Status ExpNbr Date Authordown Type Category Target-Source Subject Text Attachments
Fixed  Fri Jul 7 18:04:58 2017 e748OFFLINEGeneral Kinematic Line12Be(d,3He)11Li    kine.pdf 
Fixede748 Sat Jul 8 16:39:00 2017 e748RUNGeneralCD2Stop run 372 - CHIO digitizer lost parameters    
Fixede748 Sat Jul 8 16:41:57 2017 e748RUNGeneralCD2Run 373Restart after rewriting parameters onto CHIO
digitizer
Same conditions as previous run
 scalers_run373.pngCATS_raw_run373.pngCATS_run373.png 
Fixede748 Sat Jul 8 17:04:25 2017 e748RUNGeneralCD2RUN 374We stopped run 373 to check the MUVI scalers
on the DAS.
We wrote the parameters onto the CHIO digitizer
 scalers_run374.png 
Fixede748 Sat Jul 8 19:41:25 2017 e748RUNGeneralCD2Run 374 (file change)19:29 data file change -> run_0374.dat.08-07-17_16h57m56s.2
Previous change : 18:11 -> run_0374.dat.08-07-17_16h57m56s.1
 scalers_run374_2.pngCATS_run374_2.pngCATS_raw_run374_2.png 
Fixede748 Sat Jul 8 20:49:48 2017 e748BEAMGeneralCD2Beam position on targetThe beam spot on target has shifted upwards
by ~3 mm since beginning of 10Be run (see
run 366 and attached plot from run 374, July
 TargetPos_run374_20h48.png 
Fixede748 Sat Jul 8 21:04:07 2017 e748BEAMGeneralCD2Update: beam position on targetAt ~21:00 we called PCP: They adjusted the
DC41VE steerer to center vertically the beam
on our target.
 TargetPos_run374_afterDC41VE.png 
Fixede748 Sat Jul 8 21:53:58 2017 e748BEAMGeneralCD2Scalers run 374Counting rates keep decreasing though the
primary is still ~4.5 uAe and the beam is
centered on our target.
 scalers_run374_21h49.png 
Fixede748 Sat Jul 8 23:22:18 2017 e748BEAMGeneralCD2Update on counting rates + scalers18O 4.5 uAe
CATS1 91 kcps
CATS2 114 kcps
 scalers_run374_23h21.png 
Fixede748 Sun Jul 9 16:37:21 2017 e748CHIOGeneralCD2CHIO digitizer outCHIO digitizer was out in run 378   
Fixede748 Sun Jul 9 16:43:40 2017 e748OFFLINEGeneralCD2Elastic scattering MM6&7Telescope 6&7 are analyzed for 12Be beam.
The energy of Si vs angle plot for each telescope
(CsI veto and beam position gate) are shown.
 12Be_elastic.pdf 
Fixede748 Sun Jul 9 18:44:38 2017 e748BEAMGeneralCD2LOST BEAM around 18h30Vaccuum was lost after CSS2, so we lost the
primary beam (18:30)
Operators called the astreinte.
  
Fixede748 Sun Jul 9 20:38:11 2017 e748BEAMGeneralCD2LOST BEAM around 18h30Seems there is a water leak in the beam line
near alpha. 
Astreinte is at work. 
  
Fixede748 Sun Jul 9 23:57:34 2017 e748BEAMGeneralCD2NUMBER FOR PCPThere is a major shutdown of the GANIL phone
system. 
You can not call the pcp via the usual extention;
  
Fixede748 Mon Jul 10 00:23:41 2017 e748RUNGeneralCD2Return of the beam (Jedi not available)Beam is back.
JCT refoc the beam on target (attached pictures).
All god beside that. Still no phone on campus!
 CATS.png 
Fixede748 Mon Jul 10 00:35:29 2017 e748RUNGeneralCD2Run 380Started at 0:02

18O 4.3 uAe, fluctuating
 scalers_run380.png 
Fixede748 Mon Jul 10 01:34:12 2017 e748RUNGeneralCD2Run 380 (file change)Data file change at 1:18 -> run_0380.dat.10-07-17_00h02m00s.1

18O 4.5 uAe
 scalers_run380_1.png 
Fixede748 Mon Jul 10 02:04:33 2017 e748CATSGeneralCD2CATS raw strips and trajectories   CATS_raw_run380_1.pngCATS_run380_1.png 
Fixede748 Mon Jul 10 02:47:27 2017 e748RUNGeneralCD2Run 380 (file change)2:26 data file change -> run_0380.dat.10-07-17_00h02m00s.2

18O 4.5 uAe
 Scalers_run_380_2.png 
Fixede748 Mon Jul 10 03:34:24 2017 e748RUNGeneralCD2Run 380 (file change)3:33 data file change -> run_0380.dat.10-07-17_00h02m00s.3

18O 4.5 uAe
 scalers_run380_3.png 