun462.png
ScalersduringRun462.png
Attachment 4: ScalersEndRun462.png
ScalersEndRun462.png
Pinnede744 Thu May 24 23:20:40 2018 e744 Must2 + Lise teamsRUNGeneralCH2run 1002
run 1002: 14N beam, CH2 187 um
trigger: MM1,2,3,4,5 + CATS%, EXL%, PPT%
start: 22h41
stop: 23h18
Attachment 1: scaler-stop-run1002.png
scaler-stop-run1002.png
Fixede744 Fri May 25 21:34:19 2018 e744 Iulan, Fairouz, ValerieDAQHardwareCH2Problem of FAG validation +change of ADC parameter for TAC signal
The Time signal MM_PPT is now in the parameter MCP_HF of the ADC.
The problem was on the FAG signal validation (bad output of the discriminator)

the TAC MM_PPT with start FAG and STOP ppt is now coded in the entry of ADC MCP_HF , add=9 (channel 10)
Previously it was add =3 (channel 4).

Problem of DAQ encountered in the evening (20 pm) no DAQ counting, no FAG from GMT: we first reboot on software (Terminal iolan: iolan must2 all; reboot).
but the DAQ was still blocked.
We phoned to the hardware astreinte (Charles H), he told us to reset the hardware.
The problem was solved by resetting the crates (reset button on the crates ganlx1 and ganlx14 in D6).
The DAQ restarted correctly.
Attachment 1: ProblemGMTtriggerVXI.png
ProblemGMTtriggerVXI.png
Fixede744 Fri May 25 17:51:45 2018 e744 Iulan ValérieRUNGeneralCH2Run 1008 starting runs with 14N
BAD RUN FOR 14N

Run 1008 BAD RUN 0 Events
14N beam rate high intensity ~ 0.1 nA
CH2 n°6
All triggers ON
MM1 to MM5 ; cats div
EXL PPT and LISE
NB: at the beginning there was no HV on EXL then put ON.
No beam at the end of the run.
NB: The power is around 1 kW on machine production target.
Attachment 1: BTdssdMust2_25May18.png
BTdssdMust2_25May18.png
Attachment 2: HTdssdMust2_25May.png
HTdssdMust2_25May.png
Attachment 3: HV_EXL_25May.png
HV_EXL_25May.png