Fixed, , Fri Jul 7 18:04:58 2017, e748, OFFLINE, General, , Kinematic Line12Be(d,3He)11Li  kine.pdf
 
Fixed, e748, Sat Jul 8 16:39:00 2017, e748, RUN, General, CD2, Stop run 372 - CHIO digitizer lost parameters 
 
Fixed, e748, Sat Jul 8 16:41:57 2017, e748, RUN, General, CD2, Run 373 scalers_run373.pngCATS_raw_run373.pngCATS_run373.png
Restart after rewriting parameters onto CHIO digitizer
Same conditions as previous run
Fixed, e748, Sat Jul 8 17:04:25 2017, e748, RUN, General, CD2, RUN 374 scalers_run374.png
We stopped run 373 to check the MUVI scalers on the DAS.
We wrote the parameters onto the CHIO digitizer and restarted -> Run 374
Same conditions as before.
Fixed, e748, Sat Jul 8 19:41:25 2017, e748, RUN, General, CD2, Run 374 (file change) scalers_run374_2.pngCATS_run374_2.pngCATS_raw_run374_2.png
19:29 data file change -> run_0374.dat.08-07-17_16h57m56s.2
Previous change : 18:11 -> run_0374.dat.08-07-17_16h57m56s.1
Fixed, e748, Sat Jul 8 20:49:48 2017, e748, BEAM, General, CD2, Beam position on target TargetPos_run374_20h48.png
The beam spot on target has shifted upwards by ~3 mm since beginning of 10Be run (see run 366 and attached plot from run 374, July 8 20:48).
Fixed, e748, Sat Jul 8 21:04:07 2017, e748, BEAM, General, CD2, Update: beam position on target TargetPos_run374_afterDC41VE.png
At ~21:00 we called PCP: They adjusted the DC41VE steerer to center vertically the beam on our target.
See attached plot.
Fixed, e748, Sat Jul 8 21:53:58 2017, e748, BEAM, General, CD2, Scalers run 374 scalers_run374_21h49.png
Counting rates keep decreasing though the primary is still ~4.5 uAe and the beam is centered on our target.
We called François de Oliveira who helped us to print the parameters of the line. We go to the PCP with the print.
Fixed, e748, Sat Jul 8 23:22:18 2017, e748, BEAM, General, CD2, Update on counting rates + scalers scalers_run374_23h21.png
18O 4.5 uAe
CATS1 91 kcps
CATS2 114 kcps
Fixed, e748, Sun Jul 9 16:37:21 2017, e748, CHIO, General, CD2, CHIO digitizer out 
CHIO digitizer was out in run 378
Fixed, e748, Sun Jul 9 16:43:40 2017, e748, OFFLINE, General, CD2, Elastic scattering MM6&7 12Be_elastic.pdf
Telescope 6&7 are analyzed for 12Be beam.
The energy of Si vs angle plot for each telescope (CsI veto and beam position gate) are shown.
The red lines are kinematics for 12Be(d,d) and (p,p).
Fixed, e748, Sun Jul 9 18:44:38 2017, e748, BEAM, General, CD2, LOST BEAM around 18h30 
Vaccuum was lost after CSS2, so we lost the primary beam (18:30)
Operators called the astreinte.
Fixed, e748, Sun Jul 9 20:38:11 2017, e748, BEAM, General, CD2, LOST BEAM around 18h30 
Seems there is a water leak in the beam line near alpha. 
Astreinte is at work. 
Fixed, e748, Sun Jul 9 23:57:34 2017, e748, BEAM, General, CD2, NUMBER FOR PCP 
There is a major shutdown of the GANIL phone system. 
You can not call the pcp via the usual extention; instead call : 02 31 43 59 77
(the phone number is on a paper next to the LISE pupitre phone)
Fixed, e748, Mon Jul 10 00:23:41 2017, e748, RUN, General, CD2, Return of the beam (Jedi not available) CATS.png
Beam is back.
JCT refoc the beam on target (attached pictures).
All god beside that. Still no phone on campus!
Fixed, e748, Mon Jul 10 00:35:29 2017, e748, RUN, General, CD2, Run 380 scalers_run380.png
Started at 0:02

18O 4.3 uAe, fluctuating
Fixed, e748, Mon Jul 10 01:34:12 2017, e748, RUN, General, CD2, Run 380 (file change) scalers_run380_1.png
Data file change at 1:18 -> run_0380.dat.10-07-17_00h02m00s.1

18O 4.5 uAe
Fixed, e748, Mon Jul 10 02:04:33 2017, e748, CATS, General, CD2, CATS raw strips and trajectories CATS_raw_run380_1.pngCATS_run380_1.png
 
Fixed, e748, Mon Jul 10 02:47:27 2017, e748, RUN, General, CD2, Run 380 (file change) Scalers_run_380_2.png
2:26 data file change -> run_0380.dat.10-07-17_00h02m00s.2

18O 4.5 uAe
Fixed, e748, Mon Jul 10 03:34:24 2017, e748, RUN, General, CD2, Run 380 (file change) scalers_run380_3.png
3:33 data file change -> run_0380.dat.10-07-17_00h02m00s.3

18O 4.5 uAe