MUST2 SAMURAI_2018 S3-LEB-LPC SUPERNEMO MUGAST EXPAND SCALP GALATRON HiCARI VELO
  MUST2, Page 13 of 48  Not logged in MUST2
Fixed, e748, Mon Jul 3 03:48:57 2017, e748, OFFLINE, General, , Correlation Test on Run 104 run_104_shifting.pdf

We analysed run 104 to check the correlation of events coded in different crates. It is clear now that the events from the MUST2 crate are shifted by +1 with respect to the CHIO crate.

On the following plot, parameters coded in the two different crates (MUST2 and CHIO) are displayed :
- (left) unshifted Vs unshifted:
chShifted.Draw("ADC_VOIE_29:ADC_CHIO_V15");
- (right) shifted(N+1) Vs unshifted(N):
chShifted.Draw("ADC_VOIE_29:AutoTree.ADC_CHIO_V15");

To check the correlation on a converted root run (here example for run 104), execute the macro:
> root
> .L CheckDataShift.C
> CheckDataShift(104)
Fixed, e748, Mon Jul 3 06:26:24 2017, e748, OTHER, General, N/A, Damned ELOG  
We just recovered the ELOG after 5-6 hrs out of order
Fixed, e748, Mon Jul 3 06:30:54 2017, e748, BEAM, General, N/A, 12Be beam rate  
Final 12Be beam rate as obtained by JCT with present wedge is about 6.10^3 per euA in D6
expected Imax of 18O is 6-7 euA

purity is 99%
Fixed, e748, Mon Jul 3 06:30:58 2017, e748, DAQ, Software, , PROBLEM of conversion for RUN with even number 
IMPORTANT

We realized that starting at run 160 (included) all run with an even number (160,162,etc) give an error at conversion:

--> Error : 8018c82 Error in getting infomation in your file!
May be no Ganil format run !
or your are not a the begining of a run (try a Skip('r') before))
code erreur sortie rd_evstr (en hexa) = 1101--> Error : 8018001 Initialization of event structure: Event Struct :size = 8192 Struc = 38891632


This has to be investigated by experts of the DAQ when they will come...
Fixed, e748, Mon Jul 3 07:04:30 2017, e748, OTHER, General, N/A, tritons 
Count rate in ZD plastic is bout 2;5 times larger than in CATS1 and CATS2, probably due to tritons
Fixed, e748, Mon Jul 3 07:06:17 2017, e748, RUN, General, CD2, RUN 173 - First Physics with 12Be run173_MUST2_Ecal.pngrun173_MUST2_dEE.pngCapture-1.png
RUN 173

START: 6H11
STOP: 7H31

PRIMARY BEAM: 1.2 uA

TARGET: CD2 (2.5 mg.cm-2, to be checked)

TRIGGER: MUST2 1 to 8

BEAMRATE: 8 kHz on CATS2
22 kHz on PL
Fixed, e748, Mon Jul 3 07:52:36 2017, e748, RUN, General, CD2, RUN 175 
RUN 175


START: 7h45
STOP:

PRIMARY BEAM: 1.2 uA

TARGET: CD2 (2.5 mg.cm-2, to be checked)

TRIGGER: MUST2 1 to 8

BEAMRATE: 9 kHz on CATS2
22 kHz on PL

(RUN 174 junk - skipped on purpose)
Fixed, e748, Mon Jul 3 07:52:39 2017, e748, RUN, General, CD2, RUN 175 
RUN 175


START: 7h45
STOP:

PRIMARY BEAM: 1.2 uA

TARGET: CD2 (2.5 mg.cm-2, to be checked)

TRIGGER: MUST2 1 to 8

BEAMRATE: 9 kHz on CATS2
22 kHz on PL

(RUN 174 junk - skipped on purpose)
Fixed, e748, Mon Jul 3 17:31:08 2017, e748, OFFLINE, General, CD2, BEAM and FRAGMENT PID run_203_PID_SiD6.pdfrun_203_PID_beam.pdfrun_203_PID_reactionfrag.pdf
We used the Si in D6 and the TOF(CATS1-CAVIAR) to identify the beam nuclei.

Using a gate on 12Be and 11Be, we looked at the PID using Qplastic VS TOF(CATS1-CAV) and TOF(CATS1-PL).

It seems that we can separate 12Be and 11Be using these two spectras.
Fixed, e748, Mon Jul 3 20:02:46 2017, e748, OFFLINE, General, CD2, run217 Capture.png
PID run 217
trigger = plast
Fixed, e748, Mon Jul 3 21:13:18 2017, e748, OFFLINE, General, N/A, cats Capture.png
run222 cats
Fixed, , Mon Jul 3 22:40:33 2017, e748, RUN, General, , Plastic_Cats_T run_223_tac2.pdfrun_223_tac1.pdf
Tac run_223

Range: T_CATS1_CAV 1 µs
T_CATS1_2 200ns
T_MUVI_CATS1 500ns
T_PL_CATS1 1µs
T_PLch_CATS1 1µs
T_PL_CATS2 1µs
T_Pl_CHIO 2µs

Fixed, e748, Tue Jul 4 01:21:04 2017, e748, OFFLINE, General, CD2, run 236 Capture.png
cats > target
cats > target, gated by must
Fixed, e748, Tue Jul 4 04:01:50 2017, e748, RUN, Hardware, , RUN249 
RUN249

Same setting as RUN248.
run_0249.dat.04-07-17_03h56m24s
Start 3h56 Gtape OK
Stop 4h58
608 MB
Fixed, e748, Tue Jul 4 05:08:30 2017, e748, MUST2, Hardware, , MUST2 signql check in offline analysis 
RUN248
MUST2 DSSD XE signal for all telescopes T1-T8 confirmed.
MUST2 DSSD YE signal for all telescopes T1-T8 confirmed.
MUST2 DSSD XT signal for all telescopes T1-T6,T8 confirmed. No T7.
MUST2 DSSD XT signal for all telescopes T1-T4,T6,T8 confirmed. No T5,7.

MUST2 Csi E signal for all telescopes T1-T4,T6,T7 confirmed.
MUST2 Csi t signal for no telescopes T1-T8. This is normal.

MUST2 SiLi E signal for all telescopes T5,T8 confirmed.
MUST2 SiLi T signal for all telescopes T5,T8 confirmed.
Fixed, e748, Tue Jul 4 05:11:20 2017, e748, MUST2, Hardware, , MUST2 signql check in offline analysis 10x
RUN248
MUST2 DSSD XE signal for all telescopes T1-T8 confirmed.
MUST2 DSSD YE signal for all telescopes T1-T8 confirmed.
MUST2 DSSD XT signal for all telescopes T1-T6,T8 confirmed. No T7.
MUST2 DSSD XT signal for all telescopes T1-T4,T6,T8 confirmed. No T5,7.

MUST2 Csi E signal for all telescopes T1-T4,T6,T7 confirmed.
MUST2 Csi t signal for no telescopes T1-T8. This is normal.

MUST2 SiLi E signal for all telescopes T5,T8 confirmed.
MUST2 SiLi T signal for all telescopes T5,T8 confirmed.
Fixed, e748, Tue Jul 4 05:20:31 2017, e748, RUN, Hardware, , RUN250 
Same setting as RUN248.
run_0250.dat.04-07-17_04h58m50s
start 4h58 Gtape ok
Stop. The HT for SiLi T5 1 tripped off with the over current alert (current limit set 25 micro A for 400 V). Turned on the HT and restarted the run. The current was slowly increasing over time. Watch out the current read.
Fixed, e748, Tue Jul 4 05:23:20 2017, e748, CATS, Software, , CATS signal run248_CATS1XQ.pngrun248_CATS1YQ.pngrun248_CAT2XQ.pngrun248_CATS2YQ.png
RUN248
The chqrge distribution of CATS1&2, X&Y
Gate:CATSdiv trigger
Fixed, e748, Tue Jul 4 07:00:55 2017, e748, RUN, Hardware, , RUN252 
Same setting as RUN248.
RUN251 junk header
run_0252.dat.04-07-17_05h33m06s
Start 5h33 end 6h30.
No issue during the run.
Fixed, e748, Tue Jul 4 07:01:50 2017, e748, RUN, Hardware, , RUN254 
Same setting as RUN248.
RUN253 junk header
run_0254.dat.04-07-17_06h32m10s
Start 6h32 - 7h33 no issue

ELOG Home Page